Data centers operated by Open Access Data Centres that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 13 data centers operated by Open Access Data Centres in 3 countries, of which 13 are operational. Stated operational capacity is 68 MW.

13Facilities tracked
3Countries
68 MWOperational (13 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 12 of 13 facilities have a stated capacity; the others are counted as sites only.

OADC Isando (JNB1) · Open Access Data Centres · Johannesburg (approximate location)OADC Bryanston (JNB2) · Open Access Data Centres · Johannesburg (approximate location)OADC Parklands (JNB3) · Open Access Data Centres · Johannesburg (approximate location)OADC Durban (DUR1) · Open Access Data Centres · Durban (approximate location)OADC Umhlanga (DUR2) · Open Access Data Centres · Durban (approximate location)OADC Rondebosch (CPT1) · Open Access Data Centres · Cape Town (approximate location)OADC Brackenfell (CPT2) · Open Access Data Centres · Cape Town (approximate location)OADC Bree Street (CPT3) · Open Access Data Centres · Cape Town (approximate location)OADC Bloemfontein (BFN1) · Open Access Data Centres · Bloemfontein (approximate location)OADC East London (ELS1) · Open Access Data Centres · East London (approximate location)OADC Gqeberha (PLZ1) · Open Access Data Centres · Gqeberha (approximate location)OADC Lagos (LOS1) · Open Access Data Centres · Lagos (approximate location)OADC Texaf Kinshasa (FIH1) · Open Access Data Centres · Kinshasa (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Open Access Data Centres data centers: key facts

  • Its largest operational site is OADC Lagos (LOS1) in Lagos, Nigeria at 24 MW.
  • South Africa accounts for 62% of tracked capacity (11 facilities).
  • 12 of 13 facilities have a capacity stated by their source; the totals above count only those.
Capacity by country, MW
Nigeria24 MW

OperationalUnder construction or planned

Facilities

13 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
OADC Lagos (LOS1)Colocation Lagos, Nigeria Operational 24 MW — Operator / official
OADC Isando (JNB1)Colocation Johannesburg, South Africa Operational 12 MW — Operator / official
OADC Durban (DUR1)Colocation Durban, South Africa Operational 8 MW — Operator / official
OADC Parklands (JNB3)Colocation Johannesburg, South Africa Operational 6 MW — Operator / official
OADC Brackenfell (CPT2)Colocation Cape Town, South Africa Operational 5 MW — Operator / official
OADC Bryanston (JNB2)Colocation Johannesburg, South Africa Operational 3 MW — Operator / official
OADC Rondebosch (CPT1)Colocation Cape Town, South Africa Operational 3 MW — Operator / official
OADC Bree Street (CPT3)Colocation Cape Town, South Africa Operational 2 MW — Operator / official
OADC Texaf Kinshasa (FIH1)Colocation Kinshasa, DR Congo Operational 2 MW — Operator / official
OADC Bloemfontein (BFN1)Colocation Bloemfontein, South Africa Operational 1 MW — Operator / official
OADC East London (ELS1)Colocation East London, South Africa Operational 1 MW — Operator / official
OADC Gqeberha (PLZ1)Colocation Gqeberha, South Africa Operational 1 MW — Operator / official
OADC Umhlanga (DUR2)Colocation Durban, South Africa Operational — — Operator / official

Market position

How Open Access Data Centres compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In South Africa, Open Access Data Centres ranks #3 of 7 tracked operators by capacity, with 11% of the country’s tracked MW.
  • South Africa has 28 tracked data centers from 7 operators: 202 MW operational and 180 MW under construction or planned.
  • In Nigeria, Open Access Data Centres ranks #1 of 6 tracked operators by capacity, with 64% of the country’s tracked MW.
  • Johannesburg also hosts 8 other tracked data center(s), run by Vantage Data Centers, Teraco and Equinix.

Data center operators in South Africa

Tracked facilities287 operators
Operational capacity202 MW180 MW in the pipeline
Open Access Data Centres rank by capacity#3of 7 operators · 11%
OperatorFacilitiesOperational MWPipeline MW
Teraco9119 MW40 MW
Vantage Data Centers2—140 MW
Africa Data Centres340.5 MW—
Vodacom1——
MTN1——
Equinix1——

All data centers in South Africa

Data center operators in Nigeria

Tracked facilities126 operators
Operational capacity37.5 MW— in the pipeline
Open Access Data Centres rank by capacity#1of 6 operators · 64%
OperatorFacilitiesOperational MWPipeline MW
Rack Centre213.5 MW—
Digital Realty4——
Galaxy Backbone2——
Equinix2——
MTN Nigeria1——

All data centers in Nigeria

Data center operators in DR Congo

Tracked facilities22 operators
Operational capacity2 MW— in the pipeline
Open Access Data Centres rank by capacity#1of 2 operators · 100%
OperatorFacilitiesOperational MWPipeline MW
Raxio1——

All data centers in DR Congo

Other data centers in Johannesburg

  • Vantage Johannesburg I (JNB1) campus · Vantage Data Centers · Planned · 120 MW
  • Teraco JB4 · Teraco · Operational · 50 MW
  • Teraco JB7 · Teraco · Under construction · 40 MW
  • Teraco JB2 · Teraco · Operational · 14 MW
  • Equinix JN1 · Equinix · Operational
  • Teraco JB1 (East and West) · Teraco · Operational
  • Teraco JB3 · Teraco · Operational
  • Teraco JB5 · Teraco · Operational

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Open Access Data Centres operate?

DC Market Insights tracks 13 Open Access Data Centres data center(s) in 3 countries as of November 2026: 13 operational, 0 under construction and 0 planned.

Which other companies operate data centers in South Africa?

Besides Open Access Data Centres, the largest operators we track in South Africa by capacity are Teraco, Vantage Data Centers, Africa Data Centres, Vodacom and MTN. The South Africa page lists all 7 operators.

Which other data centers are in Johannesburg?

Other tracked data centers in Johannesburg include Vantage Johannesburg I (JNB1) campus (Vantage Data Centers), Teraco JB4 (Teraco), Teraco JB7 (Teraco) and Teraco JB2 (Teraco).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst