Proprietary data

NEXTDC Data Centers

Data centers operated by NEXTDC that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 1 data center operated by NEXTDC in 1 country (1 operational). Stated operational capacity is 65 MW.

1Facilities tracked
1Countries
65 MWOperational (1 site)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

KL1 · NEXTDC · Petaling Jaya (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

NEXTDC data centers: key facts

  • Its largest operational site is KL1 in Petaling Jaya, Malaysia at 65 MW.

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
KL1Colocation Petaling Jaya, Malaysia Operational 65 MW — Trade press

Market position

How NEXTDC compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Malaysia, NEXTDC ranks #13 of 31 tracked operators by capacity, with 1.4% of the country’s tracked MW.
  • Malaysia has 81 tracked data centers from 31 operators: 1,248 MW operational and 3,511 MW under construction or planned.
  • Industrial electricity in Malaysia costs 105 USD/MWh (2026, latest official figure).
  • Our Deal Tracker lists 2 deal(s) naming NEXTDC, the latest on 4 November 2026.

Data center operators in Malaysia

Tracked facilities8131 operators
Operational capacity1,248 MW3,511 MW in the pipeline
NEXTDC rank by capacity#13of 31 operators · 1.4%
Industrial power price105 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Vantage Data Centers3331 MW436 MW
AirTrunk4150 MW550 MW
Bridge Data Centres5146 MW500 MW
Princeton Digital Group2200 MW300 MW
Vena Nexus1—350 MW
YTL Data Centers897 MW240 MW
MSFusion1—300 MW
EdgeConneX3—284 MW

All data centers in Malaysia Power and policy in Malaysia

Deals naming NEXTDC

  • Goodman Group; Digital Realty (jointly owned entity) → Up to 9.9% of NEXTDC Ltd (ASX: NXT) M&A $501.1M
  • Convertible note investors → NEXTDC Australian data centre development pipeline Financing $790.4M

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does NEXTDC operate?

DC Market Insights tracks 1 NEXTDC data center(s) in 1 country as of October 2026: 1 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Malaysia?

Besides NEXTDC, the largest operators we track in Malaysia by capacity are Vantage Data Centers, AirTrunk, Bridge Data Centres, Princeton Digital Group and Vena Nexus. The Malaysia page lists all 31 operators.

What rules apply to data centers in Malaysia?

Our Power & Policy Tracker lists 8 government actions on data centers and power in Malaysia, including 1 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst