Proprietary data

NeutraDC Data Centers

Data centers operated by NeutraDC that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 4 data centers operated by NeutraDC in 1 country, of which 4 are operational. Stated operational capacity is 44 MW.

4Facilities tracked
1Countries
44 MWOperational (4 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 4 of 4 facilities have a stated capacity; the others are counted as sites only.

NeutraDC HDC Cikarang JKT-1 Building 1 · NeutraDC · Cikarang (approximate location)NeutraDC Serpong · NeutraDC · South Tangerang (approximate location)NeutraDC Sentul · NeutraDC · Bogor (approximate location)NeutraDC Surabaya · NeutraDC · Surabaya (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

NeutraDC data centers: key facts

  • Its largest operational site is NeutraDC HDC Cikarang JKT-1 Building 1 in Cikarang, Indonesia at 21.5 MW.
  • By type, the tracker lists 3 colocation and 1 hyperscale facilities.
Facilities by type
Colocation3
Hyperscale1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities

4 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
NeutraDC HDC Cikarang JKT-1 Building 1Hyperscale Cikarang, Indonesia Operational 21.5 MW IT — Operator / official
NeutraDC SerpongColocation South Tangerang, Indonesia Operational 14 MW IT — Operator / official
NeutraDC SentulColocation Bogor, Indonesia Operational 5.5 MW IT — Operator / official
NeutraDC SurabayaColocation Surabaya, Indonesia Operational 3 MW IT — Operator / official

Market position

How NeutraDC compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Indonesia, NeutraDC ranks #8 of 33 tracked operators by capacity, with 1.3% of the country’s tracked MW.
  • Indonesia has 76 tracked data centers from 33 operators: 311 MW operational and 2,962 MW under construction or planned.
  • Industrial electricity in Indonesia costs 62.9 USD/MWh (2024, latest official figure).
  • Cikarang also hosts 10 other tracked data center(s), run by ST Telemedia Global Data Centres and K2 Data Centres.

Data center operators in Indonesia

Tracked facilities7633 operators
Operational capacity311 MW2,962 MW in the pipeline
NeutraDC rank by capacity#8of 33 operators · 1.3%
Industrial power price62.9 USD/MWh2024
OperatorFacilitiesOperational MWPipeline MW
DCI Indonesia1064 MW1,000 MW
Digital Edge329 MW500 MW
BDx537.4 MW410 MW
Princeton Digital Group726 MW360 MW
ST Telemedia Global Data Centres942 MW332 MW
DayOne2—360 MW
NTT DATA366.4 MW—
EdgeConneX12 MW—

All data centers in Indonesia Power and policy in Indonesia

Other data centers in Cikarang

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does NeutraDC operate?

DC Market Insights tracks 4 NeutraDC data center(s) in 1 country as of November 2026: 4 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Indonesia?

Besides NeutraDC, the largest operators we track in Indonesia by capacity are DCI Indonesia, Digital Edge, BDx, Princeton Digital Group and ST Telemedia Global Data Centres. The Indonesia page lists all 33 operators.

What rules apply to data centers in Indonesia?

Our Power & Policy Tracker lists 8 government actions on data centers and power in Indonesia, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Cikarang?

Other tracked data centers in Cikarang include STTGDC JKT7 (ST Telemedia Global Data Centres), STTGDC JKT8 (ST Telemedia Global Data Centres), STTGDC JKT9 (ST Telemedia Global Data Centres) and STTGDC JKT4 (ST Telemedia Global Data Centres).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst