Proprietary data
Elea Data Centers Data Centers
Data centers operated by Elea Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 11 October 2026, DC Market Insights tracks 12 data centers operated by Elea Data Centers in 1 country, of which 9 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 2 of 12 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Elea Data Centers data centers: key facts
About Elea Data Centers
Elea Data Centers is a neutral (carrier-neutral colocation) data center platform founded in 2018 and headquartered in Rio de Janeiro. As of its 26 June 2026 release it operates nine interconnected data centers in five of Brazil's main metropolitan areas (São Paulo, Rio de Janeiro, Brasília, Curitiba and Porto Alegre). It is building BEL1, a 7.5 MW AI data center in Belém with operations expected in the second quarter of 2027 and potential to expand to up to 100 MW. Elea is developing the Rio AI City hub in Rio de Janeiro and is owned by I Squared Capital.
- Headquarters
- Rio de Janeiro, Brazil
- Founded
- 2018
- Ownership
- Private; acquired by I Squared Capital (announced 28 April 2026, completed by 3 June 2026), with Piemonte Holding investing alongside
- Parent company
- I Squared Capital
- Tracked footprint
- 12 facilities in 1 country
- Website
- eleadatacenters.com
Data center business
- Elea describes itself as operating nine data centers located in five of Brazil's main metropolitan areas. Its site lists São Paulo (SPO1), São Bernardo do Campo (SPO2), Tamboré/Barueri (SPO3), Rio de Janeiro (RJO1), Brasília (BSB1, BSB2), Porto Alegre (POA1, POA2) and Curitiba (CTA1), plus BEL1 in Belém under development and the Rio AI City campus.
- Alessandro Lombardi is Elea's founder and was appointed CEO for a seven-year term after the I Squared acquisition. Tim Formuziewich of I Squared Capital chairs the board, which also includes Andrew E. Crouch and Ibai Gil Calzón of I Squared, Andre Dorf, Tesh Durvasula and Julia Dias Leite.
- I Squared Capital's announcement states that Elea has over 300 MW of powered land and over 1 GW currently in development, and that delivering this pipeline will require more than US$10 billion of capital. Elea serves a diversified base of enterprise customers and hyperscalers.
- According to the company timeline, Elea was founded in 2018, opened its first Rio de Janeiro data center in 2019, entered São Paulo in 2020, Brasília in 2021 and Curitiba and Porto Alegre in 2022; in 2023 all its data centers moved to 100% renewable energy, and in 2024 it added two more São Paulo data centers.
- Rio AI City is Elea's AI data center hub in the Olympic Park area of Rio de Janeiro. Its first phase has an initial capacity of 1.5 GW of renewable, certified energy, scalable to 3.2 GW. RJO1 is in operation on the site and RJO2 is under construction, with initial delivery planned for 2026. Hyphen designed the architecture and masterplan.
- At the SPO2 campus in São Bernardo do Campo, about 30 km from SPO1 in the former ABC industrial region, Elea plans to expand capacity by up to 120 MW for enterprise customers and AI demand.
- BEL1 in Belém, Pará, will have an initial capacity of 7.5 MW with direct-expansion (DX) cooling and will be powered from AXIA's Miramar high-voltage substation, with renewable energy certified by I-RECs through PPAs.
Recent updates
- Elea and AXIA Energia announced the first AI data center in the Amazon region, BEL1 in Belém: 7.5 MW initial capacity backed by anchor customers, potential to expand to up to 100 MW in later phases, and operations expected to start in the second quarter of 2027, with 100% renewable power from AXIA under a PPA.
- Rio de Janeiro City Hall, through CCPar, signed a Memorandum of Understanding with Elea for an AI-focused data center complex in the Barra da Tijuca Olympic Park area. The city says Elea received US$550 million for investment in its platform, including Rio AI City, and plans an initial 1.5 GW of energy capacity, rising to up to 3 GW by 2032. Prefeitura do Rio de Janeiro (CCPar), 12 June 2026
- After completing its acquisition by I Squared Capital, Elea announced a new Board of Directors to accelerate the roll-out of large-scale, high-density, AI-ready digital infrastructure across Brazil.
- Elea named Thiago Pongelupe as Technical Sales Director to support the expansion of its AI infrastructure.
- I Squared Capital announced it had agreed to acquire Elea Data Centers to expand its data center franchise in Latin America, investing alongside Piemonte Holding, a long-term partner of the platform. Financial terms were not disclosed.
Company details checked against company and official sources, 21 Oct 2026.
- The largest project in the pipeline is Rio AI City by Elea Data Centers (1,500 MW, under construction).
- By type, the tracker lists 11 colocation and 1 hyperscale facilities.
- 2 of 12 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Elea Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 1,500 MW under construction and 7.5 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Rio AI CityElea Data Centers | Rio de Janeiro, Brazil | Under construction | Hyperscale | 1,500 MW |
| BEL1Elea Data Centers | Belém, Brazil | Planned | Colocation | 7.5 MW |
Facilities
12 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Rio AI CityHyperscale
History
|
Rio de Janeiro, Brazil | Under construction | 1,500 MW total | — | Operator / official |
BEL1Colocation
History
|
Belém, Brazil | Planned | 7.5 MW total | — | Operator / official |
| BSB1Colocation | Brasília, Brazil | Operational | — | — | Operator / official |
| BSB2Colocation | Brasília, Brazil | Operational | — | — | Operator / official |
| CTA1Colocation | Curitiba, Brazil | Operational | — | — | Operator / official |
| POA1Colocation | Porto Alegre, Brazil | Operational | — | — | Operator / official |
| POA2Colocation | Porto Alegre, Brazil | Operational | — | — | Operator / official |
| RJO1Colocation | Rio de Janeiro, Brazil | Operational | — | — | Operator / official |
| RJO2Colocation | Rio de Janeiro, Brazil | Under construction | — | — | Operator / official |
| SPO1Colocation | São Paulo, Brazil | Operational | — | — | Operator / official |
| SPO2Colocation | São Bernardo do Campo, Brazil | Operational | — | — | Operator / official |
| SPO3Colocation | Barueri, Brazil | Operational | — | — | Operator / official |
Market position
How Elea Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Brazil, Elea Data Centers ranks #1 of 56 tracked operators by capacity, with 48% of the country’s tracked MW.
- Brazil has 164 tracked data centers from 56 operators: 493 MW operational and 2,645 MW under construction or planned.
- Rio de Janeiro also hosts 10 other tracked data center(s), run by Ascenty, Cirion Technologies, Icatu Seguros and Dataprev.
Data center operators in Brazil
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Ascenty | 31 | 259 MW | 216 MW |
| CloudHQ | 2 | — | 324 MW |
| Scala Data Centers | 25 | 113 MW | 181 MW |
| V.tal | 6 | 20 MW | 200 MW |
| Omnia | 1 | — | 200 MW |
| ODATA | 5 | 72 MW | — |
| Cirion Technologies | 4 | 27 MW | — |
| HostDime | 2 | 1.5 MW | 15 MW |
All data centers in Brazil Power and policy in Brazil
Other data centers in Rio de Janeiro
- Rio de Janeiro 1 · Ascenty · Operational · 10 MW
- RIO1 · Cirion Technologies · Operational · 7 MW
- Rio de Janeiro 2 · Ascenty · Operational · 3 MW
- Data Center Icatu RJ · Icatu Seguros · Operational
- Data Center Rio de Janeiro (DCRJ) · Dataprev · Operational
- Data Center SEDAN RJ · Banco do Brasil · Operational
- RIO2 · Cirion Technologies · Planned
- RJ01 · Takoda · Operational
- RJ1 · Equinix · Operational
- RJ2 · Equinix · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Elea Data Centers operate?
DC Market Insights tracks 12 Elea Data Centers data center(s) in 1 country as of October 2026: 9 operational, 2 under construction and 1 planned.
Where is Elea Data Centers headquartered?
Elea Data Centers is headquartered in Rio de Janeiro, Brazil. Ownership: Private; acquired by I Squared Capital (announced 28 April 2026, completed by 3 June 2026), with Piemonte Holding investing alongside.
Which other companies operate data centers in Brazil?
Besides Elea Data Centers, the largest operators we track in Brazil by capacity are Ascenty, CloudHQ, Scala Data Centers, V.tal and Omnia. The Brazil page lists all 56 operators.
What rules apply to data centers in Brazil?
Our Power & Policy Tracker lists 12 government actions on data centers and power in Brazil, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Rio de Janeiro?
Other tracked data centers in Rio de Janeiro include Rio de Janeiro 1 (Ascenty), RIO1 (Cirion Technologies), Rio de Janeiro 2 (Ascenty) and Data Center Icatu RJ (Icatu Seguros).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
