How much data center capacity Netherlands has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.

1.5 GWInstalled, end 2025IT load, DC Market Insights estimate
9%Share of Europe2025
#8Rank among 33 countriesInstalled capacity, 2025
110Sites in our tracker33 with a stated MW

Netherlands data center capacity at a glance

Netherlands had about 1.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 9% of the capacity in Europe and puts Netherlands at number 8 of the 33 countries in our global model. Our Data Center Tracker holds 110 sites in Netherlands run by 34 operators: 92 operational, 6 under construction and 12 planned. Our trackers also hold 6 verified deals and 12 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Netherlands

217 MWStated at operational sites (92)
186 MWUnder construction (6 sites)
263 MWPlanned (12 sites)
34Operators

Largest tracked sites

SiteOperatorCityStatusMW
AMS10EdgeConneXSchiphol-RijkUnder construction108
AMS CampusCloudHQHaarlemmermeerPlanned84 IT
Amsterdam Westpoort (AMS01)Pure DCAmsterdamUnder construction78
AMS19Digital RealtySchiphol-RijkPlanned70
AMS1CyrusOneOperational54 IT
AMS13EdgeConneXSchiphol-RijkPlanned54
Amsterdam campus (AMS01)EdgeConneXAmsterdamOperational40
AMS8Switch DatacentersMaasdijkPlanned35 IT
Amsterdam 1 (AMS1)NTT DATARozenburgOperational21 IT
AMS-2Iron MountainHaarlemPlanned20 IT

Every Netherlands site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Amsterdam271357
Schiphol-Rijk103n/a
Rotterdam648
Groningen548
Eemshaven42n/a
Middenmeer42n/a
Rozenburg3221
Haarlem3213

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
EdgeConneX440162
CloudHQ1n/a84
Pure DC1n/a78
Digital Realty13n/a70
NorthC1457n/a
CyrusOne154n/a
Switch Datacenters6n/a35
Iron Mountain21320

Operators ranked by MW stated at their tracked sites in Netherlands.

Power context

  • Grid emission factor, 20240.2 kgCO2/kWh · CBS
  • Industrial power price, 2025147.69 USD/MWh · Eurostat
  • Renewable share of electricity, 202549 % · CBS

Rules in force

  • RegulationCodebesluit operationalisering TDTR
  • RegulationCodebesluit prioriteringsruimte transportverzoeken 2025
  • GridWachtlijst TenneT, afname (november 2025)
  • GridWachtlijst regionale netbeheerders, afname (november 2025)
  • GridStand van de Uitvoering 2025: wachtlijsten netcongestie

From government sources. Power and policy in Netherlands

Recent deals

  • Nov 2026 · M&ASwitch Datacenters AMS2 facility, Woerden, 4 MW
  • Oct 2026 · FinancingNebius, data center development and GPU procurement, USD 3.5 bn
  • Oct 2026 · JV / partnershipVOLT Rotterdam AI Gigafactory (600MW, six buildings; phase 1 two 100MW buildings), 600 MW
  • Oct 2026 · FinancingSWI Group, USD 895 m
  • Jul 2026 · Land / campusNorthC Oude Meer and Maincubes Schiphol Rijk, 1 MW
  • Mar 2026 · FinancingSWI Group, USD 300 m

Deal Tracker

Other countries in Europe

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Netherlands in the full data pack

By year to 2035

Installed MW for Netherlands from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Netherlands have?

We estimate about 1.5 GW of installed data center capacity (IT load) in Netherlands at the end of 2025, about 9% of Europe and number 8 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Netherlands?

Our Data Center Tracker lists 110 sites in Netherlands (92 operational, 6 under construction, 12 planned), run by 34 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Netherlands?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are EdgeConneX, CloudHQ, Pure DC. Site capacity is counted only where a source states it.

What rules apply to data centers in Netherlands?

Our Power and Policy Tracker lists 12 government measures in force for Netherlands, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Netherlands data center capacity grow to 2035?

The full data pack gives installed capacity for Netherlands by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.