Proprietary data

Cibicom Data Centers

Data centers operated by Cibicom that we have verified: location, status and capacity, each checked against its source.

In short

As of 26 October 2026, DC Market Insights tracks 5 data centers operated by Cibicom in 1 country, of which 5 are operational.

5Facilities tracked
1Countries
—Operational (5 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 5 facilities have a stated capacity; the others are counted as sites only.

Cibicom Datacenter Søsterhøj · Cibicom · Højbjerg (approximate location)Cibicom Datacenter Kappa · Cibicom · Hinnerup (approximate location)Cibicom Datacenter Taulov · Cibicom · Fredericia (approximate location)Cibicom Datacenter Ballerup · Cibicom · Ballerup (approximate location)Cibicom Datacenter Hove · Cibicom · Smørum (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Cibicom data centers: key facts

  • 0 of 5 facilities have a capacity stated by their source; the totals above count only those.

Facilities

5 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Cibicom Datacenter BallerupColocation Ballerup, Denmark Operational — — Operator / official
Cibicom Datacenter HoveColocation Smørum, Denmark Operational — — Operator / official
Cibicom Datacenter KappaColocation Hinnerup, Denmark Operational — — Operator / official
Cibicom Datacenter SøsterhøjColocation Højbjerg, Denmark Operational — — Operator / official
Cibicom Datacenter TaulovColocation Fredericia, Denmark Operational — — Operator / official

Market position

How Cibicom compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Denmark, Cibicom is one of 13 operators we track.
  • Denmark has 25 tracked data centers from 13 operators: 54.6 MW operational and 844 MW under construction or planned.
  • Industrial electricity in Denmark costs 134 USD/MWh (2025, latest official figure).

Data center operators in Denmark

Tracked facilities2513 operators
Operational capacity54.6 MW844 MW in the pipeline
Cibicom rank by capacity#8of 13 operators
Industrial power price134 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
GARBE Data Centers1—350 MW
atNorth230 MW250 MW
Prime Data Centers1—160 MW
STACK Infrastructure1—72 MW
Digital Realty423 MW—
Thylander1—11.5 MW
Penta Infra11.6 MW—
Microsoft5——

All data centers in Denmark Power and policy in Denmark

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Cibicom operate?

DC Market Insights tracks 5 Cibicom data center(s) in 1 country as of October 2026: 5 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Denmark?

Besides Cibicom, the largest operators we track in Denmark by capacity are GARBE Data Centers, atNorth, Prime Data Centers, STACK Infrastructure and Digital Realty. The Denmark page lists all 13 operators.

What rules apply to data centers in Denmark?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Denmark, including 1 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst