In short

As of 26 November 2026, DC Market Insights tracks 45 data centers in Sweden run by 18 operators: 34 operational, 3 under construction and 8 planned. Stated operational capacity is 172 MW, with a further 262 MW under construction and 2,248 MW planned. EcoDataCenter holds the largest share of tracked operational capacity (46%).

45Facilities tracked
18Operators
172 MWOperational (34 sites)
262 MWUnder construction (3 sites)
2,248 MWPlanned (8 sites)

MW = IT capacity where the source states it, otherwise total capacity. 18 of 45 facilities have a stated capacity; the others are counted as sites only.

Conapto Stockholm 1 City · Conapto · Stockholm (approximate location)Google Horndal · Google · Horndal (approximate location) · Cooling: Air or free coolingMeta Luleå Data Center · Meta · Luleå (approximate location) · Cooling: Air or free coolingSkellefteå campus · EdgeConneX · Skellefteå (approximate location)atNorth SWE01 Stockholm · atNorth · Kista (approximate location) · Cooling: HybridatNorth SWE02 Stockholm · atNorth · Kista (approximate location)atNorth SWE04 Sollefteå (Hamre Industrial Park) · atNorth · Långsele (approximate location)EcoDataCenter 1 Falun · EcoDataCenter · Falun (approximate location)EcoDataCenter 2 Borlänge · EcoDataCenter · Borlänge (approximate location)EcoDataCenter Smedjebacken (Röbacken) · EcoDataCenter · Smedjebacken (approximate location)Brookfield Strängnäs AI campus · Brookfield · Strängnäs (approximate location)Microsoft Sandviken datacenter (Sweden Central region) · Microsoft · Sandviken (approximate location)Microsoft Staffanstorp datacenter (Sweden Central region) · Microsoft · Staffanstorp (approximate location) · Cooling: Air or free coolingEquinix SK1 Stockholm · Equinix · Bromma (approximate location)Equinix SK2 Stockholm · Equinix · Sköndal (approximate location)Equinix SK3 Stockholm · Equinix · Spånga (approximate location)Digital Realty STO1 Stockholm · Digital Realty · Kista (approximate location)Digital Realty STO2 Stockholm · Digital Realty · Kista (approximate location)Digital Realty STO3 Stockholm · Digital Realty · Kista (approximate location)Digital Realty STO4 Stockholm · Digital Realty · Kista (approximate location)Digital Realty STO5 Stockholm · Digital Realty · Kista (approximate location)Digital Realty STO6 Stockholm · Digital Realty · Kista (approximate location)STACK STO01 Upplands Väsby · STACK Infrastructure · Upplands Väsby (approximate location)evroc Arlandastad (Stockholm) flagship data center · evroc · Arlandastad (approximate location)Hydro66 Boden · Hydro66 · Boden (approximate location)Conapto Stockholm 2 South · Conapto · Stockholm (approximate location)Conapto Stockholm 3 North · Conapto · Stockholm (approximate location)Bahnhof Pionen · Bahnhof · Stockholm (approximate location)Bahnhof Thule · Bahnhof · Stockholm (approximate location)Bahnhof S:t Erik · Bahnhof · Stockholm (approximate location)Bahnhof Gullan · Bahnhof · Kista (approximate location)Bahnhof Sparven · Bahnhof · Malmö (approximate location)Bahnhof Bunker Gothenburg · Bahnhof · Gothenburg (approximate location)Kolo SE1 Atlas Stockholm · Kolo · Stockholm (approximate location)Kolo SE2 Tellus Stockholm · Kolo · Stockholm (approximate location)Kolo SE3 Piteå · Kolo · Piteå (approximate location)Glesys Stockholm · Glesys · Stockholm (approximate location)Google Torsboda (Torsboda Industrial Park) · Google · Timrå (approximate location)Microsoft Gävle datacenter (Sweden Central region) · Microsoft · Gävle (exact location) · Cooling: Air or free coolingConapto Stockholm 4 South · Conapto · Stockholm (exact location)Glesys Falkenberg · Glesys · Falkenberg (exact location)AWS Katrineholm (Sothönan 21) · Amazon Web Services · Katrineholm (exact location)AWS Eskilstuna (Aspestahult 3:2) · Amazon Web Services · Eskilstuna (exact location)AWS Västerås (Kvastbruket 1) · Amazon Web Services · Västerås (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Sweden data center market: key facts

  • Capacity under construction or planned (2,510 MW) is 14.6 times the operational base of 172 MW.
  • The three largest operators by operational capacity, EcoDataCenter, Conapto and Hydro66, hold 80% of tracked operational MW.
  • Google has the largest development pipeline in Sweden: 1,000 MW under construction or planned.
  • The largest operational facility we track is EcoDataCenter 1 Falun (EcoDataCenter, Falun) at 80 MW.
  • The largest project in the pipeline is Google Torsboda (Torsboda Industrial Park) (1,000 MW, planned).
  • Timrå is the largest cluster: 1 of 45 facilities and 37% of tracked capacity.
  • By type, the tracker lists 29 colocation and 16 hyperscale facilities.
  • 18 of 45 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational172 MW
Under construction262 MW
Planned2,248 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Sweden by tracked capacity, MW
Google1,000 MW
atNorth342 MW
Conapto39 MW
Hydro6619.2 MW
evroc18 MW
Bahnhof12 MW
Glesys4.2 MW

OperationalUnder construction or planned

Capacity by market in Sweden, MW
Timrå1,000 MW
Strängnäs750 MW
Långsele300 MW
Borlänge250 MW
Smedjebacken150 MW
Stockholm118 MW
Falun80 MW
Boden19.2 MW
Gothenburg12 MW
Falkenberg3.2 MW

OperationalUnder construction or planned

Facilities by type
Colocation29
Hyperscale16

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Sweden data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 16 October 2026. Government sources are linked; the full source list comes with the Excel data.

Sweden pays the full energy tax on data-centre electricity since the reduction ended on 1 July 2023 (36.0 öre/kWh in 2026). Data centres of 500 kW IT or more must publish energy performance under Act 2025:570. Grid access is the main constraint: on 1 October 2026 Svenska kraftnät's queue held 7,326 MW of data-centre applications, and its April 2026 connection review proposes zones, a ready-first track and lowest-voltage connection. Svenska kraftnät: Information om pågående anslutningsärenden

Policy and incentives

Energy-tax reduction for electricity used in data centres abolished from 1 July 2023. Skatteverket

General energy tax on electricity 2026: 36.0 öre/kWh; the northern-Sweden 9.6 öre/kWh reduction excludes industrial use. Skatteverket

Energy minister answered interpellation 2025/26:414 on a national data-centre plan (13 Apr 2026): no plan committed; points to the AI strategy (20 Feb 2026), Svenska kraftnät connection review and waste-heat requirements. Riksdagen

Government confirmed work on a national data-centre strategy (Aug 2026); no details or date yet.

Power and grid

Svenska kraftnät queue on 1 Oct 2026: 7,326 MW data-centre applications out of 25,801 MW consumption applications. Svenska kraftnät

New transmission station considered only for at least 100 MW (220 kV) or 300 MW (400 kV); applications go via the distribution grid first. Svenska kraftnät

Connection review report (29 Apr 2026): lowest suitable voltage as main rule, capacity zones, ready-first track, possible fossil-free new-generation requirement for large loads, geographic fixed tariff fee from 2027. Svenska kraftnät

Proposed capacity reservation for general societal growth at congested stations; connections above 0.5 MW excluded (consultation 5 Feb 2026). Svenska kraftnät

2025 large industrial price (Eurostat band IE, excl. VAT): about 0.069 EUR/kWh (78.5 USD/MWh). Eurostat

Sustainability, water and climate

Electricity production 2024: 169.3 TWh, of which hydro 64.2, nuclear 48.7, wind 40.4, solar 4.1 and conventional thermal 11.8 TWh. Energimyndigheten

Naturvårdsverket electricity emission factor 59 g CO2e/kWh (Nordic mix average 2021-2023). Naturvårdsverket

Data centres of at least 500 kW IT report energy performance yearly to the EU database via the Swedish Energy Agency (2025 data due 15 May 2026). Energimyndigheten

Data rules

Act 2025:570 exempts confidential information from publication; data centres covered by the Protective Security Act (2018:585) are exempt per the Swedish Energy Agency. Energimyndigheten

Operators in Sweden

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Bahnhof6—12 MW—
Digital Realty6———
Conapto439 MW—23%
EcoDataCenter380 MW400 MW46%
atNorth312 MW330 MW7%
Microsoft3———
Kolo3———
Equinix3———
Amazon Web Services3———
Glesys24.2 MW—2.4%
Google2—1,000 MW—
Hydro66119.2 MW—11%
STACK Infrastructure118 MW—10%
Brookfield1—750 MW—
Meta1———
Hyperco1———
evroc1—18 MW—
EdgeConneX1———

Largest data center projects in Sweden

Under construction and planned facilities with a stated capacity, largest first. 262 MW under construction and 2,248 MW planned in total.

ProjectLocationStatusTypeCapacity
Google Torsboda (Torsboda Industrial Park)Google Timrå Planned Hyperscale 1,000 MW
Brookfield Strängnäs AI campusBrookfield Strängnäs Planned Hyperscale 750 MW
atNorth SWE04 Sollefteå (Hamre Industrial Park)atNorth Långsele Planned Hyperscale 300 MW
EcoDataCenter 2 BorlängeEcoDataCenter Borlänge Under construction Hyperscale 250 MW
EcoDataCenter Smedjebacken (Röbacken)EcoDataCenter Smedjebacken Planned Hyperscale 150 MW
atNorth SWE02 StockholmatNorth Kista Planned Colocation 30 MW
evroc Arlandastad (Stockholm) flagship data centerevroc Arlandastad Planned Hyperscale 18 MW
Bahnhof Bunker GothenburgBahnhof Gothenburg Under construction Colocation 12 MW

How Sweden compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom207551,064 MW7,741 MW
Germany20364933 MW4,386 MW
Finland4824230 MW2,661 MW
France10920338 MW2,422 MW
Sweden4518172 MW2,510 MW
Ireland461953 MW1,458 MW
Italy2211245 MW1,193 MW
Norway228446 MW820 MW
Denmark361654.6 MW1,004 MW
Russia11121516 MW425 MW
Spain411979.4 MW815 MW
Netherlands11034217 MW449 MW

Data center deals in Sweden

Our Deal Tracker lists 8 deals in Sweden since January 2026, with $1.43B in disclosed value.

  • Vertical Edge LLC JV with affiliates of an undisclosed global private equity firm → Hamre project company, 4.7 MW data center project, Hamre Industrial Park, Sollefteå (95%) JV / partnership · 4.7 MW
  • Vertical Data Inc. (Vertical Data Nordic AB) → Existing 4.5 MW industrial data center site, Hamre Industrial Park, Sollefteå Municipality (application for up to 100 MW) M&A · 4.5 MW
  • Amazon → Fageråsen, Boarp, Dållebo and Fågelås wind farms Power deal
  • EcoDataCenter → 52-hectare site for third Dalarna campus, Smedjebacken Land / campus · 150 MW

All Sweden deals in the Deal Tracker

Facilities

45 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Google Torsboda (Torsboda Industrial Park)Google
History
  1. Planned
  2. Planned
Timrå Planned 1,000 MW total — Operator / official
Brookfield Strängnäs AI campusBrookfield Strängnäs Planned 750 MW total — Trade press
atNorth SWE04 Sollefteå (Hamre Industrial Park)atNorth Långsele Planned 300 MW total — Operator / official
EcoDataCenter 2 BorlängeEcoDataCenter Borlänge Under construction 250 MW total — Trade press
EcoDataCenter Smedjebacken (Röbacken)EcoDataCenter Smedjebacken Planned 150 MW total — Operator / official
EcoDataCenter 1 FalunEcoDataCenter Falun Operational 80 MW total — Operator / official
atNorth SWE02 StockholmatNorth Kista Planned 30 MW total — Operator / official
Conapto Stockholm 4 SouthConapto Stockholm Operational 28 MW total — Operator / official
Hydro66 BodenHydro66 Boden Operational 19.2 MW total — Operator / official
evroc Arlandastad (Stockholm) flagship data centerevroc Arlandastad Planned 18 MW total — Operator / official
STACK STO01 Upplands VäsbySTACK Infrastructure Upplands Väsby Operational 18 MW total — Operator / official
atNorth SWE01 StockholmatNorth Cooling: Hybrid Kista Operational 12 MW total — Operator / official
Bahnhof Bunker GothenburgBahnhof
History
  1. Under construction
  2. Planned
Gothenburg Under construction 12 MW total — Operator / official
Conapto Stockholm 3 NorthConapto Stockholm Operational 6 MW total — Operator / official
Conapto Stockholm 2 SouthConapto Stockholm Operational 4 MW total — Operator / official
Glesys FalkenbergGlesys Falkenberg Operational 3.2 MW total 2020 Operator / official
Conapto Stockholm 1 CityConapto Stockholm Operational 1 MW total — Operator / official
Glesys StockholmGlesys Stockholm Operational 1 MW total — Operator / official
AWS Eskilstuna (Aspestahult 3:2)Amazon Web Services
History
  1. Planned
  2. Operational
Eskilstuna Operational — — Operator / official
AWS Katrineholm (Sothönan 21)Amazon Web Services
History
  1. Planned
  2. Operational
Katrineholm Operational — — Operator / official
AWS Västerås (Kvastbruket 1)Amazon Web Services
History
  1. Planned
  2. Operational
Västerås Operational — — Operator / official
Bahnhof GullanBahnhof Kista Operational — — Operator / official
Bahnhof PionenBahnhof Stockholm Operational — — Operator / official
Bahnhof S:t ErikBahnhof Stockholm Operational — — Operator / official
Bahnhof SparvenBahnhof Malmö Operational — — Operator / official
Bahnhof ThuleBahnhof Stockholm Operational — — Operator / official
Digital Realty STO1 StockholmDigital Realty Kista Operational — — Operator / official
Digital Realty STO2 StockholmDigital Realty Kista Operational — — Operator / official
Digital Realty STO3 StockholmDigital Realty Kista Operational — — Operator / official
Digital Realty STO4 StockholmDigital Realty Kista Operational — — Operator / official
Digital Realty STO5 StockholmDigital Realty Kista Operational — — Operator / official
Digital Realty STO6 StockholmDigital Realty Kista Operational — — Operator / official
Equinix SK1 StockholmEquinix Bromma Operational — — Operator / official
Equinix SK2 StockholmEquinix Sköndal Operational — — Operator / official
Equinix SK3 StockholmEquinix Spånga Operational — — Operator / official
Google HorndalGoogle Cooling: Air or free cooling Horndal Under construction — — Operator / official
Hyperco LingboHyperco Lingbo Planned — — Operator / official
Kolo SE1 Atlas StockholmKolo
History
  1. Operational
  2. Operational
Stockholm Operational — — Operator / official
Kolo SE2 Tellus StockholmKolo
History
  1. Operational
  2. Operational
Stockholm Operational — — Operator / official
Kolo SE3 PiteåKolo
History
  1. Operational
  2. Operational
Piteå Operational — — Operator / official
Meta Luleå Data CenterMeta Cooling: Air or free cooling Luleå Operational — 2013 Operator / official
Microsoft Gävle datacenter (Sweden Central region)Microsoft Cooling: Air or free cooling Gävle Operational — 2021 Operator / official
Microsoft Sandviken datacenter (Sweden Central region)Microsoft Sandviken Operational — 2021 Operator / official
Microsoft Staffanstorp datacenter (Sweden Central region)Microsoft Cooling: Air or free cooling Staffanstorp Operational — 2021 Operator / official
Skellefteå campusEdgeConneX
History
  1. Announced
  2. Planned
  3. Planned
Skellefteå Planned — — Trade press

Get the data

Every data center in Sweden, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,451 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Sweden

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Sweden

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Sweden?

DC Market Insights tracks 45 data centers in Sweden as of November 2026: 34 operational, 3 under construction and 8 planned, run by 18 operators. The count grows as we verify more sites.

What is the data center capacity of Sweden?

Tracked operational capacity in Sweden is 172 MW, with 262 MW under construction and 2,248 MW planned. These totals use the capacity each source states (IT load where given) and cover 18 of 45 tracked facilities.

Which companies operate the most data center capacity in Sweden?

By tracked operational capacity, the largest operators in Sweden are EcoDataCenter (80 MW), Conapto (39 MW) and Hydro66 (19.2 MW).

Where are the data centers in Sweden located?

The largest clusters by tracked capacity are Timrå (1 facilities), Strängnäs (1 facilities) and Långsele (1 facilities). The map above shows every site.

Which new data centers are being built in Sweden?

We track 262 MW under construction and 2,248 MW planned. The largest projects are Google Torsboda (Torsboda Industrial Park) (1,000 MW), Brookfield Strängnäs AI campus (750 MW) and atNorth SWE04 Sollefteå (Hamre Industrial Park) (300 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Sweden have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Sweden capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy