Proprietary data
AirTrunk Data Centers
Data centers operated by AirTrunk that we have verified: location, status and capacity, each checked against its source.
In short
As of 10 October 2026, DC Market Insights tracks 14 data centers operated by AirTrunk in 5 countries, of which 7 are operational. Stated operational capacity is 828 MW, with a further 20 MW under construction and 1,074 MW planned. The pipeline is 1.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 14 of 14 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
AirTrunk data centers: key facts
About AirTrunk
AirTrunk builds and operates hyperscale data centre campuses in Australia, Hong Kong, India, Japan, Malaysia and Singapore. Its own news states more than 3GW of operating and planned capacity across 20 campuses in six operating regions after the April 2026 Lumina CloudInfra acquisition.
- Founded
- 2015
- Ownership
- Owned by a consortium led by Blackstone and CPP Investments (acquired in 2024)
- Tracked footprint
- 14 facilities in 5 countries
- Website
- airtrunk.com
Data center business
- Malaysia platform stated as more than 700 MW across four campuses after the JHB3 and JHB4 announcement.
- Hyperscale platform that will scale to more than over 3.3 GW of operating and planned capacity across 22 campuses in six operating regions (Australia, Singapore, Japan, Malaysia, Hong Kong, and India), post JHB3 and JHB4.
- Post-acquisition AirTrunk total stated as more than 3GW of operating and planned capacity across 20 campuses in six operating regions.
- Location pages list campuses in Australia (SYD1-3, MEL1-2), Hong Kong (HKG1-2), India (BOM1-3, MAA1, HYD1), Japan (TOK1-2, OSK1-2), Malaysia (JHB1-4) and Singapore (SGP1-2).
- AirTrunk is a hyperscale data centre specialist serving cloud, content and large enterprise customers across the Asia-Pacific & Middle East (APME) region.
Recent updates
- AirTrunk announced US$2.325 billion (RM9.5 billion) of green financing for the JHB2 campus in Johor Bahru, from a consortium of 30 institutions.
- A 29.99 MWac solar project developed by ib vogt began delivering clean energy into Malaysia's grid under a virtual PPA with AirTrunk.
- AirTrunk announced a proposed investment of more than INR 3,000 billion (US$30 billion) in India by 2030, with 5GW of proposed new capacity; its existing pipeline is 600MW across Mumbai, Chennai and Hyderabad.
- AirTrunk announced two new Johor campuses, JHB3 and JHB4, with MYR12 billion (USD3 billion) of investment.
- AirTrunk announced the acquisition of Lumina CloudInfra, entering India with operations in Mumbai, Chennai and Hyderabad and a portfolio of about 600 MW of planned capacity.
- AirTrunk announced acquisition of a site in Melbourne's north-west for MEL2, with over 354MW capacity.
- AirTrunk announced plans for OSK2 in East Osaka, up to 100MW of total campus IT capacity.
Company details checked against company and official sources, 14 Nov 2026.
- Capacity under construction or planned (1,094 MW) is 1.3 times the operational base of 828 MW.
- Its largest operational site is TOK1 in Inzai, Japan at 300 MW.
- The largest project in the pipeline is MEL2 by AirTrunk (354 MW, planned).
- Malaysia accounts for 36% of tracked capacity (4 facilities).
- 10 facilities publish a PUE figure; the lowest is 1.15 at SYD2 (AirTrunk) and the median is 1.15.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned Facilities with a stated year and capacity only.
OperationalUnder construction or planned
AirTrunk development pipeline
Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and 1,074 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| MEL2AirTrunk | Melbourne, Australia | Planned | Hyperscale | 354 MW |
| JHB2AirTrunk | Johor Bahru, Malaysia | Planned | Hyperscale | 270 MW |
| JHB4AirTrunk | Iskandar Puteri, Malaysia | Planned | Hyperscale | 142 MW |
| JHB3AirTrunk | Iskandar Puteri, Malaysia | Planned | Hyperscale | 138 MW |
| OSK2AirTrunk | Osaka, Japan | Planned | Hyperscale | 100 MW |
| SGP2 SingaporeAirTrunk | Singapore, Singapore | Planned | Hyperscale | 70 MW |
| OSK1AirTrunk | Osaka, Japan | Under construction | Hyperscale | 20 MW |
Facilities
14 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| MEL2Hyperscale | Melbourne, Australia | Planned | 354 MW total | — | Operator / official |
| TOK1Hyperscale | Inzai, Japan | Operational | 300 MW total | 2021 | Operator / official |
JHB2Hyperscale
1 deal
|
Johor Bahru, Malaysia | Planned | 270 MW | — | Trade press |
| JHB1Hyperscale | Johor Bahru, Malaysia | Operational | 150 MW | 2024 | Operator / official |
JHB4Hyperscale
History
|
Iskandar Puteri, Malaysia | Planned | 142 MW | — | Operator / official |
JHB3Hyperscale
History
|
Iskandar Puteri, Malaysia | Planned | 138 MW | — | Operator / official |
| SYD2Hyperscale | Sydney, Australia | Operational | 120 MW total | — | Operator / official |
| TOK2Hyperscale | Tokyo, Japan | Operational | 110 MW total | 2024 | Operator / official |
| OSK2Hyperscale | Osaka, Japan | Planned | 100 MW total | — | Operator / official |
SGP1 SingaporeHyperscale
History
|
Singapore, Singapore | Operational | 78 MW | — | Operator / official |
| SGP2 SingaporeHyperscale | Singapore, Singapore | Planned | 70 MW | — | Operator / official |
| MEL1Hyperscale | Melbourne, Australia | Operational | 50 MW total | 2017 | Operator / official |
| HKG1Hyperscale | Hong Kong, Hong Kong | Operational | 20 MW total | 2020 | Operator / official |
| OSK1Hyperscale | Osaka, Japan | Under construction | 20 MW total | — | Operator / official |
Market position
How AirTrunk compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Japan, AirTrunk ranks #1 of 20 tracked operators by capacity, with 30% of the country’s tracked MW.
- Japan has 74 tracked data centers from 20 operators: 697 MW operational and 1,059 MW under construction or planned.
- In Malaysia, AirTrunk ranks #2 of 31 tracked operators by capacity, with 15% of the country’s tracked MW.
- In Australia, AirTrunk ranks #2 of 3 tracked operators by capacity, with 40% of the country’s tracked MW.
- Our Deal Tracker lists 1 deal(s) naming AirTrunk, the latest on 27 October 2026.
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Colt DCS | 9 | 101 MW | 262 MW |
| EdgeConneX | 1 | — | 200 MW |
| NTT DATA | 3 | 30 MW | 136 MW |
| CloudHQ | 1 | — | 96.4 MW |
| ST Telemedia Global Data Centres | 1 | — | 70.8 MW |
| Vantage Data Centers | 1 | — | 68 MW |
| Equinix | 18 | 54 MW | — |
| CyrusOne | 1 | — | 48 MW |
All data centers in Japan Power and policy in Japan
Data center operators in Malaysia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Vantage Data Centers | 3 | 331 MW | 436 MW |
| Bridge Data Centres | 5 | 146 MW | 500 MW |
| Princeton Digital Group | 2 | 200 MW | 300 MW |
| Vena Nexus | 1 | — | 350 MW |
| YTL Data Centers | 8 | 97 MW | 240 MW |
| MSFusion | 1 | — | 300 MW |
| EdgeConneX | 3 | — | 284 MW |
| STACK Infrastructure | 1 | — | 220 MW |
All data centers in Malaysia Power and policy in Malaysia
Data center operators in Australia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Keppel | 2 | — | 720 MW |
| Vantage Data Centers | 1 | — | 64 MW |
All data centers in Australia Power and policy in Australia
Deals naming AirTrunk
- Banco Santander, BNP Paribas, Credit Agricole CIB, DBS Bank, Deutsche Bank, ING, Mizuho, MUFG, National Australia Bank, Royal Bank of Canada, Societe Generale, SMBC, HSBC, UOB (lead banks; 32 lenders in total) → AirTrunk SYD3 campus, Western Sydney Financing $2.99B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does AirTrunk operate?
DC Market Insights tracks 14 AirTrunk data center(s) in 5 countries as of October 2026: 7 operational, 1 under construction and 6 planned.
Which other companies operate data centers in Japan?
Besides AirTrunk, the largest operators we track in Japan by capacity are Colt DCS, EdgeConneX, NTT DATA, CloudHQ and ST Telemedia Global Data Centres. The Japan page lists all 20 operators.
What rules apply to data centers in Japan?
Our Power & Policy Tracker lists 9 government actions on data centers and power in Japan, including 0 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.