As of 29 October 2026, DC Market Insights tracks 22 data centers operated by Digital Edge in 8 countries, of which 15 are operational. Stated operational capacity is 132 MW, with a further 660 MW under construction and 60 MW planned. The pipeline is 5.5 times the capacity already operating.

22Facilities tracked
8Countries
132 MWOperational (15 sites)
660 MWUnder construction (5 sites)
60 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 16 of 22 facilities have a stated capacity; the others are counted as sites only.

BOM1 · Digital Edge · Navi Mumbai (approximate location)BOM2 · Digital Edge · Navi Mumbai (approximate location)BOM3 · Digital Edge · Navi Mumbai (approximate location)Digital Edge Johor (Bandar Cemerlang site) · Digital Edge · Kota Tinggi (approximate location)CGK Campus · Digital Edge · Bekasi (approximate location)SEL3 · Digital Edge · Incheon (approximate location)SEL5 (Ansan) · Digital Edge · Ansan (approximate location)TYO2 · Digital Edge · Chuo-ku (approximate location)TYO4, 5, 6 (Yokohama campus) · Digital Edge · Yokohama (approximate location)OSA1 · Digital Edge · Osaka (approximate location)OSA2 · Digital Edge · Osaka (approximate location)EDGE2 · Digital Edge · Jakarta (approximate location)BKK1 (BKK Campus) · Digital Edge · Chonburi (approximate location)TYO1 · Digital Edge · Bunkyo-ku (exact location)TYO3 · Digital Edge · Shinjuku-ku (exact location)TYO7 · Digital Edge · Chuo-ku (exact location)SEL1 · Digital Edge · Seoul (exact location)SEL2 · Digital Edge · Incheon (exact location)PUS1 · Digital Edge · Busan (exact location)PEK1 · Digital Edge · Beijing (exact location)NARRA1 · Digital Edge · Biñan (exact location)EDGE1 · Digital Edge · Jakarta (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Digital Edge data centers: key facts

About Digital Edge

Digital Edge is a Singapore-headquartered data center platform backed by Stonepeak, founded in 2020. Its website (October 2026) states 31 data centers in nine countries and more than 1.8 GW of total power secured, while its newsroom boilerplate (31 August 2026) cites 2 GW of secured IT power. It runs colocation and hyperscale sites in Japan, South Korea, Indonesia, the Philippines, India, China and Thailand, with large campuses under way in Navi Mumbai, Greater Jakarta (CGK, 500 MW) and Chonburi (100 MW).

Headquarters
Singapore, Singapore
Founded
2020
Ownership
Private; portfolio company of Stonepeak
Parent company
Stonepeak
Tracked footprint
22 facilities in 8 countries
Website
digitaledgedc.com

Data center business

  • In India the Navi Mumbai campus is a joint venture with NIIF and AGP Sustainable Assets. BOM1 is operational, BOM2 has topped out and BOM3 is under construction; together they bring the campus close to 120 MW, within a planned 400 MW campus.
  • The 500 MW CGK Campus in the GIIC Industrial Estate, Bekasi, is a US$4.5 billion multi-phase investment, scalable to 1 GW. Phase one has three buildings, due for service in Q4 2026, Q1 2027 and Q2 2027.
  • In Indonesia, Digital Edge Indonesia (formerly EDGE DC, set up in 2018) runs EDGE1 (6 MW) and EDGE2 (23 MW) in downtown Jakarta, a combined 29 MW, through PT Ekagrata Data Gemilang and the controlled listed subsidiary PT Indointernet Tbk (Indonet).
  • In Thailand a joint venture with B.Grimm Power, under a US$1 billion investment plan, is building the 100 MW BKK Campus in Chonburi in the Eastern Economic Corridor, with Ready-for-Service targeted for Q4 2026.
  • The company's home page lists 9 countries, 31 data centers and 1.8+ GW of total power secured. Locations are China, India, Indonesia, Japan, the Philippines, South Korea and Thailand, with a Singapore headquarters and a Hong Kong corporate office.
  • Japan is its largest market by site count: TYO1 (Bunkyo-ku, 3.76 MW), TYO2 (Nihonbashi, 1 MW), TYO3 (Shinjuku, 3.9 MW), the three-building TYO4-6 campus in Yokohama (18.5 MW), TYO7 (Nihonbashi-Kobunacho, 4.8 MW), OSA1 (Osaka Business Park, 14.4 MW, its first self-built site) and OSA2 in the Kansai region.
  • In South Korea it runs SEL1 in Gangnam (2.4 MW), the Bupyeong campus in Incheon (SEL2 36 MW live, SEL3 60 MW due Q4 2027, 96 MW in total) and PUS1 in Busan, the only Korean data center integrated with a cable landing station. With the planned 60 MW SEL5 in Ansan the Korean footprint spans five data centers.
  • NARRA1 in Laguna Technopark, Biñan (10 MW, 2,200 cabinets) is described as the largest carrier-neutral facility in the Philippines. PEK1 in Beijing (7.8 MW) is operated by licensed partner Chuanjun Information Technology.

Recent updates

  • BOM2 topped out and construction started on BOM3 at the Navi Mumbai campus.
  • Appointed Paul Macpherson as Chief Data Center Operations Officer to expand its operations leadership team.
  • Acquired a fully powered land parcel in Ansan's Sihwa National Industrial Complex, with a 90 MVA power agreement, for SEL5, a 60 MW hyperscale AI-ready data center.
  • Closed its first US$575 million holding-company loan to fund campus growth in South Korea, Japan, India and South East Asia.
  • Digital Edge and B.Grimm Power signed a US$880 million green loan for the 100 MW BKK Campus, the largest financing for a data center project in Thailand.
  • Closed a US$665 million green loan for the first phase of the 500 MW CGK Campus in Bekasi.
  • Signed a solar PPA with Hexa Climate Solutions for up to 83 MW for the first phase of the BOM campus, delivered in phases from December 2026.
  • Launched TYO7 in central Tokyo with Hulic, its seventh data center in Tokyo and ninth in Japan.

Sustainability

  • Published its fifth voluntary annual ESG report, reporting 26% renewable electricity across its operations and green loans totaling nearly US$1.25 billion.

Company details checked against company and official sources, 12 Nov 2026.

  • Capacity under construction or planned (720 MW) is 5.5 times the operational base of 132 MW.
  • Its largest operational site is SEL2 in Incheon, South Korea at 36 MW.
  • The largest project in the pipeline is CGK Campus by Digital Edge (500 MW, under construction).
  • Indonesia accounts for 62% of tracked capacity (3 facilities).
  • By type, the tracker lists 11 colocation, 9 hyperscale and 2 enterprise facilities.
  • 16 of 22 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational132 MW
Under construction660 MW
Planned60 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Indonesia529 MW
Thailand100 MW
Japan46.4 MW
China7.8 MW

OperationalUnder construction or planned

Facilities by type
Colocation11
Hyperscale9
Enterprise2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Digital Edge development pipeline

Under construction and planned facilities with a stated capacity, largest first. 660 MW under construction and 60 MW planned in total.

ProjectLocationStatusTypeCapacity
CGK CampusDigital Edge Bekasi, Indonesia Under construction Hyperscale 500 MW
BKK1 (BKK Campus)Digital Edge Chonburi, Thailand Under construction Hyperscale 100 MW
SEL3Digital Edge Incheon, South Korea Under construction Hyperscale 60 MW
SEL5 (Ansan)Digital Edge Ansan, South Korea Planned Hyperscale 60 MW

Facilities

22 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CGK CampusHyperscale
History
  1. Announced
  2. Under construction
  3. Under construction
Bekasi, Indonesia Under construction 500 MW IT — Operator / official
BKK1 (BKK Campus)Hyperscale
History · 1 deal
  1. Announced
  2. Under construction
  • Bangkok Bank, Bank of Ayudhya, HSBC, KASIKORNBANK, Mizuho, Natixis CIB, Siam Commercial Bank, SMBC, Standard Chartered (MLAs) → Digital Edge / B.Grimm Power JV – BKK Campus, Chonburi (100 MW)
  • All deals in the Deal Tracker
Chonburi, Thailand Under construction 100 MW IT — Operator / official
SEL3Hyperscale
History
  1. Under construction
  2. Under construction
Incheon, South Korea Under construction 60 MW IT — Operator / official
SEL5 (Ansan)Hyperscale
History · 1 deal
  1. Announced
  2. Planned
Ansan, South Korea Planned 60 MW IT — Operator / official
SEL2Hyperscale
History
  1. Operational
  2. Operational
Incheon, South Korea Operational 36 MW IT 2024 Operator / official
EDGE2Colocation
History
  1. Operational
  2. Operational
Jakarta, Indonesia Operational 23 MW IT 2024 Operator / official
TYO4, 5, 6 (Yokohama campus)Enterprise Yokohama, Japan Operational 18.5 MW IT — Operator / official
OSA1Colocation Osaka, Japan Operational 14.4 MW IT — Operator / official
NARRA1Colocation Biñan, Philippines Operational 10 MW IT — Operator / official
PEK1Colocation Beijing, China Operational 7.8 MW IT — Operator / official
EDGE1Colocation Jakarta, Indonesia Operational 6 MW IT — Operator / official
TYO7Colocation
History
  1. Under construction
  2. Operational
Chuo-ku, Japan Operational 4.8 MW IT 2025 Operator / official
TYO3Colocation Shinjuku-ku, Japan Operational 3.9 MW IT — Operator / official
TYO1Colocation Bunkyo-ku, Japan Operational 3.8 MW IT — Operator / official
SEL1Colocation Seoul, South Korea Operational 2.4 MW IT — Operator / official
TYO2Colocation Chuo-ku, Japan Operational 1 MW IT — Operator / official
BOM1Hyperscale Navi Mumbai, India Operational — — Operator / official
BOM2Hyperscale Navi Mumbai, India Under construction — — Operator / official
BOM3Hyperscale Navi Mumbai, India Under construction — — Operator / official
Digital Edge Johor (Bandar Cemerlang site)Hyperscale
History
  1. Announced
  2. Planned
Kota Tinggi, Malaysia Planned — — Trade press
OSA2Enterprise Osaka, Japan Operational — — Operator / official
PUS1Colocation Busan, South Korea Operational — — Operator / official

Market position

How Digital Edge compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Japan, Digital Edge ranks #11 of 20 tracked operators by capacity, with 2.6% of the country’s tracked MW.
  • Japan has 74 tracked data centers from 20 operators: 697 MW operational and 1,059 MW under construction or planned.
  • In South Korea, Digital Edge ranks #1 of 4 tracked operators by capacity, with 53% of the country’s tracked MW.
  • In Indonesia, Digital Edge ranks #1 of 8 tracked operators by capacity, with 30% of the country’s tracked MW.

Data center operators in Japan

Tracked facilities7420 operators
Operational capacity697 MW1,059 MW in the pipeline
Digital Edge rank by capacity#11of 20 operators · 2.6%
Renewable share of generation23.1%2024
OperatorFacilitiesOperational MWPipeline MW
AirTrunk4410 MW120 MW
Colt DCS9101 MW262 MW
EdgeConneX1—200 MW
NTT DATA330 MW136 MW
CloudHQ1—96.4 MW
ST Telemedia Global Data Centres1—70.8 MW
Vantage Data Centers1—68 MW
Equinix1854 MW—

All data centers in Japan Power and policy in Japan

Data center operators in South Korea

Tracked facilities84 operators
Operational capacity68.4 MW228 MW in the pipeline
Digital Edge rank by capacity#1of 4 operators · 53%
Renewable share of generation9.8%2025
OperatorFacilitiesOperational MWPipeline MW
Keppel1—60 MW
Princeton Digital Group1—48 MW
ST Telemedia Global Data Centres130 MW—

All data centers in South Korea Power and policy in South Korea

Data center operators in Indonesia

Tracked facilities218 operators
Operational capacity99 MW1,672 MW in the pipeline
Digital Edge rank by capacity#1of 8 operators · 30%
Industrial power price62.9 USD/MWh2024
OperatorFacilitiesOperational MWPipeline MW
Princeton Digital Group326 MW360 MW
ST Telemedia Global Data Centres942 MW332 MW
DayOne2—360 MW
BDx1—120 MW
EdgeConneX12 MW—
Equinix1——
NeutraDC Nxera Batam1——

All data centers in Indonesia Power and policy in Indonesia

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Digital Edge operate?

DC Market Insights tracks 22 Digital Edge data center(s) in 8 countries as of October 2026: 15 operational, 5 under construction and 2 planned.

Where is Digital Edge headquartered?

Digital Edge is headquartered in Singapore, Singapore. Ownership: Private; portfolio company of Stonepeak.

Which other companies operate data centers in Japan?

Besides Digital Edge, the largest operators we track in Japan by capacity are AirTrunk, Colt DCS, EdgeConneX, NTT DATA and CloudHQ. The Japan page lists all 20 operators.

What rules apply to data centers in Japan?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Japan, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst