Proprietary data

Yondr Data Centers

Data centers operated by Yondr that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 6 data centers operated by Yondr in 3 countries, of which 5 are operational. Stated operational capacity is 40 MW, with a further 40 MW under construction and — planned. The pipeline is 1.0 times the capacity already operating.

6Facilities tracked
3Countries
40 MWOperational (5 sites)
40 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 6 facilities have a stated capacity; the others are counted as sites only.

Yondr Slough Building 1 · Yondr · Slough (approximate location)Yondr Slough Building 2 · Yondr · Slough (approximate location)Yondr Slough Building 3 · Yondr · Slough (approximate location)Yondr Frankfurt (Bischofsheim) · Yondr · Bischofsheim (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Yondr data centers: key facts

About Yondr

Yondr is a developer, owner and operator of hyperscale data centers, focused on campuses purpose-built for scale and designed to support cloud and AI workloads.

Headquarters
London, United Kingdom
Founded
2018
Ownership
Private; jointly controlled by DigitalBridge-managed investment vehicles and La Caisse (from July 2025)
Parent company
DigitalBridge Group, Inc. and La Caisse (formerly CDPQ)
Tracked footprint
6 facilities in 3 countries

Data center business

  • When DigitalBridge and La Caisse completed the acquisition of Yondr Group from Cathexis Holdings in July 2025, Yondr had more than 420MW of capacity committed to hyperscalers and land to support a total potential capacity of over 1GW.

Recent updates

  • 3 Sep 2026: Yondr said it is establishing its US headquarters in Dallas, from which it will pursue data center developments in Texas and other US locations.
  • 3 Aug 2026: Yondr and Cerberus acquired a 40-acre site for a 72MW Northern Virginia data center.
  • 30 Jul 2026: Yondr partnered with GLIL Infrastructure on its UK hyperscale data center campus.
  • 17 Dec 2025: Yondr completed the first ready-for-service milestone for the second building at its 96MW Northern Virginia campus.
  • 24 Nov 2025: Yondr completed the sale of its Johor campus to Vantage Data Centers.

Company details checked against company and official sources, 14 Nov 2026.

  • Capacity under construction or planned (40 MW) is 1.0 times the operational base of 40 MW.
  • Its largest operational site is Yondr Frankfurt (Bischofsheim) in Bischofsheim, Germany at 40 MW.
  • The largest project in the pipeline is Yondr Slough Building 3 (40 MW, under construction).
  • United Kingdom accounts for 50% of tracked capacity (3 facilities).
  • 2 of 6 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational40 MW
Under construction40 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Germany40 MW

OperationalUnder construction or planned

Yondr development pipeline

Under construction and planned facilities with a stated capacity, largest first. 40 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Yondr Slough Building 3Yondr Slough, United Kingdom Under construction Hyperscale 40 MW

Facilities

6 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Yondr Frankfurt (Bischofsheim)Hyperscale
History
  1. Announced
  2. Operational
Bischofsheim, Germany Operational 40 MW — Trade press
Yondr Slough Building 3Hyperscale
1 deal
Slough, United Kingdom Under construction 40 MW IT — Trade press
Yondr Northern Virginia Campus Building 1 (Loudoun County)Hyperscale United States Operational — — Operator / official
Yondr Northern Virginia Campus Building 2 (Loudoun County)Hyperscale
History
  1. Under construction
  2. Operational
United States Operational — — Operator / official
Yondr Slough Building 1Hyperscale
1 deal
Slough, United Kingdom Operational — 2024 Trade press
Yondr Slough Building 2Hyperscale
1 deal
Slough, United Kingdom Operational — 2025 Trade press

Market position

How Yondr compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Yondr ranks #32 of 54 tracked operators by capacity, with 0.5% of the country’s tracked MW.
  • United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • In United States, Yondr is one of 171 operators we track.
  • In Germany, Yondr ranks #19 of 56 tracked operators by capacity, with 0.8% of the country’s tracked MW.
  • Slough also hosts 10 other tracked data center(s), run by Manor Farm Propco, Virtus Data Centres, Iron Mountain and Kao Data.

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
Yondr rank by capacity#32of 54 operators · 0.5%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Yondr rank by capacity#86of 171 operators
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
Yondr rank by capacity#19of 56 operators · 0.8%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Other data centers in Slough

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Yondr operate?

DC Market Insights tracks 6 Yondr data center(s) in 3 countries as of October 2026: 5 operational, 1 under construction and 0 planned.

Where is Yondr headquartered?

Yondr is headquartered in London, United Kingdom. Ownership: Private; jointly controlled by DigitalBridge-managed investment vehicles and La Caisse (from July 2025).

Which other companies operate data centers in United Kingdom?

Besides Yondr, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Slough?

Other tracked data centers in Slough include Manor Farm Data Centre (Poyle) (Manor Farm Propco), LONDON19 (Slough) (Virtus Data Centres), Iron Mountain LON-2 (Iron Mountain) and LONDON4 (Slough) (Virtus Data Centres).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst