Data pack · Updated 12 November 2026
How much data center capacity Ireland has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.
Ireland data center capacity at a glance
Ireland had about 1.4 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 9% of the capacity in Europe and puts Ireland at number 12 of the 33 countries in our global model. Our Data Center Tracker holds 46 sites in Ireland run by 19 operators: 29 operational, 2 under construction and 15 planned. Our trackers also hold 1 verified deals and 8 government measures in force for the country.
Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.
What our tracker holds for Ireland
Largest tracked sites
| Site | Operator | City | Status | MW |
|---|---|---|---|---|
| Red Admiral DC Westmeath (Collinstown) | Red Admiral DC | Collinstown | Planned | 250 |
| Art Data Centres Ennis campus | Art Data Centres | Ennis | Planned | 200 |
| Echelon DUB20 Arklow | Echelon Data Centres | Arklow | Under construction | 200 IT |
| Enginenode data storage campus (Bracetown, Clonee) | Enginenode | Clonee | Planned | 180 |
| Herbata Naas data centre campus | Herbata | Naas | Planned | 180 |
| Huntstown data centre campus (Finglas) | Huntstown Power Company | Dublin | Planned | 150 |
| AWS Cruiserath Buildings E, F and G (Mulhuddart) | Amazon Web Services | Dublin | Planned | 73 |
| Vantage Dublin (DUB1) campus | Vantage Data Centers | Dublin | Planned | 52 IT |
| AWS Drogheda data storage facility 1 (IDA Business & Technology Park) | Amazon Web Services | Drogheda | Under construction | 48 |
| AWS Drogheda data storage facility 2 (IDA Business & Technology Park) | Amazon Web Services | Drogheda | Planned | 48 |
Where the sites are
| City | Sites | Operators | MW stated, live |
|---|---|---|---|
| Dublin | 34 | 12 | 53 |
| Naas | 2 | 2 | n/a |
| Drogheda | 2 | 1 | n/a |
| Clonee | 2 | 2 | n/a |
| Lucan | 1 | 1 | n/a |
| Leixlip | 1 | 1 | n/a |
| Ennis | 1 | 1 | n/a |
| Collinstown | 1 | 1 | n/a |
Cities with the most tracked sites. MW only where a source states it.
Who runs them
| Operator | Sites | MW live | MW pipeline |
|---|---|---|---|
| Red Admiral DC | 1 | n/a | 250 |
| Echelon Data Centres | 2 | n/a | 200 |
| Art Data Centres | 1 | n/a | 200 |
| Herbata | 1 | n/a | 180 |
| Enginenode | 1 | n/a | 180 |
| Amazon Web Services | 6 | n/a | 169 |
| Huntstown Power Company | 1 | n/a | 150 |
| EdgeConneX | 4 | 25 | 37 |
Operators ranked by MW stated at their tracked sites in Ireland.
Power context
- Grid emission factor, 20250.198 kgCO2/kWh · Sustainable Energy Authority of Ireland
- Industrial power price, 2025234.1 USD/MWh · Eurostat
- Renewable share of electricity, 202441.3 % · Sustainable Energy Authority of Ireland
Rules in force
- GridData Centre Connection Offer Process and Policy (DCCOPP) Version 3
- RestrictionEirGrid Data Centre Constrained Area Overview (May 2026)
- PlanLarge Energy User Action Plan (LEAP)
- RenewableCRU clarification permitting private wire connections for data centres (CRU/2025236)
- GridLarge Energy User Connection Policy Decision (CRU/2025236)
From government sources. Power and policy in Ireland
Recent deals
- Jan 2026 · FinancingKildare Innovation Campus data centre (phase 1), USD 398 m
Other countries in Europe
- Germany3.0 GW
- United Kingdom1.9 GW
- Netherlands1.5 GW
- France1.2 GW
- Italy0.8 GW
- Spain0.5 GW
- Sweden0.5 GW
- Norway0.5 GW
- Poland0.2 GW
Installed capacity, end 2025, DC Market Insights estimate. All countries and regions
Ireland in the full data pack
By year to 2035
Installed MW for Ireland from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.
Leading hubs
Live and pipeline MW for the main metro markets, with the basis of each figure.
Every tracked site
The full site list with operator, location, status, MW and source, refreshed from our tracker.
Frequently asked questions
How much data center capacity does Ireland have?
We estimate about 1.4 GW of installed data center capacity (IT load) in Ireland at the end of 2025, about 9% of Europe and number 12 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.
How many data centers are there in Ireland?
Our Data Center Tracker lists 46 sites in Ireland (29 operational, 2 under construction, 15 planned), run by 19 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.
Which companies have the most tracked data center capacity in Ireland?
By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Red Admiral DC, Echelon Data Centres, Art Data Centres. Site capacity is counted only where a source states it.
What rules apply to data centers in Ireland?
Our Power and Policy Tracker lists 8 government measures in force for Ireland, such as incentives, tariffs, grid rules and national plans, each linked to the official source.
How will Ireland data center capacity grow to 2035?
The full data pack gives installed capacity for Ireland by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.