Netherlands Data Center Capacity

Installed data center capacity in Netherlands (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity Netherlands has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.

1.5 GWInstalled, end 2025IT load, DC Market Insights estimate
9%Share of Europe2025
#8Rank among 26 countriesInstalled capacity, 2025
100Sites in our tracker26 with a stated MW

Netherlands data center capacity at a glance

Netherlands had about 1.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 9% of the capacity in Europe and puts Netherlands at number 8 of the 26 countries in our global model. Our Data Center Tracker holds 100 sites in Netherlands run by 30 operators: 89 operational, 6 under construction and 5 planned. Our trackers also hold 4 verified deals and 7 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Netherlands

162 MWStated at operational sites (89)
88 MWUnder construction (6 sites)
0 MWPlanned (5 sites)
30Operators

Largest tracked sites

SiteOperatorCityStatusMW
Amsterdam Westpoort (AMS01)Pure DCAmsterdamUnder construction78
AMS1CyrusOneOperational54 IT
Amsterdam 1 (AMS1)NTT DATARozenburgOperational21 IT
NorthC AalsmeerNorthCAalsmeerOperational14
AMS-1Iron MountainHaarlemOperational13
NorthC AlmereNorthCAlmere StadOperational11
AMS-2Iron MountainHaarlemUnder construction10 IT
NorthC Rotterdam Zestienhoven 2NorthCRotterdamOperational6
AMS01maincubesAmsterdamOperational5 IT
nLighten Amsterdam (AMS2)nLightenAmsterdamOperational5

Every Netherlands site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Amsterdam261217
Schiphol-Rijk62n/a
Rotterdam538
Groningen548
Eemshaven42n/a
Middenmeer42n/a
Rozenburg3221
Haarlem3213

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
Pure DC1n/a78
NorthC1457n/a
CyrusOne154n/a
Iron Mountain21310
NTT DATA121n/a
nLighten26n/a
maincubes15n/a
QTS45n/a

Operators ranked by MW stated at their tracked sites in Netherlands.

Power context

  • Grid emission factor, 20240.2 kgCO2/kWh · CBS
  • Industrial power price, 2025147.69 USD/MWh · Eurostat
  • Renewable share of electricity, 202549 % · CBS

Rules in force

  • GridStand van de Uitvoering 2025: wachtlijsten netcongestie
  • MoratoriumGeactualiseerde Datacenterstrategie Noord-Holland 2025-2027
  • EfficiencyRapportageplicht datacentra (EED artikel 12, Gedelegeerde Verordening (EU) 2024/1364)
  • RestrictionBesluit van 20 december 2023 houdende wijziging van Besluit kwaliteit leefomgeving in verband met een instructieregel voor hyperscale datacentra
  • EfficiencyEnergiebesparingsplicht en informatieplicht voor datacenters

From government sources. Power and policy in Netherlands

Recent deals

  • Oct 2026 · JV / partnershipVOLT Rotterdam AI Gigafactory (600MW, six buildings; phase 1 two 100MW buildings), 600 MW
  • Oct 2026 · FinancingSWI Group, USD 895 m
  • Jul 2026 · Land / campusNorthC Oude Meer and Maincubes Schiphol Rijk, 1 MW
  • Mar 2026 · FinancingSWI Group, USD 300 m

Deal Tracker

Other countries in Europe

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Netherlands in the full data pack

By year to 2035

Installed MW for Netherlands from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Netherlands have?

We estimate about 1.5 GW of installed data center capacity (IT load) in Netherlands at the end of 2025, about 9% of Europe and number 8 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Netherlands?

Our Data Center Tracker lists 100 sites in Netherlands (89 operational, 6 under construction, 5 planned), run by 30 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Netherlands?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Pure DC, NorthC, CyrusOne. Site capacity is counted only where a source states it.

What rules apply to data centers in Netherlands?

Our Power and Policy Tracker lists 7 government measures in force for Netherlands, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Netherlands data center capacity grow to 2035?

The full data pack gives installed capacity for Netherlands by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.

Secure checkout

Data pack

Loading secure checkout