Proprietary data
YTL Data Centers Data Centers
Data centers operated by YTL Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 20 November 2026, DC Market Insights tracks 9 data centers operated by YTL Data Centers in 2 countries, of which 4 are operational. Stated operational capacity is 110 MW, with a further 160 MW under construction and 80 MW planned. The pipeline is 2.2 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 8 of 9 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
YTL Data Centers data centers: key facts
About YTL Data Centers
YTL Data Centers (YTL Data Center Holdings Pte. Ltd.) is the digital infrastructure arm of YTL Power International Berhad. It runs the YTL Green Data Center Park in Kulai, Johor (JDC1 72 MW operational, JDC2 20 MW IT AI data center, JDC3 80 MW IT, JDC6 40 MW IT), the 5 MW Sentul Data Center 1 in Kuala Lumpur and the 12.5 MW Dodid data center in Singapore. YTL Power said in May 2026 that 298 MW of data center capacity was already contracted and that it plans to raise the Kulai park from 600 MW to 1,000 MW.
- Headquarters
- Singapore, Singapore
- Ownership
- Subsidiary of YTL Power International Berhad (listed on Bursa Malaysia), part of YTL Corporation
- Parent company
- YTL Power International Berhad
- Tracked footprint
- 9 facilities in 2 countries
- Website
- ytldatacenters.com
Data center business
- In Singapore, YTL Data Center Holdings completed the acquisition of Dodid Pte. Ltd. in December 2021, owner of a 12.5 MW Tier-3 data center built and commissioned in 2018. The four-storey Dodid building in the north of Singapore has over 42,000 sq ft of white space in 9 data hall suites and holds the BCA Green Mark Platinum award.
- YTL Data Centers describes itself as the digital infrastructure arm of YTL Power International Berhad, headquartered in Malaysia and listed on Bursa Malaysia. As part of YTL Corporation it draws on group businesses in power generation, real estate, construction and telecommunications, and has a goal to power its data centres in South East Asia with 100% clean and renewable energy.
- The YTL Green Data Center Park in Kulai, Johor, about 26 km from Singapore, has 275 acres earmarked for data centers and sits next to about 1,500 acres of land for solar farms. The company page gives development of up to 600 MW of data center capacity, with the first data center, Johor Data Center 1 (72 MW), already operational.
- Johor Data Center 1 is a 3-storey building of over 535,000 sq ft with 24 data hall suites and up to 72 MW capacity; certifications listed include TCDD, TCCF, ISO 9001, ISO 27001, ISO 50001 and PCI-DSS. It is described as the first data center in the region powered by solar energy.
- Johor Data Center 2 is the company's first AI data center: 20 MW IT load, design PUE below 1.4 and direct-to-chip liquid cooling ready. Johor Data Center 3 is a two-storey AI data center of 80 MW IT load with design PUE below 1.3 with DTC liquid cooling. Johor Data Center 6 is a 40 MW IT built-to-suit facility for a large multinational customer.
- Sentul Data Center 1 in central Kuala Lumpur is an edge data center with up to 500 racks and up to 5 MW over four data halls on a single storey, designed for 3 kW to 8 kW racks, with local peering and links to internet exchanges in the city.
Recent updates
- YTL said press reports linking its data centres to the transfer of Nvidia GPUs to Chinese customers are untrue. YTL Data Centers provides co-location services in Johor to multiple global customers, including U.S. hyperscalers, and said the new U.S. BIS remote-access rule does not affect its co-location services.
- For the quarter to 30 September 2026 YTL Power reported revenue of RM7,543.4 million, up 41%, citing an increased contribution from the data center segment with the progressive completion and occupancy ramp-up of additional data halls.
- YTL Power subsidiary SIPP Power agreed with JLand Group to acquire about 145 acres in Sedenak Tech Park West (STeP), Johor, with an option on up to 400 more acres (about 545 acres in total), for a new gigawatt-scale data centre campus to complement the Kulai park.
- YTL Power said it had invested RM8.1 billion in the data center business to date, that 298 MW of data center capacity was already contracted, and that it plans to increase the YTL Green Data Center Park from 600 MW to 1,000 MW, co-powered by solar with a first 215 MWac solar phase being built. Data centers became a separate reporting segment, with RM225 million revenue in the quarter to 31 March 2026.
- YTL Power reported completion of its AI data centre facility built with NVIDIA at the YTL Green Data Center Park in Kulai, running liquid-cooled NVL72 Grace Blackwell (GB200) GPUs, and said the YTL AI Cloud is operational.
Company details checked against company and official sources, 20 Nov 2026.
- Capacity under construction or planned (240 MW) is 2.2 times the operational base of 110 MW.
- Its largest operational site is Johor Data Center 1 (JDC1) in Kulai, Malaysia at 72 MW.
- The largest project in the pipeline is Johor Data Center 3 (JDC3) by YTL Data Centers (80 MW, under construction).
- Malaysia accounts for 96% of tracked capacity (8 facilities).
- By type, the tracker lists 6 colocation, 2 hyperscale and 1 edge facilities.
- 8 of 9 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
YTL Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 160 MW under construction and 80 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Johor Data Center 3 (JDC3)YTL Data Centers | Kulai, Malaysia | Under construction | Colocation | 80 MW |
| Johor Data Center 5 (JDC5)YTL Data Centers | Kulai, Malaysia | Planned | Colocation | 80 MW |
| Johor Data Center 4 (JDC4)YTL Data Centers | Kulai, Malaysia | Under construction | Hyperscale | 40 MW |
| Johor Data Center 6 (JDC6)YTL Data Centers | Kulai, Malaysia | Under construction | Colocation | 40 MW |
Facilities
9 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Johor Data Center 3 (JDC3)Colocation | Kulai, Malaysia | Under construction | 80 MW IT | — | Operator / official |
| Johor Data Center 5 (JDC5)Colocation | Kulai, Malaysia | Planned | 80 MW | — | Trade press |
Johor Data Center 1 (JDC1)Colocation
History
|
Kulai, Malaysia | Operational | 72 MW | — | Operator / official |
| Johor Data Center 4 (JDC4)Hyperscale | Kulai, Malaysia | Under construction | 40 MW IT | — | Trade press |
| Johor Data Center 6 (JDC6)Colocation | Kulai, Malaysia | Under construction | 40 MW IT | — | Operator / official |
| Johor Data Center 2 (JDC2)Colocation | Kulai, Malaysia | Operational | 20 MW IT | — | Operator / official |
YTL Singapore Data Center – DodidColocation
History
|
Singapore, Singapore | Operational | 12.5 MW | 2018 | Operator / official |
| Sentul Data Center 1Edge | Kuala Lumpur, Malaysia | Operational | 5 MW | — | Operator / official |
YTL Sedenak Tech Park West data centre campusHyperscale
History
|
Sedenak, Malaysia | Planned | — | — | Operator / official |
Market position
How YTL Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Malaysia, YTL Data Centers ranks #6 of 31 tracked operators by capacity, with 7.1% of the country’s tracked MW.
- Malaysia has 81 tracked data centers from 31 operators: 1,248 MW operational and 3,511 MW under construction or planned.
- Industrial electricity in Malaysia costs 105 USD/MWh (2026, latest official figure).
- In Singapore, YTL Data Centers ranks #8 of 21 tracked operators by capacity, with 1.7% of the country’s tracked MW.
- Kulai also hosts 7 other tracked data center(s), run by Vantage Data Centers, Princeton Digital Group, Bridge Data Centres and K2 Strategic.
Data center operators in Malaysia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Vantage Data Centers | 3 | 331 MW | 436 MW |
| AirTrunk | 4 | 150 MW | 550 MW |
| Bridge Data Centres | 5 | 146 MW | 500 MW |
| Princeton Digital Group | 2 | 200 MW | 300 MW |
| Vena Nexus | 1 | — | 350 MW |
| MSFusion | 1 | — | 300 MW |
| EdgeConneX | 3 | — | 284 MW |
| STACK Infrastructure | 1 | — | 220 MW |
All data centers in Malaysia Power and policy in Malaysia
Data center operators in Singapore
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| ST Telemedia Global Data Centres | 7 | 112 MW | 50 MW |
| AirTrunk | 2 | 78 MW | 70 MW |
| Digital Realty | 4 | 80 MW | 50 MW |
| Keppel | 11 | — | 75 MW |
| Equinix | 7 | 20 MW | 50 MW |
| Nxera | 3 | 58 MW | — |
| DayOne | 1 | — | 20 MW |
| BDx | 1 | 12 MW | — |
All data centers in Singapore Power and policy in Singapore
Other data centers in Kulai
- JHB1 · Vantage Data Centers · Operational · 300 MW
- JH1 · Princeton Digital Group · Operational · 200 MW
- MY06 · Bridge Data Centres · Operational · 110 MW
- JHR01-03 · K2 Strategic · Operational · 60 MW
- JHR04 · K2 Strategic · Planned · 24 MW
- Eco Business Park VI site · Microsoft · Planned
- Quantum Edge (Eco Business Park VI) site · KNBDC · Planned
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does YTL Data Centers operate?
DC Market Insights tracks 9 YTL Data Centers data center(s) in 2 countries as of November 2026: 4 operational, 3 under construction and 2 planned.
Where is YTL Data Centers headquartered?
YTL Data Centers is headquartered in Singapore, Singapore. Ownership: Subsidiary of YTL Power International Berhad (listed on Bursa Malaysia), part of YTL Corporation.
Which other companies operate data centers in Malaysia?
Besides YTL Data Centers, the largest operators we track in Malaysia by capacity are Vantage Data Centers, AirTrunk, Bridge Data Centres, Princeton Digital Group and Vena Nexus. The Malaysia page lists all 31 operators.
What rules apply to data centers in Malaysia?
Our Power & Policy Tracker lists 8 government actions on data centers and power in Malaysia, including 1 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Kulai?
Other tracked data centers in Kulai include JHB1 (Vantage Data Centers), JH1 (Princeton Digital Group), MY06 (Bridge Data Centres) and JHR01-03 (K2 Strategic).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?