In short
As of 2 November 2026, DC Market Insights tracks 9 data centers operated by Global Switch in 5 countries, of which 8 are operational. Stated operational capacity is 22 MW, with a further — under construction and 40 MW planned. The pipeline is 1.8 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 3 of 9 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Global Switch data centers: key facts
About Global Switch
Global Switch is an owner, operator and developer of large-scale, network-dense, carrier- and cloud-neutral data centres, with operations in Amsterdam, Frankfurt, London, Madrid and Paris in Europe and in Hong Kong and Singapore in Asia-Pacific. Its annual report for 2025 states 252MW of saleable capacity.
- Founded
- 2001
- Ownership
- Controlled by Shagang Group (51.8% indirect stake)
- Parent company
- Shagang Group
- Tracked footprint
- 9 facilities in 5 countries
- Website
- globalswitch.com
Data center business
- Global Switch's About page (October 2026) states that it has 12 data centres, and counting.
Recent updates
- 6 Oct 2026: Global Switch marked more than 25 years of data centre operations.
- 29 Sep 2026: Global Switch said its Paris data centre has been selected to host one of the biggest Nvidia Blackwell deployments in Europe.
Company details checked against company and official sources, 9 Nov 2026.
- Capacity under construction or planned (40 MW) is 1.8 times the operational base of 22 MW.
- Its largest operational site is Frankfurt North in Frankfurt am Main, Germany at 12 MW.
- The largest project in the pipeline is Global Switch London South (40 MW, planned).
- United Kingdom accounts for 65% of tracked capacity (3 facilities).
- 3 of 9 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Global Switch development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 40 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Global Switch London SouthGlobal Switch | London, United Kingdom | Planned | Colocation | 40 MW |
Facilities
9 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Global Switch London SouthColocation | London, United Kingdom | Planned | 40 MW IT | — | Operator / official |
| Frankfurt NorthColocation | Frankfurt am Main, Germany | Operational | 12 MW | — | Operator / official |
| Frankfurt SouthColocation | Frankfurt am Main, Germany | Operational | 10 MW | — | Operator / official |
| Global Switch AmsterdamColocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| Global Switch London EastColocation | London, United Kingdom | Operational | — | — | Operator / official |
| Global Switch London NorthColocation | London, United Kingdom | Operational | — | — | Operator / official |
| Global Switch Singapore Tai SengColocation | Singapore, Singapore | Operational | — | — | Operator / official |
| Global Switch Singapore WoodlandsColocation | Singapore, Singapore | Operational | — | — | Operator / official |
| Paris EastColocation | Clichy, France | Operational | — | — | Operator / official |
Market position
How Global Switch compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United Kingdom, Global Switch ranks #32 of 54 tracked operators by capacity, with 0.5% of the country’s tracked MW.
- United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
- Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
- In Germany, Global Switch ranks #25 of 56 tracked operators by capacity, with 0.4% of the country’s tracked MW.
- In Singapore, Global Switch is one of 21 operators we track.
- London also hosts 10 other tracked data center(s), run by Ada Infrastructure, sineQN, Pure DC and Pure DC / SEGRO JV.
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Equinix | 15 | — | 250 MW |
All data centers in United Kingdom Power and policy in United Kingdom
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Data center operators in Singapore
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| ST Telemedia Global Data Centres | 7 | 112 MW | 50 MW |
| AirTrunk | 2 | 78 MW | 70 MW |
| Digital Realty | 4 | 80 MW | 50 MW |
| Keppel | 11 | — | 75 MW |
| Equinix | 7 | 20 MW | 50 MW |
| Nxera | 3 | 58 MW | — |
| DayOne | 1 | — | 20 MW |
| YTL Data Centers | 1 | 12.5 MW | — |
All data centers in Singapore Power and policy in Singapore
Other data centers in London
- Docklands Campus · Ada Infrastructure · Planned · 210 MW
- Canning Town hyperscale data centre (Newham) · sineQN · Planned · 80 MW
- Pure DC London Brent Cross (LON01) Building 2 · Pure DC · Under construction · 70 MW
- Pure DC London Park Royal (LON02) · Pure DC / SEGRO JV · Planned · 56 MW
- Vantage London (LHR1) campus · Vantage Data Centers · Planned · 55 MW
- Telehouse West Two · Telehouse · Under construction · 22 MW
- Pure DC London Brent Cross (LON01) Building 1 · Pure DC · Operational · 20 MW
- Vantage London (LHR2) · Vantage Data Centers · Under construction · 20 MW
- Telehouse South · Telehouse · Operational · 18 MW
- CyrusOne LON2 · CyrusOne · Operational · 14 MW
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Global Switch operate?
DC Market Insights tracks 9 Global Switch data center(s) in 5 countries as of November 2026: 8 operational, 0 under construction and 1 planned.
Which other companies operate data centers in United Kingdom?
Besides Global Switch, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.
What rules apply to data centers in United Kingdom?
Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in London?
Other tracked data centers in London include Docklands Campus (Ada Infrastructure), Canning Town hyperscale data centre (Newham) (sineQN), Pure DC London Brent Cross (LON01) Building 2 (Pure DC) and Pure DC London Park Royal (LON02) (Pure DC / SEGRO JV).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.