plusserver Data Centers

Data centers operated by plusserver that we have verified: location, status and capacity, each checked against its source.

In short

As of 13 November 2026, DC Market Insights tracks 4 data centers operated by plusserver in 1 country, of which 4 are operational.

4Facilities tracked
1Countries
—Operational (4 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 4 facilities have a stated capacity; the others are counted as sites only.

CGN3 · plusserver · Köln (approximate location)DUS6 · plusserver · Düsseldorf (approximate location)HAM5 · plusserver · Hamburg (approximate location)HAM6 · plusserver · Hamburg (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

plusserver data centers: key facts

About plusserver

plusserver is a German cloud and managed hosting provider headquartered in Cologne. It runs four own data centers in Germany – CGN3 in Cologne, DUS6 in Dusseldorf and HAM5 and HAM6 in Hamburg – from which it sells its pluscloud open and pluscloud VMware platforms, managed Kubernetes, storage, backup, dedicated servers and colocation. The company states 330+ employees and more than 2,000 customers, and says all four data centers run on 100 percent renewable electricity (company site, Nov 2026).

Headquarters
Cologne, Germany
Founded
1999
Tracked footprint
4 facilities in 1 country
Website
plusserver.com

Data center business

  • The German Federal Office for Information Security (BSI) certified the information network 'data center operation and network connection for cloud, hosting and colocation services' of plusserver GmbH under ISO 27001 on the basis of IT-Grundschutz (BSI-IGZ-0753-2026). The scope covers CGN3 Cologne, DUS6 Dusseldorf and HAM6 Hamburg-Wilhelmsburg; the certificate is valid until 3 March 2029.
  • PlusServer was formed in 2015 by merging three hosting businesses: PlusServer, the managed hosting division of Host Europe Group and Telefonica Online Services. In July 2017 funds advised by BC Partners agreed to acquire it from GoDaddy; at that time it hosted over 4,000 corporate clients in its data centers and had about EUR 100 million revenue in 2016.
  • plusserver says its cloud services are based in four locations in Germany: Hamburg (two sites), Cologne and Dusseldorf. The four data centers are named CGN3 (Cologne), DUS6 (Dusseldorf), HAM5 (north of Hamburg) and HAM6 (south of Hamburg). The company says the sites are ISO 27001 certified and use 100 percent renewable electricity.
  • CGN3 sits at the company headquarters in Cologne (Welserstrasse 14). It was built in 2006/2007, has a total area of 2,500 m2 including technology and three rooms of 550 m2 each (floor space for 18,000 servers). Power comes over a dedicated 10 kV line to a substation with two transformers; UPS capacity is 2,400 kW (n+1) and emergency generators are rated 2.0 and 2.5 MVA. Waste heat is used to heat the offices.
  • DUS6 in Dusseldorf offers cloud and colocation services in a 1,500 m2 building (including technology) with two fire sections, private cages and racks of 3-7.3 kW. It is fed over a 10 kV ring with its own medium-voltage switchgear and transformer; emergency power is 1.25 MVA + 900 kVA with 24 hours of fuel at full load.
  • HAM5 in the north of Hamburg was built in 2008 and modernised in 2011, 2013, 2016 and 2020. It has 2,130 m2 in total and two server rooms of 135 m2 and 270 m2 (floor space for 6,000 servers), a 2 MVA (n+1) medium-voltage supply on a 10 kV ring, 2 x 640 kW UPS and fuel for 72 hours at full load.
  • HAM6 in the south of Hamburg (Wilhelmsburg) was built in 2001 and modernised in 2007, 2009, 2013, 2017 and 2021. It has 1,200 m2 in total and four rooms of 120 m2 each (floor space for 6,600 servers), a 2 MVA (n+1) supply on a 10 kV ring, 2 x 504 kW UPS and a 24/7 guard on site.

Recent updates

  • plusserver, mogenius and Link11 launched a 'Managed Kubernetes & Security Suite' that combines managed Kubernetes on the plusserver Kubernetes Engine with web application and API protection, hosted and run only in German jurisdiction.
  • Dr. Marc Wilczek became CEO on 1 March 2026, succeeding Andreas Kadler; Friedrich Haarmann returned as Chief Product Officer. The release says plusserver runs its infrastructure in its own data centers in Germany, certified to ISO/IEC 27001 and BSI C5.
  • Raphael Baechle, previously managing director of the regional data center and telecom provider TelemaxX, took over as CFO on 1 January 2026, replacing Christoph Oberhaus.
  • plusserver opened an online shop where customers can book managed Kubernetes, object storage and databases directly; all offers run on infrastructure in certified data centers in Germany.
  • plusserver integrated Cosanta GmbH, an IT security firm running a security operations center, as a separate subsidiary, splitting its hosting and security businesses.

Company details checked against company and official sources, 13 Nov 2026.

  • 0 of 4 facilities have a capacity stated by their source; the totals above count only those.

Facilities

4 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CGN3Colocation Köln, Germany Operational — — Operator / official
DUS6Colocation Düsseldorf, Germany Operational — — Operator / official
HAM5Colocation Hamburg, Germany Operational — 2008 Operator / official
HAM6Colocation Hamburg, Germany Operational — 2001 Operator / official

Market position

How plusserver compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Germany, plusserver is one of 56 operators we track.
  • Germany has 188 tracked data centers from 56 operators: 933 MW operational and 4,386 MW under construction or planned.
  • Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
  • Hamburg also hosts 10 other tracked data center(s), run by Portus Data Centers, Penta Infra, NorthC and NTT DATA.

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
plusserver rank by capacity#38of 56 operators
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Other data centers in Hamburg

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does plusserver operate?

DC Market Insights tracks 4 plusserver data center(s) in 1 country as of November 2026: 4 operational, 0 under construction and 0 planned.

Where is plusserver headquartered?

plusserver is headquartered in Cologne, Germany.

Which other companies operate data centers in Germany?

Besides plusserver, the largest operators we track in Germany by capacity are NTT DATA, CloudHQ, AM:PM Grund, Telis Energie Deutschland and Schwarz Digits (STACKIT). The Germany page lists all 56 operators.

What rules apply to data centers in Germany?

Our Power & Policy Tracker lists 28 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Hamburg?

Other tracked data centers in Hamburg include HH4 (Portus Data Centers), Penta HAM01 (Penta Infra), Hamburg (NorthC) and Hamburg 1 (NTT DATA).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker