Proprietary data
akquinet Data Centers
Data centers operated by akquinet that we have verified: location, status and capacity, each checked against its source.
In short
As of 7 November 2026, DC Market Insights tracks 4 data centers operated by akquinet in 1 country, of which 4 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 0 of 4 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
akquinet data centers: key facts
About akquinet
AKQUINET is a Hamburg-based IT services group with about 900 staff that runs four colocation data centers in northern Germany: Victoria Park in Hamburg-Rahlstedt, Hamburg-Alsterdorf, Norderstedt and Itzehoe (company site, November 2026). Its newest site, Victoria Park, went into operation in 2024 and offers 2,350 m2 of IT space in 12 system rooms for up to 724 racks. AKQUINET does not publish MW figures for its sites. Since 2022 the group has been majority-owned by DBAG Fund VII, advised by Deutsche Beteiligungs AG.
- Headquarters
- Hamburg, Germany
- Founded
- 2002
- Ownership
- Private equity: DBAG Fund VII (majority, 2022 MBO), DBAG about 20%
- Parent company
- Deutsche Beteiligungs AG (DBAG Fund VII)
- Tracked footprint
- 4 facilities in 1 country
- Website
- akquinet.com
Data center business
- AKQUINET operates four highly available colocation data centers at Hamburg-Rahlstedt (Victoria Park), Hamburg-Alsterdorf, Norderstedt and Itzehoe. The sites support housing, colocation, hosting, cloud and full system operation. All four are supplied with 100% green electricity, and AKQUINET's IT services are certified to ISO/IEC 27001:2022. The data centers are run as inclusive businesses in which at least 40% of staff have a disability or impairment.
- Victoria Park in Hamburg-Rahlstedt is the newest site. It offers 2,350 m2 of IT space in 12 system rooms for up to 724 racks (47U), with up to 15 kW per rack and redundant A/B power. It holds TÜV NORD TSI.STANDARD V4.6 Level 4 and EN 50600 Availability Class 3 certification and has an annual PUE target below 1.25.
- The Victoria Park building has two redundant MTU standby generators of up to 2.6 MW each. They can run the site for more than 72 hours. Two route-diverse 10 kV medium-voltage feeds from Stromnetz Hamburg were energised in April 2024. Operations started in August 2024.
- Hamburg-Alsterdorf is a certified twin data center. In 2021 it became the first data center in Germany to receive the Blue Angel eco-label, and its waste heat warms the inclusive sports hall at Bugenhagen School. In 2008, IT service provider Dataport commissioned AKQUINET to build and run two TWIN data centers in Hamburg and Norderstedt.
- Norderstedt was the first data center to carry TÜV Rheinland's 'Sustainable Data Center' certificate. In 2004, AKQUINET took over the Itzehoe data center of the insurer Itzehoer Versicherung.
- AKQUINET runs Victoria Park and its sites in Hamburg-Alsterdorf, Norderstedt and Itzehoe as inclusive businesses, where people with and without disabilities work together. Data center operations sit in the 'Outsourcing & Data Center' business unit, led by Dennis Preljević, managing director of akquinet data center competence GmbH.
- DBAG Fund VII agreed in March 2022 to buy 100% of akquinet AG in a management buyout from about 70 shareholders, including the two founders and employees. DBAG invested up to about EUR 5m alongside the fund for a stake of around 20%. The group had 2021 revenue of about EUR 140m and 950 employees at that time.
Recent updates
- AKQUINET opened Victoria Park to the public on 6 November 2026 for Germany's 'Tag der offenen Rechenzentren' (data center open day). It described the site as the only colocation data center in northern Germany certified to TÜV NORD TSI Level 4.
- ISG named AKQUINET a Leader in the 'Sustainable Colocation Services – Midmarket' quadrant of its Provider Lens Private/Hybrid Cloud – Data Center Services Germany 2026 report. AKQUINET says three of its data centers are certified to TÜV NORD TSI.STANDARD V4.6 Level 4.
- AKQUINET rose to 18th place, from 19th, in the Lünendonk 2026 list of leading IT service companies in Germany, with organic growth of 11.0%.
- AKQUINET formed a partnership with Schwarz Digits and now offers STACKIT cloud services, including strategy consulting, cloud migration and managed operation, alongside its own colocation and hosting.
- TÜV NORD handed over the TSI.STANDARD V4.6 Level 4 and EN 50600 certificates for Victoria Park. AKQUINET says it is the only colocation data center in northern Germany at that level.
- The eco association named the Victoria Park build 'Most innovative data center project over 3.5 megawatts' in May 2025, for its approach to sustainability and inclusion. AKQUINET officially opened the site, its fourth high-performance data center, the same month.
Company details checked against company and official sources, 7 Nov 2026.
- 0 of 4 facilities have a capacity stated by their source; the totals above count only those.
Facilities
4 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Hamburg AlsterdorfColocation | Hamburg, Germany | Operational | — | — | Operator / official |
| ItzehoeColocation | Itzehoe, Germany | Operational | — | — | Operator / official |
| NorderstedtColocation | Norderstedt, Germany | Operational | — | — | Operator / official |
Rechenzentrum Victoria ParkColocation
History
|
Hamburg, Germany | Operational | — | 2024 | Operator / official |
Market position
How akquinet compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Germany, akquinet is one of 56 operators we track.
- Germany has 188 tracked data centers from 56 operators: 933 MW operational and 4,386 MW under construction or planned.
- Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
- Hamburg also hosts 10 other tracked data center(s), run by Portus Data Centers, Penta Infra, NorthC and NTT DATA.
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Other data centers in Hamburg
- HH4 · Portus Data Centers · Planned · 12.8 MW
- Penta HAM01 · Penta Infra · Operational · 4.4 MW
- Hamburg · NorthC · Operational · 1.2 MW
- Hamburg 1 · NTT DATA · Operational · 0.8 MW
- Data Center Hamburg 1 (HAM1) · ITENOS · Operational
- GlobalConnect Hamburg · GlobalConnect · Operational
- HAM001 · AtlasEdge · Operational
- HAM5 · plusserver · Operational
- HAM6 · plusserver · Operational
- HH1 · Equinix · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does akquinet operate?
DC Market Insights tracks 4 akquinet data center(s) in 1 country as of November 2026: 4 operational, 0 under construction and 0 planned.
Where is akquinet headquartered?
akquinet is headquartered in Hamburg, Germany. Ownership: Private equity: DBAG Fund VII (majority, 2022 MBO), DBAG about 20%.
Which other companies operate data centers in Germany?
Besides akquinet, the largest operators we track in Germany by capacity are NTT DATA, CloudHQ, AM:PM Grund, Telis Energie Deutschland and Schwarz Digits (STACKIT). The Germany page lists all 56 operators.
What rules apply to data centers in Germany?
Our Power & Policy Tracker lists 28 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Hamburg?
Other tracked data centers in Hamburg include HH4 (Portus Data Centers), Penta HAM01 (Penta Infra), Hamburg (NorthC) and Hamburg 1 (NTT DATA).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
