As of 25 November 2026, DC Market Insights tracks 3 data centers operated by Verne in 2 countries, of which 2 are operational. Stated operational capacity is 210 MW, with a further 70 MW under construction and — planned. The pipeline is 0.3 times the capacity already operating.

3Facilities tracked
2Countries
210 MWOperational (2 sites)
70 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 3 facilities have a stated capacity; the others are counted as sites only.

Verne Mäntsälä (Kapuli) · Verne · Mäntsälä (approximate location)Verne Vantaa campus (The Air) · Verne · Vantaa (approximate location)Verne Iceland campus · Verne · Reykjanesbær (exact location) · Cooling: Hybrid
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Verne data centers: key facts

  • Capacity under construction or planned (70 MW) is 0.3 times the operational base of 210 MW.
  • Its largest operational site is Verne Iceland campus in Reykjanesbær, Iceland at 140 MW.
  • The largest project in the pipeline is Verne Mäntsälä (Kapuli) (70 MW, under construction).
  • Finland accounts for 50% of tracked capacity (2 facilities).
Capacity by status, MW
Operational210 MW
Under construction70 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Finland140 MW
Iceland140 MW

OperationalUnder construction or planned

Verne development pipeline

Under construction and planned facilities with a stated capacity, largest first. 70 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Verne Mäntsälä (Kapuli)Verne Mäntsälä, Finland Under construction Colocation 70 MW

Facilities

3 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Verne Iceland campusColocation Cooling: Hybrid Reykjanesbær, Iceland Operational 140 MW — Operator / official
Verne Mäntsälä (Kapuli)Colocation Mäntsälä, Finland Under construction 70 MW total — Operator / official
Verne Vantaa campus (The Air)Colocation Vantaa, Finland Operational 70 MW total — Operator / official

Market position

How Verne compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Finland, Verne ranks #7 of 24 tracked operators by capacity, with 4.8% of the country’s tracked MW.
  • Finland has 48 tracked data centers from 24 operators: 230 MW operational and 2,661 MW under construction or planned.
  • Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).
  • In Iceland, Verne ranks #1 of 3 tracked operators by capacity, with 49% of the country’s tracked MW.

Data center operators in Finland

Tracked facilities4824 operators
Operational capacity230 MW2,661 MW in the pipeline
Verne rank by capacity#7of 24 operators · 4.8%
Industrial power price58.4 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
atNorth441.6 MW590 MW
DayOne1—560 MW
Nebius275 MW310 MW
FCDC Corp1—250 MW
AmpTank1—200 MW
Compute Nordic1—165 MW
Pure DC1—110 MW
HyperCo3—100 MW

All data centers in Finland Power and policy in Finland

Data center operators in Iceland

Tracked facilities73 operators
Operational capacity286 MW— in the pipeline
Verne rank by capacity#1of 3 operators · 49%
Industrial power price42.9 USD/MWh2022
OperatorFacilitiesOperational MWPipeline MW
atNorth3136 MW—
Borealis Data Center310 MW—

All data centers in Iceland Power and policy in Iceland

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Verne operate?

DC Market Insights tracks 3 Verne data center(s) in 2 countries as of November 2026: 2 operational, 1 under construction and 0 planned.

Which other companies operate data centers in Finland?

Besides Verne, the largest operators we track in Finland by capacity are atNorth, DayOne, Nebius, FCDC Corp and AmpTank. The Finland page lists all 24 operators.

What rules apply to data centers in Finland?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst