In short

As of 10 October 2026, DC Market Insights tracks 14 data centers operated by AirTrunk in 5 countries, of which 7 are operational. Stated operational capacity is 828 MW, with a further 20 MW under construction and 1,074 MW planned. The pipeline is 1.3 times the capacity already operating.

14Facilities tracked
5Countries
828 MWOperational (7 sites)
20 MWUnder construction (1 site)
1,074 MWPlanned (6 sites)

MW = IT capacity where the source states it, otherwise total capacity. 14 of 14 facilities have a stated capacity; the others are counted as sites only.

SGP1 Singapore · AirTrunk · Singapore (approximate location)SGP2 Singapore · AirTrunk · Singapore (approximate location)JHB1 · AirTrunk · Johor Bahru (approximate location)JHB2 · AirTrunk · Johor Bahru (approximate location)JHB3 · AirTrunk · Iskandar Puteri (approximate location)JHB4 · AirTrunk · Iskandar Puteri (approximate location)TOK1 · AirTrunk · Inzai (approximate location)TOK2 · AirTrunk · Tokyo (approximate location)OSK1 · AirTrunk · Osaka (approximate location)OSK2 · AirTrunk · Osaka (approximate location)SYD2 · AirTrunk · Sydney (approximate location)MEL1 · AirTrunk · Melbourne (approximate location)MEL2 · AirTrunk · Melbourne (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

AirTrunk data centers: key facts

About AirTrunk

AirTrunk builds and operates hyperscale data centre campuses in Australia, Hong Kong, India, Japan, Malaysia and Singapore. Its own news states more than 3GW of operating and planned capacity across 20 campuses in six operating regions after the April 2026 Lumina CloudInfra acquisition.

Founded
2015
Ownership
Owned by a consortium led by Blackstone and CPP Investments (acquired in 2024)
Tracked footprint
14 facilities in 5 countries
Website
airtrunk.com

Data center business

  • Malaysia platform stated as more than 700 MW across four campuses after the JHB3 and JHB4 announcement.
  • Hyperscale platform that will scale to more than over 3.3 GW of operating and planned capacity across 22 campuses in six operating regions (Australia, Singapore, Japan, Malaysia, Hong Kong, and India), post JHB3 and JHB4.
  • Post-acquisition AirTrunk total stated as more than 3GW of operating and planned capacity across 20 campuses in six operating regions.
  • Location pages list campuses in Australia (SYD1-3, MEL1-2), Hong Kong (HKG1-2), India (BOM1-3, MAA1, HYD1), Japan (TOK1-2, OSK1-2), Malaysia (JHB1-4) and Singapore (SGP1-2).
  • AirTrunk is a hyperscale data centre specialist serving cloud, content and large enterprise customers across the Asia-Pacific & Middle East (APME) region.

Recent updates

  • AirTrunk announced US$2.325 billion (RM9.5 billion) of green financing for the JHB2 campus in Johor Bahru, from a consortium of 30 institutions.
  • A 29.99 MWac solar project developed by ib vogt began delivering clean energy into Malaysia's grid under a virtual PPA with AirTrunk.
  • AirTrunk announced a proposed investment of more than INR 3,000 billion (US$30 billion) in India by 2030, with 5GW of proposed new capacity; its existing pipeline is 600MW across Mumbai, Chennai and Hyderabad.
  • AirTrunk announced two new Johor campuses, JHB3 and JHB4, with MYR12 billion (USD3 billion) of investment.
  • AirTrunk announced the acquisition of Lumina CloudInfra, entering India with operations in Mumbai, Chennai and Hyderabad and a portfolio of about 600 MW of planned capacity.
  • AirTrunk announced acquisition of a site in Melbourne's north-west for MEL2, with over 354MW capacity.
  • AirTrunk announced plans for OSK2 in East Osaka, up to 100MW of total campus IT capacity.

Company details checked against company and official sources, 14 Nov 2026.

  • Capacity under construction or planned (1,094 MW) is 1.3 times the operational base of 828 MW.
  • Its largest operational site is TOK1 in Inzai, Japan at 300 MW.
  • The largest project in the pipeline is MEL2 by AirTrunk (354 MW, planned).
  • Malaysia accounts for 36% of tracked capacity (4 facilities).
  • 10 facilities publish a PUE figure; the lowest is 1.15 at SYD2 (AirTrunk) and the median is 1.15.
Capacity by status, MW
Operational828 MW
Under construction20 MW
Planned1,074 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
50'17'18'1920'20300'21'22'23260'24

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Capacity by country, MW
Malaysia700 MW
Japan530 MW
Australia524 MW
Singapore148 MW

OperationalUnder construction or planned

AirTrunk development pipeline

Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and 1,074 MW planned in total.

ProjectLocationStatusTypeCapacity
MEL2AirTrunk Melbourne, Australia Planned Hyperscale 354 MW
JHB2AirTrunk Johor Bahru, Malaysia Planned Hyperscale 270 MW
JHB4AirTrunk Iskandar Puteri, Malaysia Planned Hyperscale 142 MW
JHB3AirTrunk Iskandar Puteri, Malaysia Planned Hyperscale 138 MW
OSK2AirTrunk Osaka, Japan Planned Hyperscale 100 MW
SGP2 SingaporeAirTrunk Singapore, Singapore Planned Hyperscale 70 MW
OSK1AirTrunk Osaka, Japan Under construction Hyperscale 20 MW

Facilities

14 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
MEL2Hyperscale Melbourne, Australia Planned 354 MW total — Operator / official
TOK1Hyperscale Inzai, Japan Operational 300 MW total 2021 Operator / official
JHB2Hyperscale
1 deal
  • 30 banks incl. BNP Paribas, Credit Agricole CIB, DBS, ING, Mizuho, MUFG, Societe Generale, SMBC, HSBC, UOB, CIMB, Clifford Capital, IFC, NBK, Standard Chartered → AirTrunk JHB2 hyperscale campus, Johor Bahru
  • All deals in the Deal Tracker
Johor Bahru, Malaysia Planned 270 MW — Trade press
JHB1Hyperscale Johor Bahru, Malaysia Operational 150 MW 2024 Operator / official
JHB4Hyperscale
History
  1. Announced
  2. Planned
Iskandar Puteri, Malaysia Planned 142 MW — Operator / official
JHB3Hyperscale
History
  1. Announced
  2. Planned
Iskandar Puteri, Malaysia Planned 138 MW — Operator / official
SYD2Hyperscale Sydney, Australia Operational 120 MW total — Operator / official
TOK2Hyperscale Tokyo, Japan Operational 110 MW total 2024 Operator / official
OSK2Hyperscale Osaka, Japan Planned 100 MW total — Operator / official
SGP1 SingaporeHyperscale
History
  1. Operational
  2. Operational
Singapore, Singapore Operational 78 MW — Operator / official
SGP2 SingaporeHyperscale Singapore, Singapore Planned 70 MW — Operator / official
MEL1Hyperscale Melbourne, Australia Operational 50 MW total 2017 Operator / official
HKG1Hyperscale Hong Kong, Hong Kong Operational 20 MW total 2020 Operator / official
OSK1Hyperscale Osaka, Japan Under construction 20 MW total — Operator / official

Market position

How AirTrunk compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Japan, AirTrunk ranks #1 of 20 tracked operators by capacity, with 30% of the country’s tracked MW.
  • Japan has 74 tracked data centers from 20 operators: 697 MW operational and 1,059 MW under construction or planned.
  • In Malaysia, AirTrunk ranks #2 of 31 tracked operators by capacity, with 15% of the country’s tracked MW.
  • In Australia, AirTrunk ranks #2 of 3 tracked operators by capacity, with 40% of the country’s tracked MW.
  • Our Deal Tracker lists 1 deal(s) naming AirTrunk, the latest on 27 October 2026.

Data center operators in Japan

Tracked facilities7420 operators
Operational capacity697 MW1,059 MW in the pipeline
AirTrunk rank by capacity#1of 20 operators · 30%
Renewable share of generation23.1%2024
OperatorFacilitiesOperational MWPipeline MW
Colt DCS9101 MW262 MW
EdgeConneX1—200 MW
NTT DATA330 MW136 MW
CloudHQ1—96.4 MW
ST Telemedia Global Data Centres1—70.8 MW
Vantage Data Centers1—68 MW
Equinix1854 MW—
CyrusOne1—48 MW

All data centers in Japan Power and policy in Japan

Data center operators in Malaysia

Tracked facilities8131 operators
Operational capacity1,248 MW3,511 MW in the pipeline
AirTrunk rank by capacity#2of 31 operators · 15%
Industrial power price105 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Vantage Data Centers3331 MW436 MW
Bridge Data Centres5146 MW500 MW
Princeton Digital Group2200 MW300 MW
Vena Nexus1—350 MW
YTL Data Centers897 MW240 MW
MSFusion1—300 MW
EdgeConneX3—284 MW
STACK Infrastructure1—220 MW

All data centers in Malaysia Power and policy in Malaysia

Data center operators in Australia

Tracked facilities63 operators
Operational capacity170 MW1,138 MW in the pipeline
AirTrunk rank by capacity#2of 3 operators · 40%
Renewable share of generation39%2025
OperatorFacilitiesOperational MWPipeline MW
Keppel2—720 MW
Vantage Data Centers1—64 MW

All data centers in Australia Power and policy in Australia

Deals naming AirTrunk

  • Banco Santander, BNP Paribas, Credit Agricole CIB, DBS Bank, Deutsche Bank, ING, Mizuho, MUFG, National Australia Bank, Royal Bank of Canada, Societe Generale, SMBC, HSBC, UOB (lead banks; 32 lenders in total) → AirTrunk SYD3 campus, Western Sydney Financing $2.99B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does AirTrunk operate?

DC Market Insights tracks 14 AirTrunk data center(s) in 5 countries as of October 2026: 7 operational, 1 under construction and 6 planned.

Which other companies operate data centers in Japan?

Besides AirTrunk, the largest operators we track in Japan by capacity are Colt DCS, EdgeConneX, NTT DATA, CloudHQ and ST Telemedia Global Data Centres. The Japan page lists all 20 operators.

What rules apply to data centers in Japan?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Japan, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst