Proprietary data

MSFusion Data Centers

Data centers operated by MSFusion that we have verified: location, status and capacity, each checked against its source.

In short

As of 21 October 2026, DC Market Insights tracks 1 data center operated by MSFusion in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
300 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

MSFusion Kota Tinggi data center site · MSFusion · Kota Tinggi (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

MSFusion data centers: key facts

  • The largest project in the pipeline is MSFusion Kota Tinggi data center site (300 MW, planned).

MSFusion development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 300 MW planned in total.

ProjectLocationStatusTypeCapacity
MSFusion Kota Tinggi data center siteMSFusion Kota Tinggi, Malaysia Planned Hyperscale 300 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
MSFusion Kota Tinggi data center siteHyperscale
History
  1. Announced
  2. Planned
Kota Tinggi, Malaysia Planned 300 MW total — Trade press

Market position

How MSFusion compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Malaysia, MSFusion ranks #7 of 31 tracked operators by capacity, with 6.3% of the country’s tracked MW.
  • Malaysia has 79 tracked data centers from 31 operators: 1,219 MW operational and 3,511 MW under construction or planned.
  • Industrial electricity in Malaysia costs 105 USD/MWh (2026, latest official figure).
  • Kota Tinggi also hosts 1 other tracked data center(s), run by Digital Edge.

Data center operators in Malaysia

Tracked facilities7931 operators
Operational capacity1,219 MW3,511 MW in the pipeline
MSFusion rank by capacity#7of 31 operators · 6.3%
Industrial power price105 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Vantage Data Centers3331 MW436 MW
AirTrunk4150 MW550 MW
Bridge Data Centres5146 MW500 MW
Princeton Digital Group2200 MW300 MW
Vena Nexus1—350 MW
YTL Data Centers668 MW240 MW
EdgeConneX3—284 MW
STACK Infrastructure1—220 MW

All data centers in Malaysia Power and policy in Malaysia

Other data centers in Kota Tinggi

  • Digital Edge Johor (Bandar Cemerlang site) · Digital Edge · Planned

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does MSFusion operate?

DC Market Insights tracks 1 MSFusion data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Malaysia?

Besides MSFusion, the largest operators we track in Malaysia by capacity are Vantage Data Centers, AirTrunk, Bridge Data Centres, Princeton Digital Group and Vena Nexus. The Malaysia page lists all 31 operators.

What rules apply to data centers in Malaysia?

Our Power & Policy Tracker lists 8 government actions on data centers and power in Malaysia, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Kota Tinggi?

Other tracked data centers in Kota Tinggi include Digital Edge Johor (Bandar Cemerlang site) (Digital Edge).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst