Verne Data Centers
Data centers operated by Verne that we have verified: location, status and capacity, each checked against its source.
In short
As of 25 November 2026, DC Market Insights tracks 3 data centers operated by Verne in 2 countries, of which 2 are operational. Stated operational capacity is 210 MW, with a further 70 MW under construction and — planned. The pipeline is 0.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 3 of 3 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Verne data centers: key facts
- Capacity under construction or planned (70 MW) is 0.3 times the operational base of 210 MW.
- Its largest operational site is Verne Iceland campus in Reykjanesbær, Iceland at 140 MW.
- The largest project in the pipeline is Verne Mäntsälä (Kapuli) (70 MW, under construction).
- Finland accounts for 50% of tracked capacity (2 facilities).
Verne development pipeline
Under construction and planned facilities with a stated capacity, largest first. 70 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Verne Mäntsälä (Kapuli)Verne | Mäntsälä, Finland | Under construction | Colocation | 70 MW |
Facilities
3 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Verne Iceland campusColocation Cooling: Hybrid | Reykjanesbær, Iceland | Operational | 140 MW | — | Operator / official |
| Verne Mäntsälä (Kapuli)Colocation | Mäntsälä, Finland | Under construction | 70 MW total | — | Operator / official |
| Verne Vantaa campus (The Air)Colocation | Vantaa, Finland | Operational | 70 MW total | — | Operator / official |
Market position
How Verne compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Finland, Verne ranks #7 of 24 tracked operators by capacity, with 4.8% of the country’s tracked MW.
- Finland has 48 tracked data centers from 24 operators: 230 MW operational and 2,661 MW under construction or planned.
- Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).
- In Iceland, Verne ranks #1 of 3 tracked operators by capacity, with 49% of the country’s tracked MW.
Data center operators in Finland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| atNorth | 4 | 41.6 MW | 590 MW |
| DayOne | 1 | — | 560 MW |
| Nebius | 2 | 75 MW | 310 MW |
| FCDC Corp | 1 | — | 250 MW |
| AmpTank | 1 | — | 200 MW |
| Compute Nordic | 1 | — | 165 MW |
| Pure DC | 1 | — | 110 MW |
| HyperCo | 3 | — | 100 MW |
All data centers in Finland Power and policy in Finland
Data center operators in Iceland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| atNorth | 3 | 136 MW | — |
| Borealis Data Center | 3 | 10 MW | — |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Verne operate?
DC Market Insights tracks 3 Verne data center(s) in 2 countries as of November 2026: 2 operational, 1 under construction and 0 planned.
Which other companies operate data centers in Finland?
Besides Verne, the largest operators we track in Finland by capacity are atNorth, DayOne, Nebius, FCDC Corp and AmpTank. The Finland page lists all 24 operators.
What rules apply to data centers in Finland?
Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.