Proprietary data

Beacon AI Centers Data Centers

Data centers operated by Beacon AI Centers that we have verified: location, status and capacity, each checked against its source.

In short

As of 17 November 2026, DC Market Insights tracks 2 data centers operated by Beacon AI Centers in 2 countries, of which 0 are operational.

2Facilities tracked
2Countries
—Operational (0 sites)
—Under construction (0 sites)
920 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 2 facilities have a stated capacity; the others are counted as sites only.

Beacon AI Centers Heartland data centre · Beacon AI Centers · Sturgeon County (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Beacon AI Centers data centers: key facts

  • The largest project in the pipeline is Beacon AI Centers Heartland data centre (920 MW, planned).
  • Canada accounts for 100% of tracked capacity (1 facilities).
  • 1 of 2 facilities have a capacity stated by their source; the totals above count only those.

Beacon AI Centers development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 920 MW planned in total.

ProjectLocationStatusTypeCapacity
Beacon AI Centers Heartland data centreBeacon AI Centers Sturgeon County, Canada Planned Hyperscale 920 MW

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Beacon AI Centers Heartland data centreHyperscale
History
  1. Planned
  2. Planned
Sturgeon County, Canada Planned 920 MW total — Operator / official
Calvert Infrastructure HubHyperscale Calvert, United States Planned — — Trade press

Market position

How Beacon AI Centers compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Canada, Beacon AI Centers ranks #3 of 18 tracked operators by capacity, with 8.9% of the country’s tracked MW.
  • Canada has 78 tracked data centers from 18 operators: 495 MW operational and 9,870 MW under construction or planned.
  • In United States, Beacon AI Centers is one of 171 operators we track.
  • Sturgeon County also hosts 1 other tracked data center(s), run by Meta.

Data center operators in Canada

Tracked facilities7818 operators
Operational capacity495 MW9,870 MW in the pipeline
Beacon AI Centers rank by capacity#3of 18 operators · 8.9%
Renewable share of generation63.9%2024
OperatorFacilitiesOperational MWPipeline MW
O'Leary Ventures1—7,500 MW
Meta1—1,000 MW
Bell Canada2—300 MW
eStruxture16148 MW90 MW
Vantage Data Centers4127 MW—
Cologix2386.4 MW—
QScale2—60 MW
STACK Infrastructure156 MW—

All data centers in Canada Power and policy in Canada

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Beacon AI Centers rank by capacity#137of 171 operators
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Other data centers in Sturgeon County

  • Meta Sturgeon County Data Center · Meta · Under construction · 1,000 MW

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Beacon AI Centers operate?

DC Market Insights tracks 2 Beacon AI Centers data center(s) in 2 countries as of November 2026: 0 operational, 0 under construction and 2 planned.

Which other companies operate data centers in Canada?

Besides Beacon AI Centers, the largest operators we track in Canada by capacity are O'Leary Ventures, Meta, Bell Canada, eStruxture and Vantage Data Centers. The Canada page lists all 18 operators.

What rules apply to data centers in Canada?

Our Power & Policy Tracker lists 15 government actions on data centers and power in Canada, including 6 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Sturgeon County?

Other tracked data centers in Sturgeon County include Meta Sturgeon County Data Center (Meta).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst