Germany Data Center Capacity

Installed data center capacity in Germany (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity Germany has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.

3.0 GWInstalled, end 2025IT load, DC Market Insights estimate
19%Share of Europe2025
#3Rank among 26 countriesInstalled capacity, 2025
175Sites in our tracker88 with a stated MW

Germany data center capacity at a glance

Germany had about 3.0 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 19% of the capacity in Europe and puts Germany at number 3 of the 26 countries in our global model. Our Data Center Tracker holds 175 sites in Germany run by 53 operators: 124 operational, 23 under construction and 28 planned. Our trackers also hold 10 verified deals and 7 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Germany

845 MWStated at operational sites (124)
2,014 MWUnder construction (23 sites)
2,449 MWPlanned (28 sites)
53Operators

Largest tracked sites

SiteOperatorCityStatusMW
Hohenhameln (Mehrum)Telis Energie DeutschlandHohenhamelnPlanned500
Rechenzentrum Zschortau-RackwitzAM:PM GrundRackwitzPlanned500
Frankfurt 6NTT DATANiersteinUnder construction482 IT
Wustermark CampusVirtus Data CentresWustermarkUnder construction300
CloudHQ Frankfurt-Höchst campusCloudHQFrankfurt am MainPlanned276
DummerstorfSchwarz Digits (STACKIT)DummerstorfPlanned240
AWS European Sovereign Cloud, MassenAmazon Web ServicesMassenUnder construction200
Lübbenau, Home of STACKITSchwarz Digits (STACKIT)LübbenauUnder construction200
Schladen-Werla DatacenterGdd Green Datacenter DevelopmentSchladenPlanned200
BER02maincubesNauenUnder construction186 IT

Every Germany site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Frankfurt am Main5713234
Hamburg14106
Berlin8654
Munich646
Düsseldorf641
Karlsruhe62n/a
Hattersheim4274
Nuremberg4316

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
NTT DATA12223658
AM:PM Grund1n/a500
Telis Energie Deutschland1n/a500
Schwarz Digits (STACKIT)2n/a440
CloudHQ2112276
Virtus Data Centres2n/a358
Amazon Web Services2n/a300
CyrusOne760219

Operators ranked by MW stated at their tracked sites in Germany.

Power context

Rules in force

  • PlanRechenzentrumsstrategie der Bundesregierung
  • GridPositionspapier der Übertragungsnetzbetreiber (ÜNB) zu Netzanschlüssen, Reifegradverfahren
  • RegulationRechenzentrumsregister (Energieeffizienzregister für Rechenzentren), Meldepflicht nach § 13 EnEfG und Delegierter Verordnung (EU) 2024/1364
  • RenewableEnergieeffizienzgesetz (EnEfG) § 11 Abs. 5, Stromversorgung von Rechenzentren aus erneuerbaren Energien
  • EfficiencyEnergieeffizienzgesetz (EnEfG) § 11 Abs. 2, Anteil wiederverwendeter Energie (Abwärmenutzung) in Rechenzentren

From government sources. Power and policy in Germany

Recent deals

  • Sep 2026 · Land / campus30MW data center development site, Unterschleißheim, Greater Munich, 30 MW
  • Aug 2026 · Land / campus240MW data center (expandable to 1GW by 2045), industrial park near Rostock, 240 MW, USD 6.5 bn
  • Aug 2026 · Land / campusEight Edge colocation data centers in Augsburg, Konstanz, Munich, Nuremberg and Stuttgart, 46 MW, USD 582 m
  • Aug 2026 · M&Afirstcolo Holding GmbH (Frankfurt colocation operator; two operating DCs plus 24MW FRA7 under construction in Rosbach)
  • Jul 2026 · FinancingCyanis AI, USD 0 m
  • Jul 2026 · Land / campus23-hectare site for AI data centre, Grevenbroich

Deal Tracker

Other countries in Europe

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Germany in the full data pack

By year to 2035

Installed MW for Germany from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Germany have?

We estimate about 3.0 GW of installed data center capacity (IT load) in Germany at the end of 2025, about 19% of Europe and number 3 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Germany?

Our Data Center Tracker lists 175 sites in Germany (124 operational, 23 under construction, 28 planned), run by 53 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Germany?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are NTT DATA, AM:PM Grund, Telis Energie Deutschland. Site capacity is counted only where a source states it.

What rules apply to data centers in Germany?

Our Power and Policy Tracker lists 7 government measures in force for Germany, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Germany data center capacity grow to 2035?

The full data pack gives installed capacity for Germany by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.