United Kingdom Data Center Capacity

Installed data center capacity in United Kingdom (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity United Kingdom has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.

1.9 GWInstalled, end 2025IT load, DC Market Insights estimate
12%Share of Europe2025
#5Rank among 26 countriesInstalled capacity, 2025
181Sites in our tracker95 with a stated MW

United Kingdom data center capacity at a glance

United Kingdom had about 1.9 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 12% of the capacity in Europe and puts United Kingdom at number 5 of the 26 countries in our global model. Our Data Center Tracker holds 181 sites in United Kingdom run by 48 operators: 130 operational, 7 under construction and 44 planned. Our trackers also hold 17 verified deals and 9 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for United Kingdom

760 MWStated at operational sites (130)
266 MWUnder construction (7 sites)
6,779 MWPlanned (44 sites)
48Operators

Largest tracked sites

SiteOperatorCityStatusMW
Elsham Tech ParkElsham Tech Park Ltd (Greystoke)ElshamPlanned1,000
QTS CamboisQTSBlythPlanned720
Cato (Auchtertool)ILI GroupAuchtertoolPlanned600
Ravenscraig AI Data CentreApaturaMotherwellPlanned550
Humber Tech ParkHumber Tech ParkSouth KillingholmePlanned386 IT
Apatura ColdstreamApaturaColdstreamPlanned300
Apatura Larbert (Glenbervie)ApaturaLarbertPlanned300
SDC M40 Campus (Wapseys Wood)Slough Holdings UKGerrards CrossPlanned300 IT
Westerhill Data Centre CampusApaturaEast DunbartonshirePlanned300
Equinix Hertfordshire CampusEquinixSouth MimmsPlanned250

Every United Kingdom site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
London281152
Slough278150
Manchester941
Hayes8352
Hemel Hempstead5252
Reading4319
Harlow4118
Edinburgh427

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
Apatura7n/a2,100
Elsham Tech Park Ltd (Greystoke)1n/a1,000
QTS1n/a720
ILI Group1n/a600
Humber Tech Park1n/a386
Slough Holdings UK1n/a300
Equinix15n/a250
Virtus Data Centres1197145

Operators ranked by MW stated at their tracked sites in United Kingdom.

Power context

Rules in force

  • RegulationThe Infrastructure Planning (Business or Commercial Projects) (Amendment) Regulations 2026
  • IncentiveNorth East AI Growth Zone
  • PlanUK Compute Roadmap
  • GridCMP434 Final Decision (TMO4+ connections reform)
  • PlanAI Opportunities Action Plan and government response

From government sources. Power and policy in United Kingdom

Recent deals

  • Sep 2026 · FinancingNscale (AI cloud platform and data center operator), USD 3.4 bn
  • Sep 2026 · FinancingVIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough), USD 3.2 bn
  • Sep 2026 · Land / campus14MW of AI-ready capacity at Green Mountain LON-East campus, Romford, 14 MW
  • Aug 2026 · FinancingDataVita DV1 expansion and new DV3, North Lanarkshire AI Growth Zone, USD 406 m
  • Aug 2026 · Land / campusAI capacity at Vantage CWL1 campus, Newport (South Wales AI Growth Zone)
  • Aug 2026 · M&AAVK Power Solutions (UK data center power/microgrid provider), USD 1.0 bn

Deal Tracker

Other countries in Europe

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

United Kingdom in the full data pack

By year to 2035

Installed MW for United Kingdom from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does United Kingdom have?

We estimate about 1.9 GW of installed data center capacity (IT load) in United Kingdom at the end of 2025, about 12% of Europe and number 5 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in United Kingdom?

Our Data Center Tracker lists 181 sites in United Kingdom (130 operational, 7 under construction, 44 planned), run by 48 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in United Kingdom?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Apatura, Elsham Tech Park Ltd (Greystoke), QTS. Site capacity is counted only where a source states it.

What rules apply to data centers in United Kingdom?

Our Power and Policy Tracker lists 9 government measures in force for United Kingdom, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will United Kingdom data center capacity grow to 2035?

The full data pack gives installed capacity for United Kingdom by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.

Secure checkout

Data pack

Loading secure checkout