Proprietary data

Data Centers in Denmark

Every data center in Denmark that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 33 data centers in Denmark run by 15 operators: 23 operational, 1 under construction and 9 planned. Stated operational capacity is 54.6 MW, with a further 11.5 MW under construction and 992 MW planned. atNorth holds the largest share of tracked operational capacity (55%).

33Facilities tracked
15Operators
54.6 MWOperational (23 sites)
11.5 MWUnder construction (1 site)
992 MWPlanned (9 sites)

MW = IT capacity where the source states it, otherwise total capacity. 13 of 33 facilities have a stated capacity; the others are counted as sites only.

Meta Odense Data Center · Meta · Odense (approximate location)Microsoft Denmark East – Høje Taastrup campus · Microsoft · Høje-Taastrup (approximate location)Microsoft Denmark East – Køge campus · Microsoft · Køge (approximate location)Microsoft Denmark East – Roskilde campus · Microsoft · Roskilde (approximate location)Google Fredericia · Google · Fredericia (approximate location) · Cooling: Evaporative or adiabaticApple Viborg Data Center · Apple · Viborg (approximate location)atNorth DEN01 · atNorth · Ballerup (approximate location) · Cooling: Direct liquidatNorth DEN02 Varde mega site · atNorth · Ølgod (approximate location)Bulk DK01 Esbjerg · Bulk Infrastructure · Esbjerg (approximate location)Prime Data Centers Esbjerg campus · Prime Data Centers · Esbjerg (approximate location)Dansk Data Center 1 (DDC1) Port of Esbjerg · Thylander · Esbjerg (approximate location)Microsoft Tinghøj data center (Varde) · Microsoft · Varde (approximate location)Microsoft Lunde data center (Varde) · Microsoft · Varde (approximate location)STACK COP02 Copenhagen · STACK Infrastructure · Copenhagen (approximate location)Cibicom Datacenter Søsterhøj · Cibicom · Højbjerg (approximate location)Cibicom Datacenter Kappa · Cibicom · Hinnerup (approximate location)Cibicom Datacenter Taulov · Cibicom · Fredericia (approximate location)Cibicom Datacenter Ballerup · Cibicom · Ballerup (approximate location)Cibicom Datacenter Hove · Cibicom · Smørum (approximate location)Penta Infra CPH01 · Penta Infra · Glostrup (approximate location)Kolo DK1 Skanderborg · Kolo · Skanderborg (approximate location)Kolo DK2 Aarhus · Kolo · Aarhus (approximate location)Kolo DK3 Randers · Kolo · Randers (approximate location)Kolo DK4 Viby J · Kolo · Viby J (approximate location)Kolo DK5 Copenhagen · Kolo · Copenhagen (approximate location)atNorth Ørslev (Vordingborg) · atNorth · Vordingborg (approximate location)CA Group AI data center GreenLab Skive · CA Group · Skive (approximate location)Microsoft Bramming data center (Esbjerg) · Microsoft · Bramming (approximate location)Digital Realty CPH1 · Digital Realty · Ballerup (exact location)Digital Realty CPH2 · Digital Realty · Ballerup (exact location)Digital Realty CPH3 · Digital Realty · Ballerup (exact location)Digital Realty CPH-RS · Digital Realty · Valby (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Denmark data center market: key facts

  • Capacity under construction or planned (1,004 MW) is 18.4 times the operational base of 54.6 MW.
  • The three largest operators by operational capacity, atNorth, Digital Realty and Penta Infra, hold 100% of tracked operational MW.
  • GARBE Data Centers has the largest development pipeline in Denmark: 350 MW under construction or planned.
  • The largest operational facility we track is atNorth DEN01 (atNorth, Ballerup) at 30 MW.
  • The largest project in the pipeline is GARBE Business Park Falster data center campus (350 MW, planned).
  • Falster is the largest cluster: 1 of 33 facilities and 33% of tracked capacity.
  • By type, the tracker lists 21 colocation and 12 hyperscale facilities.
  • 4 facilities publish a PUE figure; the lowest is 1.35 at Kolo DK1 Skanderborg (Kolo) and the median is 1.40.
  • 13 of 33 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational54.6 MW
Under construction11.5 MW
Planned992 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Denmark by tracked capacity, MW
atNorth340 MW
CA Group100 MW
Thylander11.5 MW

OperationalUnder construction or planned

Capacity by market in Denmark, MW
Falster350 MW
Varde250 MW
Esbjerg172 MW
Copenhagen127 MW
Skive100 MW
Zealand60 MW

OperationalUnder construction or planned

Facilities by type
Colocation21
Hyperscale12

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Denmark data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 14 October 2026. Government sources are linked; the full source list comes with the Excel data.

Denmark has no data-centre-specific incentive regime; grid capacity is the binding rule. Energinet paused new transmission connection agreements on 2 March 2026 after about 60 GW of requests and will sign new ones only from autumn 2026 under stricter maturity rules. A cross-party agreement of 1 October 2026 sets a grid priority model that puts most data centres in the last of four categories. Data centres of 500 kW IT load or more report energy performance to the EU database each year, and those above 1 MW must assess and use surplus heat where feasible. Renewables made 81.5% of supply in 2024. Klima-, Energi- og Forsyningsministeriet, 'Aftale om akutplan for elnettet'

Policy and incentives

Voting agreement on the grid emergency plan (1 Oct 2026): a four-tier priority model for grid connections places most data centres in category 4 (lowest); data centres serving critical functions can be category 1; Energinet may refuse category 3 and 4 requests. Klima-, Energi- og Forsyningsministeriet, Aftale om akutplan for elnettet

The bill was to be introduced in the Folketing after the summer 2026 recess so Energinet and grid companies can apply the rules to the autumn 2026 allocation of larger connections. Klima-, Energi- og Forsyningsministeriet, 'Bred politisk opbakning til akutplan for elnettet'

Power and grid

Energinet paused the signing of new transmission grid connection agreements on 2 March 2026; projects with signed agreements are unaffected. Energinet news (2 Mar 2026)

Energinet will process larger connection requests jointly under stricter maturity requirements and sign new agreements only from autumn 2026. Energinet news (27 May 2026)

Large industrial power price (band IE, excl. VAT) averaged 0.1183 EUR/kWh in 2025, about 133.7 USD/MWh. Eurostat nrg_pc_205

Renewables produced 81.5% of domestic electricity supply in 2024. Energistyrelsen, Energistatistik 2024

Sustainability, water and climate

Data centres with 500 kW or more of installed IT load must report energy, water, waste-heat and renewable indicators to the EU database by 15 May each year (Executive Order 926/2024). Retsinformation, BEK nr. 926 af 09/07/2024

Data centres above 1 MW rated energy input must make a cost-benefit analysis when built or substantially renovated and use surplus heat unless not technically or economically feasible (Executive Order 1167/2025, in force 11 Oct 2025). Retsinformation, BEK nr. 1167 af 02/10/2025

A kWh of electricity sold in Denmark caused 107 g of CO2 in 2024. Energistyrelsen, Bilag til Energistatistik 2024

Data rules

No data localisation rule; GDPR chapter V governs transfers outside the EU/EEA (adequacy decisions, standard contractual clauses, binding corporate rules), per Datatilsynet guidance. Datatilsynet, Vejledning om overførsel til tredjelande (April 2024)

Operators in Denmark

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Microsoft6———
Kolo5———
Cibicom5———
Digital Realty423 MW—42%
atNorth330 MW310 MW55%
Penta Infra11.6 MW—2.9%
GARBE Data Centers1—350 MW—
Bulk Infrastructure1———
Apple1———
STACK Infrastructure1—72 MW—
Meta1———
Google1———
CA Group1—100 MW—
Thylander1—11.5 MW—
Prime Data Centers1—160 MW—

Largest data center projects in Denmark

Under construction and planned facilities with a stated capacity, largest first. 11.5 MW under construction and 992 MW planned in total.

ProjectLocationStatusTypeCapacity
GARBE Business Park Falster data center campusGARBE Data Centers Falster Planned Hyperscale 350 MW
atNorth DEN02 Varde mega siteatNorth Ølgod Planned Colocation 250 MW
Prime Data Centers Esbjerg campusPrime Data Centers Esbjerg Planned Hyperscale 160 MW
CA Group AI data center GreenLab SkiveCA Group Skive Planned Colocation 100 MW
STACK COP02 CopenhagenSTACK Infrastructure Copenhagen Planned Hyperscale 72 MW
atNorth Ørslev (Vordingborg)atNorth Vordingborg Planned Colocation 60 MW
Dansk Data Center 1 (DDC1) Port of EsbjergThylander Esbjerg Under construction Colocation 11.5 MW

How Denmark compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom205541,064 MW7,741 MW
Germany20063933 MW4,386 MW
France10620338 MW2,422 MW
Finland3918230 MW1,850 MW
Sweden4117172 MW1,510 MW
Ireland421653 MW1,278 MW
Norway228446 MW820 MW
Denmark331554.6 MW1,004 MW
Russia11121516 MW425 MW
Italy189245 MW693 MW
Netherlands11034217 MW449 MW
Iceland73286 MW—

Facilities

33 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
GARBE Business Park Falster data center campusGARBE Data Centers Falster Planned 350 MW total — Trade press
atNorth DEN02 Varde mega siteatNorth
History
  1. Planned
  2. Planned
Ølgod Planned 250 MW total — Operator / official
Prime Data Centers Esbjerg campusPrime Data Centers
History
  1. Planned
  2. Announced
  3. Planned
Esbjerg Planned 160 MW IT — Operator / official
CA Group AI data center GreenLab SkiveCA Group
History
  1. Announced
  2. Planned
Skive Planned 100 MW IT — Operator / official
STACK COP02 CopenhagenSTACK Infrastructure Copenhagen Planned 72 MW IT — Operator / official
atNorth Ørslev (Vordingborg)atNorth
History
  1. Planned
  2. Planned
Vordingborg Planned 60 MW — Operator / official
atNorth DEN01atNorth Cooling: Direct liquid Ballerup Operational 30 MW total 2025 Operator / official
Digital Realty CPH3Digital Realty Ballerup Operational 14.4 MW total — Operator / official
Dansk Data Center 1 (DDC1) Port of EsbjergThylander
History
  1. Under construction
  2. Under construction
Esbjerg Under construction 11.5 MW total — Operator / official
Digital Realty CPH1Digital Realty Ballerup Operational 4.2 MW total — Operator / official
Digital Realty CPH2Digital Realty Ballerup Operational 4.1 MW total — Operator / official
Penta Infra CPH01Penta Infra Glostrup Operational 1.6 MW IT — Operator / official
Digital Realty CPH-RSDigital Realty Valby Operational 0.3 MW total — Operator / official
Apple Viborg Data CenterApple
History
  1. Operational
  2. Operational
Viborg Operational — 2020 Operator / official
Bulk DK01 EsbjergBulk Infrastructure Esbjerg Operational — — Operator / official
Cibicom Datacenter BallerupCibicom Ballerup Operational — — Operator / official
Cibicom Datacenter HoveCibicom Smørum Operational — — Operator / official
Cibicom Datacenter KappaCibicom Hinnerup Operational — — Operator / official
Cibicom Datacenter SøsterhøjCibicom Højbjerg Operational — — Operator / official
Cibicom Datacenter TaulovCibicom Fredericia Operational — — Operator / official
Google FredericiaGoogle Cooling: Evaporative or adiabatic Fredericia Operational — 2020 Operator / official
Kolo DK1 SkanderborgKolo Skanderborg Operational — — Operator / official
Kolo DK2 AarhusKolo Aarhus Operational — — Operator / official
Kolo DK3 RandersKolo Randers Operational — — Operator / official
Kolo DK4 Viby JKolo Viby J Operational — — Operator / official
Kolo DK5 CopenhagenKolo Copenhagen Operational — — Operator / official
Meta Odense Data CenterMeta
History
  1. Under construction
  2. Operational
Odense Operational — — Operator / official
Microsoft Bramming data center (Esbjerg)Microsoft
History
  1. Announced
  2. Planned
Bramming Planned — — Operator / official
Microsoft Denmark East – Høje Taastrup campusMicrosoft Høje-Taastrup Operational — — Operator / official
Microsoft Denmark East – Køge campusMicrosoft Køge Operational — — Operator / official
Microsoft Denmark East – Roskilde campusMicrosoft Roskilde Operational — — Operator / official
Microsoft Lunde data center (Varde)Microsoft Varde Planned — — Operator / official
Microsoft Tinghøj data center (Varde)Microsoft Varde Planned — — Operator / official

Get the data

Every data center in Denmark, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,360 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Denmark

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Denmark

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Denmark?

DC Market Insights tracks 33 data centers in Denmark as of November 2026: 23 operational, 1 under construction and 9 planned, run by 15 operators. The count grows as we verify more sites.

What is the data center capacity of Denmark?

Tracked operational capacity in Denmark is 54.6 MW, with 11.5 MW under construction and 992 MW planned. These totals use the capacity each source states (IT load where given) and cover 13 of 33 tracked facilities.

Which companies operate the most data center capacity in Denmark?

By tracked operational capacity, the largest operators in Denmark are atNorth (30 MW), Digital Realty (23 MW) and Penta Infra (1.6 MW).

Where are the data centers in Denmark located?

The largest clusters by tracked capacity are Falster (1 facilities), Varde (3 facilities) and Esbjerg (3 facilities). The map above shows every site.

Which new data centers are being built in Denmark?

We track 11.5 MW under construction and 992 MW planned. The largest projects are GARBE Business Park Falster data center campus (350 MW), atNorth DEN02 Varde mega site (250 MW) and Prime Data Centers Esbjerg campus (160 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy