Every data center in Ireland that we have verified: operator, location, status and capacity, each checked against its source.
By Amit JainReviewed by Deepti AgrawalUpdated 26 Nov 2026
In short
As of 26 November 2026, DC Market Insights tracks 46 data centers in Ireland run by 19 operators: 29 operational, 2 under construction and 15 planned. Stated operational capacity is 53 MW, with a further 248 MW under construction and 1,210 MW planned. EdgeConneX holds the largest share of tracked operational capacity (47%).
46Facilities tracked
19Operators
53 MWOperational (29 sites)
248 MWUnder construction (2 sites)
1,210 MWPlanned (15 sites)
MW = IT capacity where the source states it, otherwise total capacity. 18 of 46 facilities have a stated capacity; the others are counted as sites only.
OperationalUnder constructionPlannedPin = exact site location; dot = city (approximate)
Market snapshot
Ireland data center market: key facts
Capacity under construction or planned (1,458 MW) is 27.5 times the operational base of 53 MW.
The three largest operators by operational capacity, EdgeConneX, Pure DC and CyrusOne, hold 100% of tracked operational MW.
Red Admiral DC has the largest development pipeline in Ireland: 250 MW under construction or planned.
The largest operational facility we track is DUB01 (EdgeConneX, Dublin) at 18 MW.
The largest project in the pipeline is Red Admiral DC Westmeath (Collinstown) (250 MW, planned).
Dublin is the largest cluster: 42 of 46 facilities and 45% of tracked capacity.
By type, the tracker lists 24 colocation, 21 hyperscale and 1 other facilities.
18 of 46 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational53 MW
Under construction248 MW
Planned1,210 MW
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Largest operators in Ireland by tracked capacity, MW
Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
A second analyst re-opens each source before a facility is published.
Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers are there in Ireland?
DC Market Insights tracks 46 data centers in Ireland as of November 2026: 29 operational, 2 under construction and 15 planned, run by 19 operators. The count grows as we verify more sites.
What is the data center capacity of Ireland?
Tracked operational capacity in Ireland is 53 MW, with 248 MW under construction and 1,210 MW planned. These totals use the capacity each source states (IT load where given) and cover 18 of 46 tracked facilities.
Which companies operate the most data center capacity in Ireland?
By tracked operational capacity, the largest operators in Ireland are EdgeConneX (25 MW), Pure DC (14 MW) and CyrusOne (14 MW).
Where are the data centers in Ireland located?
The largest clusters by tracked capacity are Dublin (42 facilities), Westmeath (1 facilities) and Wicklow (1 facilities). The map above shows every site.
Which new data centers are being built in Ireland?
We track 248 MW under construction and 1,210 MW planned. The largest projects are Red Admiral DC Westmeath (Collinstown) (250 MW), Echelon DUB20 Arklow (200 MW) and Art Data Centres Ennis campus (200 MW).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity does Ireland have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.