Proprietary data

Compute Nordic Data Centers

Data centers operated by Compute Nordic that we have verified: location, status and capacity, each checked against its source.

In short

As of 26 November 2026, DC Market Insights tracks 1 data center operated by Compute Nordic in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
165 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Compute Nordic Mikkeli AI campus (Cerebras) · Compute Nordic · Mikkeli (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Compute Nordic data centers: key facts

  • The largest project in the pipeline is Compute Nordic Mikkeli AI campus (Cerebras) (165 MW, under construction).

Compute Nordic development pipeline

Under construction and planned facilities with a stated capacity, largest first. 165 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Compute Nordic Mikkeli AI campus (Cerebras)Compute Nordic Mikkeli, Finland Under construction Hyperscale 165 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Compute Nordic Mikkeli AI campus (Cerebras)Hyperscale
History
  1. Planned
  2. Under construction
Mikkeli, Finland Under construction 165 MW IT — Trade press

Market position

How Compute Nordic compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Finland, Compute Nordic ranks #6 of 24 tracked operators by capacity, with 5.7% of the country’s tracked MW.
  • Finland has 48 tracked data centers from 24 operators: 230 MW operational and 2,661 MW under construction or planned.
  • Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).
  • Our Deal Tracker lists 1 deal(s) naming Compute Nordic, the latest on 1 September 2026.

Data center operators in Finland

Tracked facilities4824 operators
Operational capacity230 MW2,661 MW in the pipeline
Compute Nordic rank by capacity#6of 24 operators · 5.7%
Industrial power price58.4 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
atNorth441.6 MW590 MW
DayOne1—560 MW
Nebius275 MW310 MW
FCDC Corp1—250 MW
AmpTank1—200 MW
Verne270 MW70 MW
Pure DC1—110 MW
HyperCo3—100 MW

All data centers in Finland Power and policy in Finland

Deals naming Compute Nordic

  • Cerebras Systems → 165MW AI data centre in Mikkeli (phased 50MW, 80MW, 165MW) Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Compute Nordic operate?

DC Market Insights tracks 1 Compute Nordic data center(s) in 1 country as of November 2026: 0 operational, 1 under construction and 0 planned.

Which other companies operate data centers in Finland?

Besides Compute Nordic, the largest operators we track in Finland by capacity are atNorth, DayOne, Nebius, FCDC Corp and AmpTank. The Finland page lists all 24 operators.

What rules apply to data centers in Finland?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst