Volta Data Centres Data Centers

Data centers operated by Volta Data Centres that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 1 data center operated by Volta Data Centres in 1 country (1 operational).

1Facilities tracked
1Countries
—Operational (1 site)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 1 facilities have a stated capacity; the others are counted as sites only.

Volta London (Great Sutton Street) · Volta Data Centres · London (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Volta Data Centres data centers: key facts

  • 0 of 1 facilities have a capacity stated by their source; the totals above count only those.

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Volta London (Great Sutton Street)Colocation
1 deal
  • Arcus Infrastructure Partners (Arcus European Infrastructure Fund 4) → Volta Data Centres (6MW, central London)
  • All deals in the Deal Tracker
London, United Kingdom Operational — — Operator / official

Market position

How Volta Data Centres compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Volta Data Centres is one of 54 operators we track.
  • United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • London also hosts 10 other tracked data center(s), run by Ada Infrastructure, sineQN, Pure DC and Pure DC / SEGRO JV.
  • Our Deal Tracker lists 1 deal(s) naming Volta Data Centres, the latest on 29 October 2026.

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
Volta Data Centres rank by capacity#52of 54 operators
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Other data centers in London

  • Docklands Campus · Ada Infrastructure · Planned · 210 MW
  • Canning Town hyperscale data centre (Newham) · sineQN · Planned · 80 MW
  • Pure DC London Brent Cross (LON01) Building 2 · Pure DC · Under construction · 70 MW
  • Pure DC London Park Royal (LON02) · Pure DC / SEGRO JV · Planned · 56 MW
  • Vantage London (LHR1) campus · Vantage Data Centers · Planned · 55 MW
  • Global Switch London South · Global Switch · Planned · 40 MW
  • Telehouse West Two · Telehouse · Under construction · 22 MW
  • Pure DC London Brent Cross (LON01) Building 1 · Pure DC · Operational · 20 MW
  • Vantage London (LHR2) · Vantage Data Centers · Under construction · 20 MW
  • Telehouse South · Telehouse · Operational · 18 MW

Deals naming Volta Data Centres

  • Volta Data Centres (Arcus Infrastructure Partners) → Reynolds House Manchester data center M&A

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Volta Data Centres operate?

DC Market Insights tracks 1 Volta Data Centres data center(s) in 1 country as of October 2026: 1 operational, 0 under construction and 0 planned.

Which other companies operate data centers in United Kingdom?

Besides Volta Data Centres, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in London?

Other tracked data centers in London include Docklands Campus (Ada Infrastructure), Canning Town hyperscale data centre (Newham) (sineQN), Pure DC London Brent Cross (LON01) Building 2 (Pure DC) and Pure DC London Park Royal (LON02) (Pure DC / SEGRO JV).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst