Forecast 2026-2035

Data Center Investment Market Size, Share & Forecast to 2035

Market at a glance

The Data Center Investment market was worth USD 177.57 billion in 2025 and is forecast to reach USD 534.01 billion by 2035, growing at a 11.64% CAGR.

$177.57BMarket size, 2025
$534.01BForecast, 2035
11.64%CAGR, 2025-2035
$63.84BMarket size, 2020
Market size, USD million
63,840.0 2020 177,570.0 2025 534,010.0 2035F

Key findings

Driver

Hyperscaler Capex Passes USD 350 Billion and Pulls Shell Construction With It

Trend

Platform Take-Privates Replace Single-Asset Sales

Opportunity

Stabilised Hyperscale Shells for Long-Term Investors: USD 188.47 billion of Deals by 2035

What is inside the report

  1. 01Introduction
  2. 02Executive Summary
  3. 03Market Scope and Estimate Comparison
  4. 04Market Dynamics
  5. 05Pricing Analysis
  6. 06Standards and Regulation
  7. 07Market Segmentation by Investment Type
  8. 08Market Segmentation by Investor Type
  9. 09Market Segmentation by Asset Class
  10. 10DC Exclusive: Data Center Capital Deal Ledger
  • 16chapters
  • 2020-2024Historical period
  • 2026-2035Forecast period
  • —Companies profiled

Full table of contents

Segmentation

Investment Type
Greenfield Campus DevelopmentCampus Expansion and Fit-OutPlatform and Asset Acquisitions
Investor Type
Hyperscale Cloud and AI CompaniesColocation and Wholesale OperatorsInfrastructure and Private Equity FundsSovereign Wealth and Pension FundsTelecom and Enterprise Owners
Asset Class
Hyperscale and AI CampusesWholesale ColocationRetail ColocationEdge and Enterprise Sites

Recent developments

November 2026

Blackstone Digital Infrastructure Trust agreed to buy 75% of two AWS powered-shell joint ventures for about USD 5 billion at a 7.0% cap rate (Source: Blackstone Digital Infrastructure Trust).

November 2026

the U.S. Census Bureau reported private data center construction at a seasonally adjusted annual rate of USD 96.5 billion for September 2026 (Source: U.S. Census Bureau).

September 2026

SoftBank Group completed its acquisition of DigitalBridge (Source: SoftBank Group).

July 2026

the purchase of Aligned Data Centers at about USD 40 billion closed, with USD 5 billion of growth capital committed (Source: Aligned Data Centers).

June 2026

Alphabet completed a USD 84.75 billion equity raise for AI infrastructure and compute (Source: Alphabet).

February 2026

CPP Investments and Equinix agreed to buy atNorth at a USD 4 billion enterprise value (Source: Equinix).

Full analysis

The Data Center Investment Market is valued at USD 219.24 billion in 2026 and is projected to reach USD 534.01 billion by 2035, up from USD 177.57 billion in 2025, a CAGR of 11.64% from 2025 to 2035 (DC Market Insights estimate). Money in this market is set by the price of a powered megawatt (MW), not by rent rolls: in 2025 owners paid about USD 10.50 million per MW of new IT load for land, powered shell, electrical and cooling plant and fit-out, and an investor consortium of the AI Infrastructure Partnership, MGX and Global Infrastructure Partners closed the purchase of Aligned Data Centers at an enterprise value of about USD 40 billion for more than 6.4 gigawatts (GW) of capacity (Aligned Data Centers, 21 July 2026). The 2025 receipt is 12.0 GW of new IT capacity x USD 10.50 million per MW = USD 126.00 billion of development investment, plus USD 51.57 billion of acquisitions, equal to 12% of an operating third-party portfolio worth USD 429.74 billion. Platform and asset acquisitions are the fastest investment type at 13.84% a year as pension and sovereign funds buy stabilised campuses, and the Middle East and Africa is the fastest region at 14.90%.

Key Market Statistics: How Big Is the Data Center Investment Market in 2026?

DC Market Insights values capital invested in data center real assets at USD 219.24 billion in 2026, 23.47% above 2025, because new IT capacity started rises from 12.0 GW to 15.0 GW in one year.

  • Data center investment market size 2025: USD 177.57 billion
  • Market size 2026: USD 219.24 billion
  • Market size 2030: USD 369.06 billion
  • Market size 2035: USD 534.01 billion
  • CAGR 2025-2035: 11.64% (low case 9.45%, high case 13.60%)
  • Largest investment type: greenfield campus development, USD 78.12 billion or 44.0% of 2025 value
  • Fastest investment type: platform and asset acquisitions, 13.84% a year to USD 188.47 billion by 2035
  • Largest investor type: hyperscale cloud and AI companies, USD 78.13 billion in 2025; fastest: sovereign wealth and pension funds at 13.90%
  • Leading region: North America, USD 85.23 billion or 48.0% of 2025 value; fastest region: Middle East and Africa at 14.90%
  • Largest country: United States, USD 77.24 billion in 2025; fastest large country: India at 17.58%
  • Most active capital sources: Microsoft, Amazon, Alphabet, Meta and Oracle in self-build; Blackstone, Brookfield, BlackRock’s Global Infrastructure Partners, KKR, CPP Investments and GIC in third-party platforms (DC Market Insights assessment)

Key Takeaways: What Should Data Center Investors Know for 2026?

  • Development spending is 71% of 2025 investment because each new MW costs about USD 10.50 million before a single server is installed.
  • Acquisition value rises 3.7 times by 2035 because the operating third-party portfolio grows from USD 430 billion to USD 1.71 trillion and funds recycle stabilised assets.
  • Hyperscale and AI campuses take 64% of 2035 value, against 55% in 2025, because campuses of 200 MW and more now anchor most new capital.
  • Off-balance-sheet structures are growing because Meta, Microsoft and Amazon now lease or co-own shells funded by outside capital, as the 80/20 Hyperion joint venture shows.

Executive Summary: Data Center Investment Market Size, 2020-2035

The Global Data Center Investment Market size was valued at USD 63.84 billion in 2020, reached USD 177.57 billion in 2025, and is anticipated to reach USD 534.01 billion by 2035, at a CAGR of 11.64% during the forecast period.

Attribute Detail
Historical period 2020-2024
Base year 2025
Forecast period 2026-2035
Market size 2025 USD 177.57 billion
Market size 2026 USD 219.24 billion
CAGR 2025-2035 11.64%
Market size 2035 USD 534.01 billion
Unit USD million, nominal

The Data Center Investment Market grew 22.70% a year from 2020 to 2025 as new IT capacity started each year more than doubled from 5.5 GW to 12.0 GW and the cost of a finished MW rose from USD 8.63 million to USD 10.50 million. Growth slows to 11.64% a year to 2035 because new capacity flattens near 27 GW a year after 2030, while acquisitions keep compounding on a larger operating base.

Data Center Investment Market size 2020-2035: USD 63.84 billion in 2020, USD 177.57 billion in 2025 and USD 534.01 billion by 2035, a CAGR of 11.64% from 2025 (DC Market Insights)

What Counts as Data Center Investment in This Market?

The Data Center Investment Market counts USD 177.57 billion of capital committed in 2025 to data center real assets, split between new development and the purchase of operating platforms.

Included: land and powered land, shell and core, electrical plant (substations, switchgear, uninterruptible power supply, generators), mechanical and cooling plant, white-space fit-out, and the enterprise value of acquisitions and take-privates of data center operators, campuses and powered shells. Joint-venture and fund equity counts once, at the asset it buys.

Excluded: servers, storage, networking and graphics processing unit (GPU) systems; electricity bills; leasing revenue and rent; venture rounds in GPU cloud companies; and announced multi-year programmes until the money is spent on a site. Pledges such as the USD 500 billion Stargate commitment enter the model only as campuses are built.

How the segments fit together: investment type, investor type and asset class each split the same total; regions and the top 12 countries add up to the same figure every year. The Data Center Real Estate Market counts only land, shell and site works (USD 40.33 billion in 2025), while this report adds electrical and mechanical fit-out and acquisitions.

Why Do Data Center Investment Estimates Differ?

The DC Market Insights figure of USD 219.24 billion for 2026 counts real-asset capital only; estimates that add servers and GPUs or full hyperscaler capital expenditure (capex) are two to four times larger.

Broader definitions add three things. First, IT equipment: Microsoft’s own fixed-asset table shows servers and network equipment at USD 215.9 billion gross against USD 193.2 billion for land and buildings, so whole-capex figures roughly double the real-asset number. Second, announced programmes: Stargate’s USD 500 billion and the European Union’s EUR 200 billion InvestAI plan are commitments over several years, not spending in one year. Third, debt refinancing and asset-backed securities, which recycle capital already counted when the asset was built. Small and mid-sized buyers such as regional colocation firms and enterprise owners stay in scope through the edge and enterprise sites class.

Element In this report Why
Land, shell, electrical and cooling plant Yes, USD 126.00 billion in 2025 Real-asset capital at cost
Acquisitions of operators and campuses Yes, USD 51.57 billion in 2025 Enterprise value at signing year
Servers, storage, network and GPU systems No Counted in IT hardware markets
Multi-year pledges (Stargate, InvestAI) Only as built Avoids counting one MW twice
Rent and leasing revenue No Income, not investment

Market Drivers: Why Is Capital Pouring Into Data Center Assets?

Three forces lift data center investment from USD 177.57 billion in 2025 to USD 369.06 billion in 2030: hyperscaler build programmes, off-balance-sheet joint ventures and a deeper buyer pool for stabilised assets.

Hyperscaler Capex Passes USD 350 Billion and Pulls Shell Construction With It

Amazon spent USD 128.3 billion on cash capex in 2025 and guides to about USD 220 billion for 2026, according to its third-quarter 2026 results; Alphabet spent USD 91.4 billion in 2025 and Meta USD 72.22 billion, according to their annual reports on Form 10-K. In the United States the effect is visible in official statistics: private data center construction put in place rose from USD 34.8 billion in 2024 to USD 49.7 billion in 2025 and reached a seasonally adjusted annual rate of USD 96.5 billion in September 2026 (preliminary), according to the U.S. Census Bureau construction spending tables. DC Market Insights estimates that hyperscale cloud and AI companies invested USD 78.13 billion in real assets in 2025, 44% of the market.

Joint Ventures Move USD 27 Billion Campuses Off Corporate Balance Sheets

Meta formed a joint venture in which funds managed by Blue Owl Capital own 80% and Meta 20% to fund about USD 27 billion of development costs at the Hyperion campus in Louisiana (Meta, 21 October 2025). Equinix, GIC and CPP Investments set up an xScale joint venture in October 2024 to raise over USD 15 billion for more than 1.5 GW of United States hyperscale capacity, according to an Equinix filing. These structures let pension and infrastructure capital finance 21% of 2025 investment through infrastructure and private equity funds (USD 37.29 billion, DC Market Insights estimate).

Stabilised Campuses Trade at a 7.0% Cap Rate as Listed Vehicles Join the Buyer Pool

Blackstone Digital Infrastructure Trust agreed in November 2026 to buy 75% of two Amazon Web Services joint ventures that own 13 powered shells, for about USD 5 billion at an initial capitalisation rate of 7.0% with 12-year leasebacks (Blackstone Digital Infrastructure Trust filing, 16 November 2026). A listed buyer for leased shells widens exit routes for developers, and DC Market Insights models acquisitions at 11% of the operating third-party portfolio each year after 2025, giving USD 107.70 billion of deals in 2030.

Data center investment is shifting toward larger tickets: deals above USD 4 billion made up at least USD 44 billion of 2025 acquisition value, 85% of the USD 51.57 billion modelled.

Platform Take-Privates Replace Single-Asset Sales

SoftBank Group agreed on 29 December 2025 to buy DigitalBridge, an investment manager with USD 108 billion of infrastructure assets, at an enterprise value of about USD 4.0 billion and completed the deal on 30 September 2026, according to SoftBank. CPP Investments (about 60%) and Equinix (about 40%) agreed in February 2026 to buy Nordic operator atNorth at a USD 4 billion enterprise value with 1 GW of secured power, according to an Equinix filing. Buyers now pay for powered land and pipeline, not only for leased MW.

Securitisation Recycles Capital Into New Builds

Aligned Data Centers completed a USD 1.183 billion asset-backed securities issue in July 2026, upsized about 30% from a USD 905 million target and secured by four campuses with more than 90% of rent from investment-grade tenants, according to Aligned. Each refinancing frees equity for the next campus; DC Market Insights counts the campus once, at build cost, and excludes the bond.

Sovereign and Gulf Capital Takes Direct Stakes

MGX of Abu Dhabi co-led the Aligned purchase, and GIC and the Abu Dhabi Investment Authority (ADIA) put USD 1.6 billion into the Asia-Pacific platform of Vantage Data Centers in September 2025 to fund a 300 MW Johor campus, according to GIC. Sovereign wealth and pension funds grow fastest among investor types at 13.90% a year, from USD 15.98 billion in 2025 to USD 58.74 billion by 2035 (DC Market Insights estimate).

Market Challenges and Restraints: What Could Slow Data Center Investment?

Power access and the cost of capital are the two limits that cut the 2035 low case to USD 437.89 billion, 18% below the base case.

Grid Queues Delay the Start of Committed Capital

A campus cannot draw its full budget until the utility energises it, so committed money waits. Meta reported about USD 103.77 billion of leases not yet commenced at 31 December 2025, mostly for data centers, and Microsoft reported USD 329.1 billion, according to their 10-K filings. DC Market Insights treats these as a pipeline and counts the money only in the year construction is put in place, which keeps 2026 development at USD 161.43 billion.

Higher Cap Rates Cut Acquisition Values

Each 50 basis-point rise in the capitalisation rate on a 7.0% asset lowers its value by about 6.7%. If cap rates rose by 100 basis points, acquisition value in 2030 would fall by about USD 13 billion, to USD 94 billion, and the model would move toward the low case (DC Market Insights estimate). A deal can also fail at the vote: CoreWeave’s all-stock offer for Core Scientific was terminated in October 2025 after Core Scientific stockholders rejected it, according to CoreWeave.

Market Opportunities: Where Will the Next USD 350 Billion Go?

The Data Center Investment Market adds USD 356.44 billion of yearly investment between 2025 and 2035; two pools stand out.

Stabilised Hyperscale Shells for Long-Term Investors: USD 188.47 billion of Deals by 2035

Leased powered shells with 12-to-15-year hyperscaler leases suit pension funds that want inflation-linked income. Acquisition value grows from USD 51.57 billion in 2025 to USD 188.47 billion by 2035, as the operating third-party portfolio reaches USD 1.71 trillion (DC Market Insights estimate).

Gulf and Indian Campuses: USD 52.33 Billion of Yearly Investment by 2035

Saudi Arabia, the United Arab Emirates and India together grow from USD 11.19 billion in 2025 to USD 52.33 billion by 2035, with India the fastest large country at 17.58% a year. Sovereign funds in the Gulf invest at home and abroad, and the European Commission’s InvestAI plan aims to mobilise EUR 200 billion, including EUR 20 billion for AI gigafactories (European Commission, 11 February 2025).

How Much Does a Megawatt of Data Center Capacity Cost to Build or Buy?

DC Market Insights estimates the development cost of a finished data center at USD 10.50 million per MW of IT load in 2025, rising to USD 12.80 million by 2035; servers are excluded.

Year Development cost per MW (USD million) New IT capacity started (GW) Development investment (USD billion)
2020 8.63 5.5 47.47
2025 10.50 12.0 126.00
2030 11.88 22.0 261.36
2035 12.80 27.0 345.55

Public anchors from transactions: the Aligned purchase valued about 6.4 GW of operating and planned capacity at USD 40 billion, about USD 6.25 million per MW including undeveloped pipeline; atNorth’s USD 4 billion for 1 GW of secured power is about USD 4.0 million per MW; and the AWS shell stakes were priced at a 7.0% initial capitalisation rate. Land, shell and site works make up USD 2.95 million of the USD 10.50 million, and electrical and cooling plant with fit-out the remaining USD 7.55 million (DC Market Insights estimate).

Which Rules Shape Data Center Investment?

Rules change the timing of an estimated USD 126.00 billion of yearly development capital by deciding where and when power can be connected.

  • European Union Energy Efficiency Directive (EU) 2023/1791 requires data centers of 500 kilowatts or more to report energy and water performance to a European database from 2024, which lenders now read in due diligence (Source: European Commission).
  • The European Commission InvestAI initiative of February 2025 targets EUR 200 billion of AI investment, including EUR 20 billion for AI gigafactories (Source: European Commission).
  • United States foreign investment review by the Committee on Foreign Investment in the United States (CFIUS) covers acquisitions of critical infrastructure, which shapes how Gulf and Asian funds structure stakes (Source: U.S. Department of the Treasury).
  • Zoning and special-exception rules in Loudoun County, Virginia, apply to new data center applications since March 2025 (Source: Loudoun County).

Data Center Investment Market Segmentation: Where Does the Money Go?

Greenfield campus development is the largest investment type at USD 78.12 billion in 2025, and hyperscale and AI campuses are the largest asset class at USD 97.66 billion.

By Investment Type

Investment Type 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Greenfield Campus Development 78,120.00 44.0% 228,060.36 11.31%
Platform and Asset Acquisitions 51,568.65 29.0% 188,466.55 13.84%
Campus Expansion and Fit-Out 47,880.00 27.0% 117,485.64 9.39%
Total 177,568.65 100.0% 534,012.55 11.64%

By Investor Type

Investor Type 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Hyperscale Cloud and AI Companies 78,130.21 44.0% 245,645.77 12.14%
Infrastructure and Private Equity Funds 37,289.42 21.0% 112,142.64 11.64%
Colocation and Wholesale Operators 35,513.73 20.0% 90,782.13 9.84%
Sovereign Wealth and Pension Funds 15,981.18 9.0% 58,741.38 13.90%
Telecom and Enterprise Owners 10,654.12 6.0% 26,700.63 9.62%
Total 177,568.65 100.0% 534,012.55 11.64%

By Asset Class

Asset Class 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Hyperscale and AI Campuses 97,662.76 55.0% 341,768.03 13.34%
Wholesale Colocation 39,065.10 22.0% 101,462.38 10.01%
Retail Colocation 23,083.92 13.0% 53,401.26 8.75%
Edge and Enterprise Sites 17,756.87 10.0% 37,380.88 7.73%
Total 177,568.65 100.0% 534,012.55 11.64%

DC Exclusive: Data Center Capital Deal Ledger, 12 Transactions, 2024-2026

The DC Market Insights Capital Deal Ledger is a DC Market Insights model built on 12 inputs: the largest data center acquisitions, joint ventures, fund closes and financings announced in company filings and official releases since 2024, with the value each puts at work and the capacity behind it. Acquisitions in the ledger add up to more than USD 53 billion in disclosed value, and two development joint ventures alone commit USD 42 billion.

Date Asset or vehicle Investors Type Value (USD million) Capacity
Jul 2026 (closed) Aligned Data Centers AI Infrastructure Partnership, MGX, Global Infrastructure Partners Acquisition 40,000 6.4 GW
Nov 2026 Two AWS powered-shell ventures (75%) Blackstone Digital Infrastructure Trust Acquisition 5,000 13 shells
Oct 2025 Hyperion campus joint venture Blue Owl funds (80%), Meta (20%) Development JV 27,000 n/d
Sep 2026 (closed) DigitalBridge SoftBank Group Platform take-private 4,000 n/a
Feb 2026 atNorth CPP Investments, Equinix Acquisition 4,000 1 GW
Oct 2024 Equinix xScale US joint venture Equinix, GIC, CPP Investments Development JV 15,000 1.5 GW
Sep 2024 AirTrunk Blackstone, CPP Investments Acquisition AUD 24 bn+ n/d
Sep 2025 Vantage Data Centers Asia Pacific GIC affiliate, ADIA Equity raise 1,600 300 MW Johor
Mar 2026 Digital Realty US Hyperscale Data Center Fund Institutional investors Fund close 3,250 n/d
Nov 2025 Brookfield AI Infrastructure Fund Brookfield, NVIDIA, Kuwait Investment Authority Fund launch 10,000 target n/d
Jul 2026 Aligned asset-backed securities Bond investors Refinancing 1,183 4 campuses
Feb 2025 InvestAI AI gigafactories fund European Union Public programme EUR 20 bn n/d

Reading the ledger: per-MW prices fall as deals include more unbuilt pipeline (USD 6.25 million per MW for Aligned, USD 4.0 million for atNorth’s secured power), while leased shells sell on yield (7.0%). Development joint ventures now rival acquisitions in size, which is why DC Market Insights counts joint-venture equity at the asset rather than at the fund.

Which Region Attracts the Most Data Center Investment?

North America leads with USD 85.23 billion or 48.0% of 2025 investment, and the Middle East and Africa grows fastest at 14.90% a year.

Region 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
North America 85,232.95 48.0% 234,965.52 10.67%
Europe 31,962.36 18.0% 82,771.95 9.98%
Asia Pacific 42,616.48 24.0% 149,523.51 13.37%
Latin America 7,102.75 4.0% 24,030.56 12.96%
Middle East and Africa 10,654.12 6.0% 42,721.00 14.90%
Total 177,568.65 100.0% 534,012.55 11.64%

North America

Northern Virginia, Texas, Ohio and Louisiana carry most United States development; private data center construction reached USD 49.7 billion in 2025 according to the U.S. Census Bureau, and North America grows 10.67% a year to USD 234.97 billion by 2035.

Europe

Europe invests USD 31.96 billion in 2025, led by the United Kingdom and Germany, and Nordic power draws buyers such as CPP Investments and Equinix to atNorth; it grows 9.98% a year to USD 82.77 billion.

Asia Pacific

Asia Pacific grows 13.37% a year from USD 42.62 billion to USD 149.52 billion, led by China, Japan, India, Australia and Malaysia, where Vantage’s 300 MW Johor campus is funded by GIC and ADIA.

Latin America

Latin America invests USD 7.10 billion in 2025, mostly in São Paulo and Querétaro, and grows 12.96% a year to USD 24.03 billion.

Middle East and Africa

The Middle East and Africa grows fastest at 14.90% a year, from USD 10.65 billion to USD 42.72 billion, as Saudi Arabia and the United Arab Emirates fund AI campuses at home.

Top 12 Countries for Data Center Investment

The United States leads with USD 77.24 billion in 2025, and India is the fastest large country at 17.58% a year.

Rank Country Region 2025 (USD million) 2035 (USD million) CAGR 2025-2035
1 United States North America 77,242.36 210,934.96 10.57%
2 China Asia Pacific 15,093.34 48,061.13 12.28%
3 Canada North America 7,990.59 24,030.56 11.64%
4 Japan Asia Pacific 6,214.90 18,690.44 11.64%
5 United Kingdom Europe 6,214.90 14,952.35 9.18%
6 Germany Europe 5,327.06 13,884.33 10.05%
7 India Asia Pacific 4,439.22 22,428.53 17.58%
8 Australia Asia Pacific 4,439.22 13,884.33 12.08%
9 Saudi Arabia Middle East and Africa 3,551.37 16,020.38 16.26%
10 Malaysia Asia Pacific 3,551.37 11,748.28 12.71%
11 Brazil Latin America 3,551.37 11,748.28 12.71%
12 United Arab Emirates Middle East and Africa 3,196.24 13,884.33 15.82%

The 12 countries hold 79.3% of 2025 investment; the rest of the world makes up the remainder within each regional total.

Forecast Scenarios: How Large Could Data Center Investment Be in 2035?

The base case puts the Data Center Investment Market at USD 534.01 billion in 2035, inside a range of USD 437.89 billion to USD 635.47 billion.

Scenario 2035 (USD million) CAGR 2025-2035 Assumption
Low 437,890.29 9.45% Grid delays hold new capacity near 22 GW a year; cap rates rise 100 basis points
Base 534,012.55 11.64% 27 GW a year by 2035; acquisitions at 11% of the operating portfolio
High 635,474.93 13.60% United States construction stays near the USD 96.5 billion rate of September 2026; more Gulf capital

Low Scenario

New IT capacity stalls near 22 GW a year after 2030 and acquisition value falls with higher cap rates, giving USD 437.89 billion in 2035.

Base Scenario

New capacity reaches 27 GW a year and the cost per MW rises 1.5% a year after 2030, giving USD 534.01 billion in 2035.

High Scenario

Construction keeps the pace of 2026 and sovereign funds deploy faster, giving USD 635.47 billion in 2035.

Key Players and Market Share: Who Invests in Data Centers?

DC Market Insights estimates that the ten largest capital sources placed about 46% of 2025 data center investment, based on self-build capex shares of the five largest hyperscalers and disclosed deal values of the largest funds.

  • Microsoft
  • Amazon (Amazon Web Services)
  • Alphabet (Google)
  • Meta Platforms
  • Oracle
  • Blackstone
  • Brookfield Asset Management
  • BlackRock (Global Infrastructure Partners)
  • MGX
  • KKR
  • CPP Investments
  • GIC
  • Blue Owl Capital
  • Equinix
  • Digital Realty
  • SoftBank Group (DigitalBridge)

Investor Facts, 2024-2026

Microsoft added USD 115.9 billion of property and equipment in the year to June 2026 and reported USD 34.6 billion committed for new buildings, primarily data centers, according to its 10-K. Oracle’s capex reached USD 55.7 billion in the year to May 2026 and USD 28.5 billion in the quarter to August 2026, according to Oracle. Alphabet raised USD 84.75 billion of equity in June 2026 to expand AI infrastructure and compute, according to an Alphabet filing. Brookfield launched a USD 100 billion AI infrastructure programme in November 2025, anchored by a fund with USD 5 billion of commitments, according to Brookfield. Digital Realty closed its US Hyperscale Data Center Fund at USD 3.25 billion of equity in March 2026, according to Digital Realty.

For the operators that receive this capital, see the Wholesale Colocation Market and the global Data Center Market; materials demand from each MW built is covered in the Data Center Construction Materials Supply Chain Market.

Recent Developments in the Data Center Investment Market

  • In November 2026, Blackstone Digital Infrastructure Trust agreed to buy 75% of two AWS powered-shell joint ventures for about USD 5 billion at a 7.0% cap rate (Source: Blackstone Digital Infrastructure Trust).
  • In November 2026, the U.S. Census Bureau reported private data center construction at a seasonally adjusted annual rate of USD 96.5 billion for September 2026 (Source: U.S. Census Bureau).
  • In September 2026, SoftBank Group completed its acquisition of DigitalBridge (Source: SoftBank Group).
  • In July 2026, the purchase of Aligned Data Centers at about USD 40 billion closed, with USD 5 billion of growth capital committed (Source: Aligned Data Centers).
  • In June 2026, Alphabet completed a USD 84.75 billion equity raise for AI infrastructure and compute (Source: Alphabet).
  • In February 2026, CPP Investments and Equinix agreed to buy atNorth at a USD 4 billion enterprise value (Source: Equinix).

Research Methodology: How DC Market Insights Sized the Data Center Investment Market

DC Market Insights sized the Data Center Investment Market bottom-up from capacity and asset values, not from deal counts; see our research methodology.

Model Inputs

Development investment = new IT capacity started (5.5 GW in 2020, 12.0 GW in 2025, 22 GW in 2030, 27 GW in 2035) x development cost per MW (USD 8.63 million in 2020, USD 10.50 million in 2025, USD 11.88 million in 2030, USD 12.80 million in 2035) = USD 126.00 billion in 2025. Acquisition value = installed IT capacity (107 GW in 2025, 315 GW in 2035) x third-party share (45% to 50%) x replacement cost per MW x 0.85 depreciation factor x yearly turnover (12% in 2025, 11% after) = USD 51.57 billion in 2025. Regions and countries are split by each market’s share of new capacity and deal value; every split sums to the total each year.

Bound Checks

  • Ceiling 1: hyperscale cloud and AI companies’ real-asset investment of USD 78.13 billion in 2025 is below the land-and-buildings share (about 47%, from Microsoft’s fixed-asset table) of the five largest hyperscalers’ 2025 capex of about USD 357 billion, or about USD 168 billion.
  • Ceiling 2: modelled United States development of about USD 54.81 billion in 2025 sits close to, and only above by the value of land and owner-installed plant, the USD 49.7 billion of private data center construction reported by the U.S. Census Bureau.
  • Floor: two named 2025 deals (Aligned at USD 40 billion and DigitalBridge at USD 4.0 billion) add up to USD 44 billion, below the USD 51.57 billion of modelled 2025 acquisitions.

Table of contents

  • 16 chapters
  • 1 figures
  • 10 data tables
  1. 01Introduction
    • 1.1Report Description
    • 1.2Market Definition and Scope
    • 1.3Research Methodology
  2. 02Executive Summary
    • 2.1Market Snapshot, 2025, 2026 and 2035
    • 2.2Key Market Statistics
    • 2.3Key Takeaways
  3. 03Market Scope and Estimate Comparison
    • 3.1Included and Excluded
    • 3.2Why Estimates Differ
  4. 04Market Dynamics
    • 4.1Hyperscaler Capex and Shell Construction
    • 4.2Joint Ventures Off Corporate Balance Sheets
    • 4.3Stabilised Campuses at a 7.0% Cap Rate
    • 4.4Platform Take-Privates
    • 4.5Securitisation of Campuses
    • 4.6Sovereign and Gulf Capital
    • 4.7Grid Queues and Uncommenced Leases
    • 4.8Cap Rates and Acquisition Values
    • 4.9Stabilised Hyperscale Shells
    • 4.10Gulf and Indian Campuses
  5. 05Pricing Analysis
    • 5.1Development Cost per MW, 2020-2035
    • 5.2Transaction Price Anchors
  6. 06Standards and Regulation
    • 6.1EU Energy Efficiency Directive
    • 6.2EU InvestAI Initiative
    • 6.3CFIUS Foreign Investment Review
    • 6.4Loudoun County Zoning Rules
  7. 07Market Segmentation by Investment Type
    • 7.1Greenfield Campus Development
    • 7.2Campus Expansion and Fit-Out
    • 7.3Platform and Asset Acquisitions
  8. 08Market Segmentation by Investor Type
    • 8.1Hyperscale Cloud and AI Companies
    • 8.2Colocation and Wholesale Operators
    • 8.3Infrastructure and Private Equity Funds
    • 8.4Sovereign Wealth and Pension Funds
    • 8.5Telecom and Enterprise Owners
  9. 09Market Segmentation by Asset Class
    • 9.1Hyperscale and AI Campuses
    • 9.2Wholesale Colocation
    • 9.3Retail Colocation
    • 9.4Edge and Enterprise Sites
  10. 10DC Exclusive: Data Center Capital Deal Ledger
    • 10.112 Transactions, 2024-2026
    • 10.2Per-MW Prices and Yields
  11. 11Regional Analysis
    • 11.1North America
    • 11.2Europe
    • 11.3Asia Pacific
    • 11.4Latin America
    • 11.5Middle East and Africa
  12. 12Country Analysis
    • 12.1United States
    • 12.2China
    • 12.3Canada
    • 12.4Japan
    • 12.5United Kingdom
    • 12.6Germany
    • 12.7India
    • 12.8Australia
    • 12.9Saudi Arabia
    • 12.10Malaysia
    • 12.11Brazil
    • 12.12United Arab Emirates
  13. 13Forecast Scenarios
    • 13.1Low Scenario
    • 13.2Base Scenario
    • 13.3High Scenario
  14. 14Competitive Insights
    • 14.1Microsoft
    • 14.2Amazon (Amazon Web Services)
    • 14.3Alphabet (Google)
    • 14.4Meta Platforms
    • 14.5Oracle
    • 14.6Blackstone
    • 14.7Brookfield Asset Management
    • 14.8BlackRock (Global Infrastructure Partners)
    • 14.9MGX
    • 14.10KKR
    • 14.11CPP Investments
    • 14.12GIC
    • 14.13Blue Owl Capital
    • 14.14Equinix
    • 14.15Digital Realty
    • 14.16SoftBank Group (DigitalBridge)
  15. 15Recent Developments
    • 15.1Developments, 2026
  16. 16Research Methodology
    • 16.1Model Inputs
    • 16.2Bound Checks
  1. Fig. 1Data Center Investment Market Size, 2020-2035
  1. Table 1Market Attributes
  2. Table 2Estimate Scope Comparison
  3. Table 3Development Cost per MW, 2020-2035
  4. Table 4Market by Investment Type
  5. Table 5Market by Investor Type
  6. Table 6Market by Asset Class
  7. Table 7Data Center Capital Deal Ledger
  8. Table 8Market by Region
  9. Table 9Top 12 Countries
  10. Table 10Forecast Scenarios, 2035

About this report

Amit JainDeepti Agrawal

Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.

Read our methodology

How we built this

  • Historical period2020-2024
  • Base year2025
  • Forecast period2026-2035
  • Sizing approachTop-down + bottom-up

Need more than the report?

Advisory on this market

Due diligence, site selection and market entry work, by the analysts who wrote this report.

See consulting services

Frequently asked questions

What is the size of the Data Center Investment Market in 2026?

USD 219.24 billion in 2026, up 23.47% from USD 177.57 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 534.01 billion by 2035, a CAGR of 11.64% from 2025.

How fast is data center investment growing?

11.64% a year from 2025 to 2035, after 22.70% a year from 2020 to 2025, as new IT capacity started each year rises from 12.0 GW to 27 GW and acquisition value grows 3.7 times.

What counts as data center investment?

USD 177.57 billion was committed in 2025 to data center real assets: USD 126.00 billion of development (land, shell, electrical and cooling plant, fit-out) and USD 51.57 billion of acquisitions. Servers, GPUs, rent and electricity are excluded.

How much does it cost to build a data center per MW?

USD 10.50 million per MW of IT load in 2025, excluding servers, DC Market Insights estimates: USD 2.95 million for land, shell and site works and USD 7.55 million for electrical and cooling plant and fit-out. It rises to USD 12.80 million by 2035.

What was the largest data center acquisition?

USD 40 billion of enterprise value for Aligned Data Centers, bought by the AI Infrastructure Partnership, MGX and Global Infrastructure Partners and closed on 21 July 2026, with more than 6.4 GW of capacity, according to Aligned.

Which type of data center investment grows fastest?

Platform and asset acquisitions grow fastest at 13.84% a year, from USD 51.57 billion in 2025 to USD 188.47 billion by 2035. Among investors, sovereign wealth and pension funds lead at 13.90% a year.

Which region attracts the most data center investment?

North America, with USD 85.23 billion or 48.0% of 2025 investment. The Middle East and Africa grows fastest at 14.90% a year, and India is the fastest large country at 17.58%.

Who invests the most in data centers?

Hyperscale cloud and AI companies, with USD 78.13 billion or 44% of 2025 real-asset investment. Infrastructure and private equity funds such as Blackstone, Brookfield and Global Infrastructure Partners follow with USD 37.29 billion (DC Market Insights estimate).

What cap rate do data center assets trade at?

7.0% initial capitalisation rate on the November 2026 purchase of 75% of two AWS powered-shell ventures by Blackstone Digital Infrastructure Trust, a deal of about USD 5 billion with 12-year leasebacks.

Why do data center investment estimates differ?

USD 219.24 billion in 2026 counts only real-asset capital. Estimates that add servers and GPUs, full hyperscaler capex or multi-year pledges such as Stargate’s USD 500 billion come out two to four times larger.

Get this report

How do I get the full report?

Request a quote; we reply by email within one business day.

How and when will I receive the report?

By email, within 24-48 business hours of payment.

How can I pay?

Once you accept the quote, we email you a secure payment link.

Can I see a sample first?

Yes. Request a free sample and we will email it to you.

Can the report be tailored to my needs?

Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.

Can I get an invoice or pay against a purchase order?

Write to sales@dcmarketinsights.com and our team will help.

Refund and returns policy

Request a quote

Data Center Investment Market

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Free sample

Data Center Investment Market

See the structure, tables and charts before you decide.

Smallform of Sample request

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to send your sample and answer your questions
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Talk to an analyst

Ask the team that built this report

Different scope, country or data cut? A senior analyst replies within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy