Mexico Data Center Capacity

Installed data center capacity in Mexico (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 November 2026

How much data center capacity Mexico has installed, how it compares with the rest of Latin America, and what our trackers show about its sites, operators, deals and rules.

0.4 GWInstalled, end 2025IT load, DC Market Insights estimate
17%Share of Latin America2025
#27Rank among 33 countriesInstalled capacity, 2025
55Sites in our tracker15 with a stated MW

Mexico data center capacity at a glance

Mexico had about 0.4 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 17% of the capacity in Latin America and puts Mexico at number 27 of the 33 countries in our global model. Our Data Center Tracker holds 55 sites in Mexico run by 21 operators: 45 operational, 3 under construction and 7 planned. Our trackers also hold 1 verified deals and 14 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Mexico

187 MWStated at operational sites (45)
306 MWUnder construction (3 sites)
1,000 MWPlanned (7 sites)
21Operators

Largest tracked sites

SiteOperatorCityStatusMW
CloudHQ Querétaro campusCloudHQQuerétaroPlanned900 IT
DC QR03ODATAEl MarquésUnder construction300 IT
KIO QRO3KIO NetworksEl MarquésPlanned100
DC QR01ODATAQuerétaroOperational32
Querétaro 2 (QRO2)AscentyQuerétaroOperational31
DC QR02ODATAQuerétaroOperational30
Querétaro 1 (QRO1)AscentyColónOperational25
Querétaro 3 (QRO3)AscentyQuerétaroOperational25
DC QR04ODATASan Miguel de AllendeOperational12 IT
KIO QRO2KIO NetworksEl MarquésOperational12 IT

Every Mexico site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Querétaro1511126
Mexico City85n/a
Monterrey55n/a
El Marqués4219
Tepotzotlán215
Huixquilucan22n/a
Atizapán de Zaragoza21n/a
Tultitlán22n/a

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
CloudHQ1n/a900
ODATA474300
KIO Networks1419104
Ascenty381n/a
TERRANOVA18n/a
Scala Data Centers652
Telmex7n/an/a
Equinix4n/an/a

Operators ranked by MW stated at their tracked sites in Mexico.

Rules in force

  • TariffTarifas finales del Suministro Básico como tarifas máximas
  • RegulationSENER Single Self-Supply Window (Ventanilla Única de Autoconsumo): fixed deadlines for 0.7 to 20 MW self-supply projects
  • RegulationCogeneration rules: one study request; new plant and load centre studied on the larger of capacity or demand
  • RegulationCNE rules for batteries at load centres (SAEE-CC): connection studies and demand limits
  • GridCNE model interconnection and connection contract: load centres of 1 MW or more must sign; developer pays for works and posts guarantees

From government sources. Power and policy in Mexico

Recent deals

  • Aug 2026 · Land / campusQRO3 data center complex expansion, El Marqués Industrial Park, Querétaro, 100 MW, USD 1.3 bn

Deal Tracker

Other countries in Latin America

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Mexico in the full data pack

By year to 2035

Installed MW for Mexico from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Mexico have?

We estimate about 0.4 GW of installed data center capacity (IT load) in Mexico at the end of 2025, about 17% of Latin America and number 27 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Mexico?

Our Data Center Tracker lists 55 sites in Mexico (45 operational, 3 under construction, 7 planned), run by 21 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Mexico?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are CloudHQ, ODATA, KIO Networks. Site capacity is counted only where a source states it.

What rules apply to data centers in Mexico?

Our Power and Policy Tracker lists 14 government measures in force for Mexico, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Mexico data center capacity grow to 2035?

The full data pack gives installed capacity for Mexico by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.