Proprietary data

O'Leary Ventures Data Centers

Data centers operated by O'Leary Ventures that we have verified: location, status and capacity, each checked against its source.

In short

As of 17 November 2026, DC Market Insights tracks 1 data center operated by O'Leary Ventures in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
7,500 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Wonder Valley AI data centre industrial park · O'Leary Ventures · Municipal District of Greenview (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

O'Leary Ventures data centers: key facts

About O'Leary Ventures

O'Leary Ventures, the investment platform of Kevin O'Leary, is developing Wonder Valley Alberta, a planned off-grid AI data centre industrial park in the Greenview Industrial Gateway near Grande Prairie, Alberta, sized for 7.5 GW of power over 5-10 years. Since February 2026 the data centre platform is presented as O'Leary Digital, which pairs Wonder Valley Alberta with Wonder Valley Utah for a 15 GW initial power plan across about 26,000 acres.

Ownership
Private; chaired by Kevin O'Leary
Parent company
O'Leary Digital Limited (data centre platform)
Tracked footprint
1 facility in 1 country
Website
olearyventures.com

Data center business

  • Water for the Alberta site: a 10-year licence granted in April 2025 lets the Greenview Industrial Gateway draw six million cubic metres a year from the Smoky River, and Alberta Environment and Protected Areas also issued a preliminary certificate for up to 24 million cubic metres a year until 2034.
  • O'Leary Digital describes itself as developing a long-term powered compute and integrated energy infrastructure platform anchored by Wonder Valley Utah and Wonder Valley Alberta. Each campus is planned for 7.5 GW of power generation capacity with phased powered buildings and on-site energy and utility infrastructure; combined they form a 15 GW initial power plan on about 26,000 acres, for single-tenant or multi-tenant hyperscale and AI users.
  • Leadership named in February 2026: Kevin O'Leary (Chairman), Paul Palandjian (Chief Executive Officer), Carl Agren (Chief Operating Officer), Brian Inskeep (InPwr Inc., lead investor and board member) and Ashley Davis (partner and senior advisor). The execution team includes Gensler (architecture and master planning), KPMG, InPwr, CenCore Group, Kent Data Centers (formerly Sudlows), PCL Construction as construction manager in Alberta and Clayco in Utah.
  • The Municipal District of Greenview announced a partnership with O'Leary Ventures to build off-grid natural gas and geothermal power infrastructure for what it called the largest AI data centre industrial park in the world, Wonder Valley, in the Greenview Industrial Gateway (GIG) near Grande Prairie. The GIG signed a Letter of Intent with O'Leary Ventures for the purchase and development of thousands of acres of land within and south of the GIG. Municipal District of Greenview media release, 9 Dec 2024
  • Kevin O'Leary said the joint venture team, led by Paul Palandjian (CEO, O'Leary Ventures) and Carl Agren, aims to generate and offer 7.5 GW of low-cost power to hyperscalers over the next 5-10 years. The first phase of 1.4 GW was put at about US$2 billion, with later annual roll-out of redundant power in 1 GW increments and total lifetime investment of over US$70 billion including infrastructure, power, data centres and ancillary structures. Municipal District of Greenview media release, 9 Dec 2024

Recent updates

  • 4 May 2026: Box Elder County commissioners voted 3-0 to approve the interlocal agreement with Utah's Military Installation Development Authority for the Stratos project (Wonder Valley Utah) in Hansel Valley; on 4 Jun 2026 O'Leary presented a smaller plan of 20,000 acres with buildings on 10,000 acres, and on 10 Jun the county set a 180-day moratorium on new data centres on unincorporated land.
  • 17 Apr 2026: Alberta's Environmental Appeals Board dismissed Sturgeon Lake Cree Nation's appeal of the Smoky River water licence for the Greenview Industrial Gateway, finding the Nation had no standing.
  • Early April 2026: Alberta's environment ministry told O'Leary Ventures in a letter that Wonder Valley is not a mandatory activity under provincial rules, so no provincial environmental impact assessment report will be prepared; the project was advised to consult the Impact Assessment Agency of Canada.
  • 17 Feb 2026: O'Leary Digital formed a joint venture with West GenCo LLC to advance Wonder Valley Utah in the Golden Spike District of Box Elder County, Utah; West GenCo oversees permitting and state regulatory coordination. The company said permitting is underway for Wonder Valley Alberta and that it has capitalised both projects through permitting toward shovel-ready status.

Company details checked against company and official sources, 17 Nov 2026.

  • The largest project in the pipeline is Wonder Valley AI data centre industrial park by O'Leary Ventures (7,500 MW, planned).

O'Leary Ventures development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 7,500 MW planned in total.

ProjectLocationStatusTypeCapacity
Wonder Valley AI data centre industrial parkO'Leary Ventures Municipal District of Greenview, Canada Planned Hyperscale 7,500 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Wonder Valley AI data centre industrial parkHyperscale
History
  1. Announced
  2. Planned
  3. Planned
Municipal District of Greenview, Canada Planned 7,500 MW total — Operator / official

Market position

How O'Leary Ventures compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Canada, O'Leary Ventures ranks #1 of 18 tracked operators by capacity, with 72% of the country’s tracked MW.
  • Canada has 78 tracked data centers from 18 operators: 495 MW operational and 9,870 MW under construction or planned.

Data center operators in Canada

Tracked facilities7818 operators
Operational capacity495 MW9,870 MW in the pipeline
O'Leary Ventures rank by capacity#1of 18 operators · 72%
Renewable share of generation63.9%2024
OperatorFacilitiesOperational MWPipeline MW
Meta1—1,000 MW
Beacon AI Centers1—920 MW
Bell Canada2—300 MW
eStruxture16148 MW90 MW
Vantage Data Centers4127 MW—
Cologix2386.4 MW—
QScale2—60 MW
STACK Infrastructure156 MW—

All data centers in Canada Power and policy in Canada

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does O'Leary Ventures operate?

DC Market Insights tracks 1 O'Leary Ventures data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Canada?

Besides O'Leary Ventures, the largest operators we track in Canada by capacity are Meta, Beacon AI Centers, Bell Canada, eStruxture and Vantage Data Centers. The Canada page lists all 18 operators.

What rules apply to data centers in Canada?

Our Power & Policy Tracker lists 15 government actions on data centers and power in Canada, including 6 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst