Proprietary data

TELUS Data Centers

Data centers operated by TELUS that we have verified: location, status and capacity, each checked against its source.

In short

As of 11 November 2026, DC Market Insights tracks 2 data centers operated by TELUS in 1 country, of which 0 are operational.

2Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
—Planned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 2 facilities have a stated capacity; the others are counted as sites only.

Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

TELUS data centers: key facts

  • 0 of 2 facilities have a capacity stated by their source; the totals above count only those.

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
TELUS 150 West Georgia facilityOther Vancouver, Canada Planned — — Operator / official
TELUS M3 facilityOther Vancouver, Canada Planned — — Operator / official

Market position

How TELUS compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Canada, TELUS is one of 18 operators we track.
  • Canada has 78 tracked data centers from 18 operators: 495 MW operational and 9,870 MW under construction or planned.
  • Vancouver also hosts 7 other tracked data center(s), run by Cologix and eStruxture.

Data center operators in Canada

Tracked facilities7818 operators
Operational capacity495 MW9,870 MW in the pipeline
TELUS rank by capacity#16of 18 operators
Renewable share of generation63.9%2024
OperatorFacilitiesOperational MWPipeline MW
O'Leary Ventures1—7,500 MW
Meta1—1,000 MW
Beacon AI Centers1—920 MW
Bell Canada2—300 MW
eStruxture16148 MW90 MW
Vantage Data Centers4127 MW—
Cologix2386.4 MW—
QScale2—60 MW

All data centers in Canada Power and policy in Canada

Other data centers in Vancouver

  • Cologix VAN3 · Cologix · Operational · 5 MW
  • eStruxture VAN-1 · eStruxture · Operational · 2.4 MW
  • eStruxture VAN-2 · eStruxture · Operational · 2.1 MW
  • Cologix VAN1 · Cologix · Operational
  • Cologix VAN2 · Cologix · Operational
  • Cologix VAN4 · Cologix · Operational
  • Cologix VAN5 · Cologix · Operational

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does TELUS operate?

DC Market Insights tracks 2 TELUS data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 2 planned.

Which other companies operate data centers in Canada?

Besides TELUS, the largest operators we track in Canada by capacity are O'Leary Ventures, Meta, Beacon AI Centers, Bell Canada and eStruxture. The Canada page lists all 18 operators.

What rules apply to data centers in Canada?

Our Power & Policy Tracker lists 15 government actions on data centers and power in Canada, including 6 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Vancouver?

Other tracked data centers in Vancouver include Cologix VAN3 (Cologix), eStruxture VAN-1 (eStruxture), eStruxture VAN-2 (eStruxture) and Cologix VAN1 (Cologix).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst