Grenergy Data Centers

Data centers operated by Grenergy that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 October 2026, DC Market Insights tracks 3 data centers operated by Grenergy in 1 country, of which 0 are operational.

3Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
400 MWPlanned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 3 facilities have a stated capacity; the others are counted as sites only.

Polpaico Campus Norte · Grenergy · Tiltil (approximate location)Alto Jahuel Campus Sur · Grenergy · Buin (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Grenergy data centers: key facts

  • The largest project in the pipeline is Atacama Data by Grenergy (400 MW, planned).
  • 1 of 3 facilities have a capacity stated by their source; the totals above count only those.

Grenergy development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 400 MW planned in total.

ProjectLocationStatusTypeCapacity
Atacama DataGrenergy Chile Planned Hyperscale 400 MW

Facilities

3 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Atacama DataHyperscale
History
  1. Planned
  2. Announced
Chile Planned 400 MW IT — Operator / official
Alto Jahuel Campus SurHyperscale
History
  1. Planned
  2. Announced
Buin, Chile Planned — — Operator / official
Polpaico Campus NorteHyperscale
History
  1. Announced
  2. Planned
Tiltil, Chile Planned — — Operator / official

Market position

How Grenergy compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Chile, Grenergy ranks #1 of 19 tracked operators by capacity, with 35% of the country’s tracked MW.
  • Chile has 50 tracked data centers from 19 operators: 115 MW operational and 1,029 MW under construction or planned.

Data center operators in Chile

Tracked facilities5019 operators
Operational capacity115 MW1,029 MW in the pipeline
Grenergy rank by capacity#1of 19 operators · 35%
Renewable share of generation66%2025
OperatorFacilitiesOperational MWPipeline MW
Ascenty542 MW225 MW
Scala Data Centers65 MW103 MW
TECfusions1—100 MW
DC Terranova1—92.7 MW
ODATA340.6 MW48 MW
EdgeConneX421 MW40 MW
Cirion Technologies24 MW20 MW
Nabiax12 MW—

All data centers in Chile Power and policy in Chile

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Grenergy operate?

DC Market Insights tracks 3 Grenergy data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 3 planned.

Which other companies operate data centers in Chile?

Besides Grenergy, the largest operators we track in Chile by capacity are Ascenty, Scala Data Centers, TECfusions, DC Terranova and ODATA. The Chile page lists all 19 operators.

What rules apply to data centers in Chile?

Our Power & Policy Tracker lists 7 government actions on data centers and power in Chile, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst