Proprietary data

Data Centers in Tajikistan

Every data center in Tajikistan that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 2 data centers in Tajikistan run by 2 operators: 0 operational, 0 under construction and 2 planned.

2Facilities tracked
2Operators
—Operational (0 sites)
—Under construction (0 sites)
—Planned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 2 facilities have a stated capacity; the others are counted as sites only.

Tajikistan National Data Center (Dushanbe) · Presight / Scale AI (Government of Tajikistan) · Dushanbe (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Tajikistan data center market: key facts

  • Darvoz is the largest cluster: 1 of 2 facilities and 0% of tracked capacity.
  • By type, the tracker lists 1 hyperscale and 1 other facilities.
  • 0 of 2 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Hyperscale1
Other1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Tajikistan

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
darya.ai / Yotta Data Services1———
Presight / Scale AI (Government of Tajikistan)1———

How Tajikistan compares in Asia-Pacific

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
India199312,276 MW7,840 MW
Malaysia81311,248 MW3,511 MW
Indonesia21899 MW1,672 MW
Japan7420697 MW1,059 MW
Australia63170 MW1,138 MW
Singapore5221400 MW315 MW
Uzbekistan1383.1 MW364 MW
Kazakhstan361333.1 MW312 MW
South Korea8468.4 MW228 MW
China209196 MW64 MW
Taiwan361192 MW165 MW
Thailand8625 MW232 MW

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
darya.ai / Yotta Green AI Data Center (Darvoz)darya.ai / Yotta Data Services Planned — — Trade press
Tajikistan National Data Center (Dushanbe)Presight / Scale AI (Government of Tajikistan) Dushanbe Planned — — Trade press

Get the data

Every data center in Tajikistan, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Tajikistan

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Tajikistan

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Tajikistan?

DC Market Insights tracks 2 data centers in Tajikistan as of October 2026: 0 operational, 0 under construction and 2 planned, run by 2 operators. The count grows as we verify more sites.

Where are the data centers in Tajikistan located?

The largest clusters by tracked capacity are Darvoz (1 facilities) and Dushanbe (1 facilities). The map above shows every site.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy