Proprietary data

DC Terranova Data Centers

Data centers operated by DC Terranova that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 November 2026, DC Market Insights tracks 1 data center operated by DC Terranova in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
92.7 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Data Center Alto Jahuel · DC Terranova · Buin (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

DC Terranova data centers: key facts

  • The largest project in the pipeline is Data Center Alto Jahuel by DC Terranova (92.7 MW, planned).

DC Terranova development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 92.7 MW planned in total.

ProjectLocationStatusTypeCapacity
Data Center Alto JahuelDC Terranova Buin, Chile Planned Other 92.7 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Data Center Alto JahuelOther
History
  1. Planned
  2. Planned
Buin, Chile Planned 92.7 MW total — Operator / official

Market position

How DC Terranova compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Chile, DC Terranova ranks #5 of 19 tracked operators by capacity, with 8.1% of the country’s tracked MW.
  • Chile has 50 tracked data centers from 19 operators: 115 MW operational and 1,029 MW under construction or planned.
  • Buin also hosts 1 other tracked data center(s), run by Grenergy.

Data center operators in Chile

Tracked facilities5019 operators
Operational capacity115 MW1,029 MW in the pipeline
DC Terranova rank by capacity#5of 19 operators · 8.1%
Renewable share of generation66%2025
OperatorFacilitiesOperational MWPipeline MW
Grenergy3—400 MW
Ascenty542 MW225 MW
Scala Data Centers65 MW103 MW
TECfusions1—100 MW
ODATA340.6 MW48 MW
EdgeConneX421 MW40 MW
Cirion Technologies24 MW20 MW
Nabiax12 MW—

All data centers in Chile Power and policy in Chile

Other data centers in Buin

  • Alto Jahuel Campus Sur · Grenergy · Planned

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does DC Terranova operate?

DC Market Insights tracks 1 DC Terranova data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Chile?

Besides DC Terranova, the largest operators we track in Chile by capacity are Grenergy, Ascenty, Scala Data Centers, TECfusions and ODATA. The Chile page lists all 19 operators.

What rules apply to data centers in Chile?

Our Power & Policy Tracker lists 7 government actions on data centers and power in Chile, including 0 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Buin?

Other tracked data centers in Buin include Alto Jahuel Campus Sur (Grenergy).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst