As of 7 October 2026, DC Market Insights tracks 2 data centers operated by SONDA in 1 country, of which 2 are operational.

2Facilities tracked
1Countries
—Operational (2 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 2 facilities have a stated capacity; the others are counted as sites only.

SONDA Kudos · SONDA · Quilicura (approximate location)SONDA DCQ1 · SONDA · Quilicura (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

SONDA data centers: key facts

  • 0 of 2 facilities have a capacity stated by their source; the totals above count only those.

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
SONDA DCQ1Colocation Quilicura, Chile Operational — — Trade press
SONDA KudosColocation Quilicura, Chile Operational — — Trade press

Market position

How SONDA compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Chile, SONDA is one of 19 operators we track.
  • Chile has 50 tracked data centers from 19 operators: 115 MW operational and 1,029 MW under construction or planned.
  • Quilicura also hosts 6 other tracked data center(s), run by Ascenty, Cirion Technologies and Google.

Data center operators in Chile

Tracked facilities5019 operators
Operational capacity115 MW1,029 MW in the pipeline
SONDA rank by capacity#14of 19 operators
Renewable share of generation66%2025
OperatorFacilitiesOperational MWPipeline MW
Grenergy3—400 MW
Ascenty542 MW225 MW
Scala Data Centers65 MW103 MW
TECfusions1—100 MW
DC Terranova1—92.7 MW
ODATA340.6 MW48 MW
EdgeConneX421 MW40 MW
Cirion Technologies24 MW20 MW

All data centers in Chile Power and policy in Chile

Other data centers in Quilicura

  • Santiago 4 · Ascenty · Under construction · 150 MW
  • SAN2 · Cirion Technologies · Under construction · 20 MW
  • Santiago 2 · Ascenty · Operational · 16 MW
  • Santiago 3 · Ascenty · Operational · 16 MW
  • Santiago 1 · Ascenty · Operational · 10 MW
  • Google Quilicura data center · Google · Operational

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does SONDA operate?

DC Market Insights tracks 2 SONDA data center(s) in 1 country as of October 2026: 2 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Chile?

Besides SONDA, the largest operators we track in Chile by capacity are Grenergy, Ascenty, Scala Data Centers, TECfusions and DC Terranova. The Chile page lists all 19 operators.

What rules apply to data centers in Chile?

Our Power & Policy Tracker lists 7 government actions on data centers and power in Chile, including 0 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Quilicura?

Other tracked data centers in Quilicura include Santiago 4 (Ascenty), SAN2 (Cirion Technologies), Santiago 2 (Ascenty) and Santiago 3 (Ascenty).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst