Proprietary data

Cirion Technologies Data Centers

Data centers operated by Cirion Technologies that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 November 2026, DC Market Insights tracks 12 data centers operated by Cirion Technologies in 7 countries, of which 10 are operational. Stated operational capacity is 70 MW, with a further 20 MW under construction and — planned. The pipeline is 0.3 times the capacity already operating.

12Facilities tracked
7Countries
70 MWOperational (10 sites)
20 MWUnder construction (1 site)
—Planned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 9 of 12 facilities have a stated capacity; the others are counted as sites only.

BOG2 · Cirion Technologies · Bogotá (approximate location)BUE1 · Cirion Technologies · Buenos Aires (approximate location)CAR1 · Cirion Technologies · Caracas (approximate location)LIM1 · Cirion Technologies · Santiago de Surco (approximate location)LIM2 · Cirion Technologies · Lurín (approximate location)QUI2 · Cirion Technologies · Quito (approximate location)SAN1 · Cirion Technologies · Huechuraba (approximate location)SAN2 · Cirion Technologies · Quilicura (approximate location)RIO1 · Cirion Technologies · Rio de Janeiro (approximate location)RIO2 · Cirion Technologies · Rio de Janeiro (approximate location)CUR1 · Cirion Technologies · Curitiba (approximate location)SAO1 · Cirion Technologies · Cotia (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Cirion Technologies data centers: key facts

About Cirion Technologies

Cirion Technologies describes itself as a digital infrastructure and technology provider offering fiber network, connectivity, colocation, cloud infrastructure, and communication and collaboration solutions in Latin America. It states it has 18 owned data centers and a network present in 20 countries, as stated on its website in October 2026.

Ownership
Acquired by Stonepeak from Lumen (2022)
Parent company
Stonepeak
Tracked footprint
12 facilities in 7 countries
Website
ciriontechnologies.com

Company details checked against company and official sources, 10 Oct 2026.

  • Capacity under construction or planned (20 MW) is 0.3 times the operational base of 70 MW.
  • Its largest operational site is SAO1 in Cotia, Brazil at 20 MW.
  • The largest project in the pipeline is SAN2 by Cirion Technologies (20 MW, under construction).
  • Brazil accounts for 30% of tracked capacity (4 facilities).
  • 9 of 12 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational70 MW
Under construction20 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Brazil27 MW
Chile24 MW
Peru24 MW

OperationalUnder construction or planned

Cirion Technologies development pipeline

Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
SAN2Cirion Technologies Quilicura, Chile Under construction Colocation 20 MW

Facilities

12 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
LIM2Colocation
History
  1. Under construction
  2. Operational
  3. Under construction
  4. Operational
Lurín, Peru Operational 20 MW total — Operator / official
SAN2Colocation
History
  1. Under construction
  2. Under construction
Quilicura, Chile Under construction 20 MW — Operator / official
SAO1Colocation Cotia, Brazil Operational 20 MW total — Operator / official
BOG2Colocation Bogotá, Colombia Operational 7 MW total — Operator / official
BUE1Colocation
History
  1. Operational
  2. Operational
Buenos Aires, Argentina Operational 7 MW — Operator / official
RIO1Colocation Rio de Janeiro, Brazil Operational 7 MW total — Operator / official
LIM1Colocation Santiago de Surco, Peru Operational 4 MW total — Operator / official
SAN1Colocation Huechuraba, Chile Operational 4 MW total — Operator / official
QUI2Colocation Quito, Ecuador Operational 1 MW total — Operator / official
CAR1Colocation Caracas, Venezuela Operational — — Operator / official
CUR1Colocation Curitiba, Brazil Operational — — Operator / official
RIO2Colocation
History
  1. Announced
  2. Planned
Rio de Janeiro, Brazil Planned — — Operator / official

Market position

How Cirion Technologies compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Brazil, Cirion Technologies ranks #8 of 56 tracked operators by capacity, with 0.9% of the country’s tracked MW.
  • Brazil has 164 tracked data centers from 56 operators: 493 MW operational and 2,645 MW under construction or planned.
  • In Peru, Cirion Technologies ranks #1 of 11 tracked operators by capacity, with 97% of the country’s tracked MW.
  • In Chile, Cirion Technologies ranks #8 of 19 tracked operators by capacity, with 2.1% of the country’s tracked MW.
  • Rio de Janeiro also hosts 10 other tracked data center(s), run by Elea Data Centers, Ascenty, Icatu Seguros and Dataprev.

Data center operators in Brazil

Tracked facilities16456 operators
Operational capacity493 MW2,645 MW in the pipeline
Cirion Technologies rank by capacity#8of 56 operators · 0.9%
Renewable share of generation86.8%2025
OperatorFacilitiesOperational MWPipeline MW
Elea Data Centers12—1,508 MW
Ascenty31259 MW216 MW
CloudHQ2—324 MW
Scala Data Centers25113 MW181 MW
V.tal620 MW200 MW
Omnia1—200 MW
ODATA572 MW—
HostDime21.5 MW15 MW

All data centers in Brazil Power and policy in Brazil

Data center operators in Peru

Tracked facilities2011 operators
Operational capacity24.7 MW— in the pipeline
Cirion Technologies rank by capacity#1of 11 operators · 97%
Renewable share of generation62.6%2025
OperatorFacilitiesOperational MWPipeline MW
Equinix10.7 MW—
ON Empresas4——
Gtd3——
Banco Central de Reserva del Perú2——
Banco de Crédito del Perú2——
Telefónica del Perú2——
Banco de la Nación1——
BBVA1——

All data centers in Peru Power and policy in Peru

Data center operators in Chile

Tracked facilities5019 operators
Operational capacity115 MW1,029 MW in the pipeline
Cirion Technologies rank by capacity#8of 19 operators · 2.1%
Renewable share of generation66%2025
OperatorFacilitiesOperational MWPipeline MW
Grenergy3—400 MW
Ascenty542 MW225 MW
Scala Data Centers65 MW103 MW
TECfusions1—100 MW
DC Terranova1—92.7 MW
ODATA340.6 MW48 MW
EdgeConneX421 MW40 MW
Nabiax12 MW—

All data centers in Chile Power and policy in Chile

Other data centers in Rio de Janeiro

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Cirion Technologies operate?

DC Market Insights tracks 12 Cirion Technologies data center(s) in 7 countries as of November 2026: 10 operational, 1 under construction and 1 planned.

Which other companies operate data centers in Brazil?

Besides Cirion Technologies, the largest operators we track in Brazil by capacity are Elea Data Centers, Ascenty, CloudHQ, Scala Data Centers and V.tal. The Brazil page lists all 56 operators.

What rules apply to data centers in Brazil?

Our Power & Policy Tracker lists 12 government actions on data centers and power in Brazil, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Rio de Janeiro?

Other tracked data centers in Rio de Janeiro include Rio AI City (Elea Data Centers), Rio de Janeiro 1 (Ascenty), Rio de Janeiro 2 (Ascenty) and Data Center Icatu RJ (Icatu Seguros).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst