Vena Nexus Data Centers
Data centers operated by Vena Nexus that we have verified: location, status and capacity, each checked against its source.
In short
As of 21 October 2026, DC Market Insights tracks 1 data center operated by Vena Nexus in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Vena Nexus data centers: key facts
- The largest project in the pipeline is Nexus Yang Green Data Centre Campus by Vena Nexus (350 MW, under construction).
Vena Nexus development pipeline
Under construction and planned facilities with a stated capacity, largest first. 350 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Nexus Yang Green Data Centre CampusVena Nexus | Seremban, Malaysia | Under construction | Hyperscale | 350 MW |
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Nexus Yang Green Data Centre CampusHyperscale | Seremban, Malaysia | Under construction | 350 MW IT | — | Trade press |
Market position
How Vena Nexus compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Malaysia, Vena Nexus ranks #5 of 31 tracked operators by capacity, with 7.4% of the country’s tracked MW.
- Malaysia has 79 tracked data centers from 31 operators: 1,219 MW operational and 3,511 MW under construction or planned.
- Industrial electricity in Malaysia costs 105 USD/MWh (2026, latest official figure).
Data center operators in Malaysia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Vantage Data Centers | 3 | 331 MW | 436 MW |
| AirTrunk | 4 | 150 MW | 550 MW |
| Bridge Data Centres | 5 | 146 MW | 500 MW |
| Princeton Digital Group | 2 | 200 MW | 300 MW |
| YTL Data Centers | 6 | 68 MW | 240 MW |
| MSFusion | 1 | — | 300 MW |
| EdgeConneX | 3 | — | 284 MW |
| STACK Infrastructure | 1 | — | 220 MW |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Vena Nexus operate?
DC Market Insights tracks 1 Vena Nexus data center(s) in 1 country as of October 2026: 0 operational, 1 under construction and 0 planned.
Which other companies operate data centers in Malaysia?
Besides Vena Nexus, the largest operators we track in Malaysia by capacity are Vantage Data Centers, AirTrunk, Bridge Data Centres, Princeton Digital Group and YTL Data Centers. The Malaysia page lists all 31 operators.
What rules apply to data centers in Malaysia?
Our Power & Policy Tracker lists 8 government actions on data centers and power in Malaysia, including 1 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.