Ascenty Data Centers
Data centers operated by Ascenty that we have verified: location, status and capacity, each checked against its source.
In short
As of 18 October 2026, DC Market Insights tracks 41 data centers operated by Ascenty in 4 countries, of which 27 are operational. Stated operational capacity is 382 MW, with a further 401 MW under construction and 60 MW planned. The pipeline is 1.2 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 38 of 41 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Ascenty data centers: key facts
About Ascenty
Ascenty, founded in 2010, builds and operates carrier-neutral data centers and its own fiber network in Latin America. Its website (October 2026) counts 40 units in operation and/or under construction in Brazil, Chile, Mexico and Colombia, linked by a 4,000 km fiber network; in June 2026 it said 27 were operating and 13 in development. It is owned by Digital Realty and Brookfield Infrastructure. In May 2026 it announced US$1.2 billion of new investment backed by 150 MW of fully pre-leased AI capacity.
- Headquarters
- Vinhedo, Brazil
- Founded
- 2010
- Ownership
- JV of Digital Realty and Brookfield Infrastructure
- Parent company
- Ascenty Holding Brasil S.A.
- Tracked footprint
- 41 facilities in 4 countries
- Website
- ascenty.com
Data center business
- Ascenty says it is the largest data center infrastructure company in Latin America, with 40 units in operation and/or under construction in Brazil, Chile, Mexico and Colombia, interconnected by its own 100% fiber-optic network of 4,000 km.
- Its shareholders are Brookfield Infrastructure Partners, a Canadian asset manager, and Digital Realty; through Digital Realty's ServiceFabric, customers can reach more than 500 data centers worldwide.
- Brazil is the core market: São Paulo city has eight sites (São Paulo 1 to 8, from 4 MW to 22 MW of total power each), and the São Paulo interior has 19 sites in Vinhedo, Sumaré, Hortolândia, Jundiaí, Campinas and Paulínia; it also runs Rio de Janeiro and Fortaleza sites.
- Hortolândia is listed as six data centers with 83 MW of total power, including Hortolândia 5 and 6 at 30 MW each.
- In Chile, Ascenty runs Santiago 1 (10 MW), Santiago 2 (16 MW) and Santiago 3 (16 MW), and is building Santiago 4 and 5 with 75 MW of total power each.
- In Colombia, the Bogotá campus is listed with two carrier-neutral data centers, Bogotá 1 (10 MW) and Bogotá 2 (10 MW), 20 MW and 18,500 sqm in total.
- In 2025 Ascenty kept 100% renewable electricity supply, reported zero water usage effectiveness (WUE) thanks to closed-loop cooling, and neutralized Scope 2 emissions with I-RECs (ESG Report 2025).
- The company reported 30% growth in enterprise revenue and a 26% rise in capacity sold (MW) in 2025, and approved US$1 billion of 2026 investment in Brazil, Mexico and Chile.
Recent updates
- 22 June 2026: the ESG Report 2025 confirmed 100% renewable electricity, the DCD Awards 2025 Environmental Impact Award and the GHG Protocol Gold Seal.
- 8 June 2026: Vertical Data and Ascenty signed a resale and referral agreement to deploy AI infrastructure in Brazil, Chile, Mexico and Colombia; Ascenty then counted 40 data centers, 27 operating and 13 in development.
- 28 May 2026: Ascenty announced US$1.2 billion of new investment after signing AI contracts with global technology companies; four new data centers, fully pre-leased, total 150 MW. The plan covers Vinhedo 2 growing from 50 MW to 80 MW, a new 90 MW Vinhedo 3 for AI, Vinhedo 4 and 5 in development, and Sumaré 3 with 90 MW initial capacity (works began March 2026, delivery planned Q3 2027).
- 8 May 2026: SPO05 started operating in Greater São Paulo (R$300 million investment) and SPO06 is under construction for May 2027 (about R$600 million); together they add 26 MW to a 60 MW campus.
- 20/2/2026: Ascenty announced a new environment for advanced AI testing at its Vinhedo data center.
- 13 February 2026: enterprise revenue grew 30% in 2025 and capacity sold rose 26%; Ascenty approved US$1 billion of investment for 2026 and said 13 more projects are in development.
- 16 January 2026: Casa dos Ventos and Ascenty announced a deal worth more than half a billion dollars for 110 average MW of renewable power, with Ascenty taking equity in two Casa dos Ventos projects (over 1.5 GW installed, operation expected 2027).
- 10 September 2025: Ascenty opened its third Chilean data center (SCL03, 16 MW, Quilicura; R$615.6 million), taking Chile to 42 MW, and started SCL04 and SCL05 (150 MW combined, R$5.52 billion).
Partnerships
- 21/8/2025: Ascenty launched the first Oracle Solution Center satellite site in Latin America.
Company details checked against company and official sources, 12 Nov 2026.
- Capacity under construction or planned (461 MW) is 1.2 times the operational base of 382 MW.
- Its largest operational site is Vinhedo 2 in Vinhedo, Brazil at 34 MW.
- The largest project in the pipeline is Santiago 4 by Ascenty (150 MW, under construction).
- Brazil accounts for 56% of tracked capacity (31 facilities).
- By type, the tracker lists 36 colocation and 5 hyperscale facilities.
- 38 of 41 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned Facilities with a stated year and capacity only.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Ascenty development pipeline
Under construction and planned facilities with a stated capacity, largest first. 401 MW under construction and 60 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Santiago 4Ascenty | Quilicura, Chile | Under construction | Hyperscale | 150 MW |
| Vinhedo 3Ascenty | Vinhedo, Brazil | Under construction | Hyperscale | 90 MW |
| Santiago 5Ascenty | Santiago, Chile | Under construction | Colocation | 75 MW |
| Hortolândia 6Ascenty | Hortolândia, Brazil | Under construction | Colocation | 30 MW |
| São Paulo 7Ascenty | Osasco, Brazil | Planned | Colocation | 22 MW |
| Sumaré 4Ascenty | Sumaré, Brazil | Under construction | Colocation | 19 MW |
| Sumaré 5Ascenty | Sumaré, Brazil | Under construction | Colocation | 19 MW |
| São Paulo 6Ascenty | Osasco, Brazil | Under construction | Colocation | 18 MW |
| São Paulo 8Ascenty | Osasco, Brazil | Planned | Colocation | 18 MW |
| Bogotá 1Ascenty | Bogotá, Colombia | Planned | Colocation | 10 MW |
| Bogotá 2Ascenty | Bogotá, Colombia | Planned | Colocation | 10 MW |
Facilities
41 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Santiago 4Hyperscale
History
|
Quilicura, Chile | Under construction | 150 MW total | — | Operator / official |
| Vinhedo 3Hyperscale | Vinhedo, Brazil | Under construction | 90 MW total | — | Operator / official |
| Santiago 5Colocation | Santiago, Chile | Under construction | 75 MW total | — | Operator / official |
| Vinhedo 2Colocation | Vinhedo, Brazil | Operational | 34 MW total | — | Operator / official |
| Querétaro 2 (QRO2)Colocation | Querétaro, Mexico | Operational | 31 MW total | — | Operator / official |
Hortolândia 5Colocation
History
|
Hortolândia, Brazil | Operational | 30 MW total | — | Operator / official |
Hortolândia 6Colocation
History
|
Hortolândia, Brazil | Under construction | 30 MW total | — | Operator / official |
| Vinhedo 1Colocation | Vinhedo, Brazil | Operational | 27 MW total | — | Operator / official |
| Querétaro 1 (QRO1)Colocation | Colón, Mexico | Operational | 25 MW total | — | Operator / official |
| Querétaro 3 (QRO3)Colocation | Querétaro, Mexico | Operational | 25 MW total | — | Operator / official |
São Paulo 7Colocation
History
|
Osasco, Brazil | Planned | 22 MW total | — | Operator / official |
| Sumaré 2Colocation | Sumaré, Brazil | Operational | 20 MW total | — | Operator / official |
| Sumaré 4Colocation | Sumaré, Brazil | Under construction | 19 MW total | — | Operator / official |
| Sumaré 5Colocation | Sumaré, Brazil | Under construction | 19 MW total | — | Operator / official |
| São Paulo 6Colocation | Osasco, Brazil | Under construction | 18 MW total | — | Operator / official |
São Paulo 8Colocation
History
|
Osasco, Brazil | Planned | 18 MW total | — | Operator / official |
Santiago 2Colocation
History
|
Quilicura, Chile | Operational | 16 MW total | 2022 | Operator / official |
| Santiago 3Colocation | Quilicura, Chile | Operational | 16 MW total | 2025 | Operator / official |
| Jundiaí 1Colocation | Jundiaí, Brazil | Operational | 15 MW total | — | Operator / official |
São Paulo 2Colocation
1 deal
|
Osasco, Brazil | Operational | 14 MW total | — | Operator / official |
| Sumaré 1Colocation | Sumaré, Brazil | Operational | 14 MW total | — | Operator / official |
| Jundiaí 2Colocation | Jundiaí, Brazil | Operational | 13 MW total | — | Operator / official |
| Paulínia 1Colocation | Paulínia, Brazil | Operational | 13 MW total | — | Operator / official |
| Bogotá 1Colocation | Bogotá, Colombia | Planned | 10 MW total | — | Operator / official |
| Bogotá 2Colocation | Bogotá, Colombia | Planned | 10 MW total | — | Operator / official |
| Fortaleza 1Colocation | Maracanaú, Brazil | Operational | 10 MW total | — | Operator / official |
| Hortolândia 1Colocation | Hortolândia, Brazil | Operational | 10 MW total | — | Operator / official |
| Rio de Janeiro 1Colocation | Rio de Janeiro, Brazil | Operational | 10 MW total | — | Operator / official |
| Santiago 1Colocation | Quilicura, Chile | Operational | 10 MW total | — | Operator / official |
São Paulo 4Colocation
History
|
Osasco, Brazil | Operational | 9 MW total | 2023 | Operator / official |
São Paulo 5Colocation
History
|
Osasco, Brazil | Operational | 8 MW total | 2026 | Operator / official |
| Hortolândia 2Colocation | Hortolândia, Brazil | Operational | 7 MW total | — | Operator / official |
| Campinas 1Colocation | Campinas, Brazil | Operational | 6 MW total | 2012 | Operator / official |
| São Paulo 1Colocation | Osasco, Brazil | Operational | 6 MW total | — | Operator / official |
| São Paulo 3Colocation | Osasco, Brazil | Operational | 4 MW total | — | Operator / official |
| Hortolândia 3Colocation | Hortolândia, Brazil | Operational | 3 MW total | — | Operator / official |
| Hortolândia 4Colocation | Hortolândia, Brazil | Operational | 3 MW total | — | Operator / official |
| Rio de Janeiro 2Colocation | Rio de Janeiro, Brazil | Operational | 3 MW total | — | Operator / official |
Sumaré 3Hyperscale
History
|
Sumaré, Brazil | Under construction | — | — | Operator / official |
| Vinhedo 4Hyperscale | Vinhedo, Brazil | Planned | — | — | Operator / official |
| Vinhedo 5Hyperscale | Vinhedo, Brazil | Planned | — | — | Operator / official |
Market position
How Ascenty compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Brazil, Ascenty ranks #2 of 56 tracked operators by capacity, with 15% of the country’s tracked MW.
- Brazil has 164 tracked data centers from 56 operators: 493 MW operational and 2,645 MW under construction or planned.
- In Chile, Ascenty ranks #2 of 19 tracked operators by capacity, with 23% of the country’s tracked MW.
- In Mexico, Ascenty ranks #4 of 10 tracked operators by capacity, with 5.5% of the country’s tracked MW.
- Osasco also hosts 1 other tracked data center(s), run by ODATA.
Data center operators in Brazil
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Elea Data Centers | 12 | — | 1,508 MW |
| CloudHQ | 2 | — | 324 MW |
| Scala Data Centers | 25 | 113 MW | 181 MW |
| V.tal | 6 | 20 MW | 200 MW |
| Omnia | 1 | — | 200 MW |
| ODATA | 5 | 72 MW | — |
| Cirion Technologies | 4 | 27 MW | — |
| HostDime | 2 | 1.5 MW | 15 MW |
All data centers in Brazil Power and policy in Brazil
Data center operators in Chile
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Grenergy | 3 | — | 400 MW |
| Scala Data Centers | 6 | 5 MW | 103 MW |
| TECfusions | 1 | — | 100 MW |
| DC Terranova | 1 | — | 92.7 MW |
| ODATA | 3 | 40.6 MW | 48 MW |
| EdgeConneX | 4 | 21 MW | 40 MW |
| Cirion Technologies | 2 | 4 MW | 20 MW |
| Nabiax | 1 | 2 MW | — |
All data centers in Chile Power and policy in Chile
Data center operators in Mexico
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| CloudHQ | 1 | — | 900 MW |
| ODATA | 4 | 74 MW | 300 MW |
| KIO Networks | 14 | 19 MW | 104 MW |
| Scala Data Centers | 6 | 5.1 MW | 2 MW |
| Equinix | 4 | — | — |
| Oracle | 2 | — | — |
| Amazon Web Services | 1 | — | — |
| Microsoft | 1 | — | — |
All data centers in Mexico Power and policy in Mexico
Other data centers in Osasco
- SP04 · ODATA · Operational · 48 MW
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Ascenty operate?
DC Market Insights tracks 41 Ascenty data center(s) in 4 countries as of October 2026: 27 operational, 8 under construction and 6 planned.
Where is Ascenty headquartered?
Ascenty is headquartered in Vinhedo, Brazil. Ownership: JV of Digital Realty and Brookfield Infrastructure.
Which other companies operate data centers in Brazil?
Besides Ascenty, the largest operators we track in Brazil by capacity are Elea Data Centers, CloudHQ, Scala Data Centers, V.tal and Omnia. The Brazil page lists all 56 operators.
What rules apply to data centers in Brazil?
Our Power & Policy Tracker lists 12 government actions on data centers and power in Brazil, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Osasco?
Other tracked data centers in Osasco include SP04 (ODATA).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.