Data Centers in Estonia

Every data center in Estonia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 2 data centers in Estonia run by 1 operators: 1 operational, 1 under construction and 0 planned. Stated operational capacity is 2 MW, with a further 22 MW under construction and — planned. Greenergy Data Centers holds the largest share of tracked operational capacity (100%).

2Facilities tracked
1Operators
2 MWOperational (1 site)
22 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 2 facilities have a stated capacity; the others are counted as sites only.

Greenergy Tallinn DC-1 (colocation) · Greenergy Data Centers · Tallinn (approximate location)Greenergy Tallinn DC-1 AI hall · Greenergy Data Centers · Tallinn (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Estonia data center market: key facts

  • Capacity under construction or planned (22 MW) is 11.0 times the operational base of 2 MW.
  • Greenergy Data Centers has the largest development pipeline in Estonia: 22 MW under construction or planned.
  • The largest operational facility we track is Greenergy Tallinn DC-1 (colocation) (Greenergy Data Centers, Tallinn) at 2 MW.
  • The largest project in the pipeline is Greenergy Tallinn DC-1 AI hall (22 MW, under construction).
  • By type, the tracker lists 1 hyperscale and 1 colocation facilities.
Capacity by status, MW
Operational2 MW
Under construction22 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities by type
Hyperscale1
Colocation1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Estonia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Greenergy Data Centers22 MW22 MW100%

Largest data center projects in Estonia

Under construction and planned facilities with a stated capacity, largest first. 22 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Greenergy Tallinn DC-1 AI hallGreenergy Data Centers Tallinn Under construction Hyperscale 22 MW

How Estonia compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom219541,152 MW8,035 MW
Germany20063933 MW4,386 MW
France10620338 MW2,422 MW
Finland3918230 MW1,850 MW
Sweden4117172 MW1,510 MW
Ireland441753 MW1,278 MW
Norway228446 MW820 MW
Denmark331554.6 MW1,004 MW
Russia11121516 MW425 MW
Italy189245 MW693 MW
Netherlands12034271 MW449 MW
Iceland73286 MW—

Data center deals in Estonia

Our Deal Tracker lists 3 deals in Estonia since July 2026.

  • Magnora Data Center ASA → Risti Kampus data center project (180MW phase 1, up to 400MW) JV / partnership · 180 MW

All Estonia deals in the Deal Tracker

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Greenergy Tallinn DC-1 AI hallGreenergy Data Centers Tallinn Under construction 22 MW IT — Operator / official
Greenergy Tallinn DC-1 (colocation)Greenergy Data Centers Tallinn Operational 2 MW IT — Operator / official

Get the data

Every data center in Estonia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,394 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Estonia

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Estonia

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Estonia?

DC Market Insights tracks 2 data centers in Estonia as of November 2026: 1 operational, 1 under construction and 0 planned, run by 1 operators. The count grows as we verify more sites.

What is the data center capacity of Estonia?

Tracked operational capacity in Estonia is 2 MW, with 22 MW under construction and — planned. These totals use the capacity each source states (IT load where given) and cover 2 of 2 tracked facilities.

Which companies operate the most data center capacity in Estonia?

By tracked operational capacity, the largest operators in Estonia are Greenergy Data Centers (2 MW).

Which new data centers are being built in Estonia?

We track 22 MW under construction and — planned. The largest projects are Greenergy Tallinn DC-1 AI hall (22 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy