Proprietary data

Red Admiral DC Data Centers

Data centers operated by Red Admiral DC that we have verified: location, status and capacity, each checked against its source.

In short

As of 15 October 2026, DC Market Insights tracks 1 data center operated by Red Admiral DC in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
250 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Red Admiral DC Westmeath (Collinstown) · Red Admiral DC · Collinstown (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Red Admiral DC data centers: key facts

  • The largest project in the pipeline is Red Admiral DC Westmeath (Collinstown) (250 MW, planned).

Red Admiral DC development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 250 MW planned in total.

ProjectLocationStatusTypeCapacity
Red Admiral DC Westmeath (Collinstown)Red Admiral DC Collinstown, Ireland Planned Hyperscale 250 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Red Admiral DC Westmeath (Collinstown)Hyperscale
History
  1. Planned
  2. Planned
Collinstown, Ireland Planned 250 MW total — Operator / official

Market position

How Red Admiral DC compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Ireland, Red Admiral DC ranks #1 of 15 tracked operators by capacity, with 19% of the country’s tracked MW.
  • Ireland has 39 tracked data centers from 15 operators: 53 MW operational and 1,278 MW under construction or planned.
  • Industrial electricity in Ireland costs 234 USD/MWh (2025, latest official figure).

Data center operators in Ireland

Tracked facilities3915 operators
Operational capacity53 MW1,278 MW in the pipeline
Red Admiral DC rank by capacity#1of 15 operators · 19%
Industrial power price234 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Echelon Data Centres2—200 MW
Art Data Centres1—200 MW
Herbata1—180 MW
Amazon Web Services6—169 MW
Huntstown Power Company1—150 MW
EdgeConneX425 MW37 MW
Pure DC314 MW40 MW
Vantage Data Centers1—52 MW

All data centers in Ireland Power and policy in Ireland

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Red Admiral DC operate?

DC Market Insights tracks 1 Red Admiral DC data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Ireland?

Besides Red Admiral DC, the largest operators we track in Ireland by capacity are Echelon Data Centres, Art Data Centres, Herbata, Amazon Web Services and Huntstown Power Company. The Ireland page lists all 15 operators.

What rules apply to data centers in Ireland?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Ireland, including 2 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst