Proprietary data
Teraco Data Centers
Data centers operated by Teraco that we have verified: location, status and capacity, each checked against its source.
In short
As of 25 November 2026, DC Market Insights tracks 9 data centers operated by Teraco in 1 country, of which 8 are operational. Stated operational capacity is 119 MW, with a further 40 MW under construction and — planned. The pipeline is 0.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 6 of 9 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Teraco data centers: key facts
- Capacity under construction or planned (40 MW) is 0.3 times the operational base of 119 MW.
- Its largest operational site is Teraco CT2 in Cape Town, South Africa at 50 MW.
- The largest project in the pipeline is Teraco JB7 (40 MW, under construction).
- By type, the tracker lists 6 colocation and 3 hyperscale facilities.
- 6 of 9 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Teraco development pipeline
Under construction and planned facilities with a stated capacity, largest first. 40 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Teraco JB7Teraco | Johannesburg, South Africa | Under construction | Hyperscale | 40 MW |
Facilities
9 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Teraco CT2Hyperscale | Cape Town, South Africa | Operational | 50 MW IT | — | Operator / official |
| Teraco JB4Hyperscale | Johannesburg, South Africa | Operational | 50 MW IT | — | Operator / official |
| Teraco JB7Hyperscale | Johannesburg, South Africa | Under construction | 40 MW IT | — | Operator / official |
| Teraco JB2Colocation | Johannesburg, South Africa | Operational | 14 MW IT | 2017 | Operator / official |
Teraco CT1Colocation
History
|
Cape Town, South Africa | Operational | 3 MW IT | — | Operator / official |
| Teraco DB1Colocation | Durban, South Africa | Operational | 2 MW IT | — | Operator / official |
| Teraco JB1 (East and West)Colocation | Johannesburg, South Africa | Operational | — | — | Operator / official |
| Teraco JB3Colocation | Johannesburg, South Africa | Operational | — | — | Operator / official |
| Teraco JB5Colocation | Johannesburg, South Africa | Operational | — | — | Operator / official |
Market position
How Teraco compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In South Africa, Teraco ranks #1 of 7 tracked operators by capacity, with 42% of the country’s tracked MW.
- South Africa has 28 tracked data centers from 7 operators: 202 MW operational and 180 MW under construction or planned.
- Johannesburg also hosts 5 other tracked data center(s), run by Vantage Data Centers, Open Access Data Centres and Equinix.
- Our Deal Tracker lists 1 deal(s) naming Teraco, the latest on 22 October 2026.
Data center operators in South Africa
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Vantage Data Centers | 2 | — | 140 MW |
| Open Access Data Centres | 11 | 42 MW | — |
| Africa Data Centres | 3 | 40.5 MW | — |
| Vodacom | 1 | — | — |
| MTN | 1 | — | — |
| Equinix | 1 | — | — |
All data centers in South Africa
Other data centers in Johannesburg
- Vantage Johannesburg I (JNB1) campus · Vantage Data Centers · Planned · 120 MW
- OADC Isando (JNB1) · Open Access Data Centres · Operational · 12 MW
- OADC Parklands (JNB3) · Open Access Data Centres · Operational · 6 MW
- OADC Bryanston (JNB2) · Open Access Data Centres · Operational · 3 MW
- Equinix JN1 · Equinix · Operational
Deals naming Teraco
- Teraco Properties (Pty) Ltd → Vacant industrial land at Erf 25704 Brackenfell, City of Cape Town Land / campus
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Teraco operate?
DC Market Insights tracks 9 Teraco data center(s) in 1 country as of November 2026: 8 operational, 1 under construction and 0 planned.
Which other companies operate data centers in South Africa?
Besides Teraco, the largest operators we track in South Africa by capacity are Vantage Data Centers, Open Access Data Centres, Africa Data Centres, Vodacom and MTN. The South Africa page lists all 7 operators.
Which other data centers are in Johannesburg?
Other tracked data centers in Johannesburg include Vantage Johannesburg I (JNB1) campus (Vantage Data Centers), OADC Isando (JNB1) (Open Access Data Centres), OADC Parklands (JNB3) (Open Access Data Centres) and OADC Bryanston (JNB2) (Open Access Data Centres).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.