In short

As of 25 November 2026, DC Market Insights tracks 10 data centers operated by DCI Indonesia in 1 country, of which 9 are operational. Stated operational capacity is 64 MW, with a further — under construction and 1,000 MW planned. The pipeline is 15.6 times the capacity already operating.

10Facilities tracked
1Countries
64 MWOperational (9 sites)
—Under construction (0 sites)
1,000 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 4 of 10 facilities have a stated capacity; the others are counted as sites only.

DCI H1 Campus JK1 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK2 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK3 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK5 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK6 · DCI Indonesia · Cibitung (approximate location)DCI H2 Campus 01 · DCI Indonesia · Karawang (approximate location)DCI H2 Campus 02 · DCI Indonesia · Karawang (approximate location)DCI E1 · DCI Indonesia · Jakarta (approximate location)DCI E2 Surabaya · DCI Indonesia · Surabaya (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

DCI Indonesia data centers: key facts

  • Capacity under construction or planned (1,000 MW) is 15.6 times the operational base of 64 MW.
  • Its largest operational site is DCI H1 Campus JK6 in Cibitung, Indonesia at 36 MW.
  • The largest project in the pipeline is DCI H5 Data Center Park (1,000 MW, planned).
  • By type, the tracker lists 9 colocation and 1 hyperscale facilities.
  • 4 of 10 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational64 MW
Planned1,000 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
19'23'2436'259'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Facilities by type
Colocation9
Hyperscale1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

DCI Indonesia development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 1,000 MW planned in total.

ProjectLocationStatusTypeCapacity
DCI H5 Data Center ParkDCI Indonesia Bintan, Indonesia Planned Hyperscale 1,000 MW

Facilities

10 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DCI H5 Data Center ParkHyperscale Bintan, Indonesia Planned 1,000 MW IT — Operator / official
DCI H1 Campus JK6Colocation
History
  1. Operational
  2. Operational
Cibitung, Indonesia Operational 36 MW 2025 Operator / official
DCI E1Colocation
History
  1. Operational
  2. Operational
  3. Operational
Jakarta, Indonesia Operational 19 MW IT 2023 Operator / official
DCI E2 SurabayaColocation
History
  1. Operational
  2. Operational
Surabaya, Indonesia Operational 9 MW IT 2026 Operator / official
DCI H1 Campus JK1Colocation Cibitung, Indonesia Operational — — Operator / official
DCI H1 Campus JK2Colocation Cibitung, Indonesia Operational — — Operator / official
DCI H1 Campus JK3Colocation Cibitung, Indonesia Operational — — Operator / official
DCI H1 Campus JK5Colocation
History
  1. Operational
  2. Operational
Cibitung, Indonesia Operational — — Operator / official
DCI H2 Campus 01Colocation Karawang, Indonesia Operational — — Operator / official
DCI H2 Campus 02Colocation Karawang, Indonesia Operational — — Operator / official

Market position

How DCI Indonesia compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Indonesia, DCI Indonesia ranks #1 of 33 tracked operators by capacity, with 33% of the country’s tracked MW.
  • Indonesia has 76 tracked data centers from 33 operators: 311 MW operational and 2,962 MW under construction or planned.
  • Industrial electricity in Indonesia costs 62.9 USD/MWh (2024, latest official figure).

Data center operators in Indonesia

Tracked facilities7633 operators
Operational capacity311 MW2,962 MW in the pipeline
DCI Indonesia rank by capacity#1of 33 operators · 33%
Industrial power price62.9 USD/MWh2024
OperatorFacilitiesOperational MWPipeline MW
Digital Edge329 MW500 MW
BDx537.4 MW410 MW
Princeton Digital Group726 MW360 MW
ST Telemedia Global Data Centres942 MW332 MW
DayOne2—360 MW
NTT DATA366.4 MW—
NeutraDC444 MW—
EdgeConneX12 MW—

All data centers in Indonesia Power and policy in Indonesia

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does DCI Indonesia operate?

DC Market Insights tracks 10 DCI Indonesia data center(s) in 1 country as of November 2026: 9 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Indonesia?

Besides DCI Indonesia, the largest operators we track in Indonesia by capacity are Digital Edge, BDx, Princeton Digital Group, ST Telemedia Global Data Centres and DayOne. The Indonesia page lists all 33 operators.

What rules apply to data centers in Indonesia?

Our Power & Policy Tracker lists 8 government actions on data centers and power in Indonesia, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst