Proprietary data

Data Centers in Bulgaria

Every data center in Bulgaria that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 8 data centers in Bulgaria run by 4 operators: 8 operational, 0 under construction and 0 planned. Stated operational capacity is 5 MW. Neterra holds the largest share of tracked operational capacity (100%).

8Facilities tracked
4Operators
5 MWOperational (8 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 8 facilities have a stated capacity; the others are counted as sites only.

Equinix SO1 · Equinix · Sofia (approximate location)Equinix SO2 · Equinix · Sofia (approximate location)Telepoint Sofia East · Telepoint · Sofia (approximate location)Telepoint Montana · Telepoint · Montana (approximate location)Neterra SDC Sofia campus (SDC 1 and Building 2) · Neterra · Sofia (approximate location)Neterra SDC Stolnik · Neterra · Stolnik (approximate location)Neterra SDC Ruse · Neterra · Ruse (approximate location)BULATSA Contingency and Data Center Bozhurishte (CDC BOZ) · BULATSA · Bozhurishte (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Bulgaria data center market: key facts

  • The three largest operators by operational capacity, Neterra, Equinix and Telepoint, hold 100% of tracked operational MW.
  • The largest operational facility we track is Neterra SDC Sofia campus (SDC 1 and Building 2) (Neterra, Sofia) at 3 MW.
  • Sofia is the largest cluster: 6 of 8 facilities and 100% of tracked capacity.
  • By type, the tracker lists 7 colocation and 1 enterprise facilities.
  • 2 of 8 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Colocation7
Enterprise1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Bulgaria

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Neterra35 MW—100%
Telepoint2———
Equinix2———
BULATSA1———

How Bulgaria compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom219541,152 MW8,035 MW
Germany20063933 MW4,386 MW
France10620338 MW2,422 MW
Finland3918230 MW1,850 MW
Sweden4117172 MW1,510 MW
Ireland441753 MW1,278 MW
Norway228446 MW820 MW
Denmark331554.6 MW1,004 MW
Russia11121516 MW425 MW
Italy189245 MW693 MW
Netherlands12034271 MW449 MW
Iceland73286 MW—

Facilities

8 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Neterra SDC Sofia campus (SDC 1 and Building 2)Neterra Sofia Operational 3 MW — Operator / official
Neterra SDC StolnikNeterra Stolnik Operational 2 MW total — Operator / official
BULATSA Contingency and Data Center Bozhurishte (CDC BOZ)BULATSA Bozhurishte Operational — — Operator / official
Equinix SO1Equinix Sofia Operational — — Operator / official
Equinix SO2Equinix Sofia Operational — — Operator / official
Neterra SDC RuseNeterra Ruse Operational — — Operator / official
Telepoint MontanaTelepoint Montana Operational — — Operator / official
Telepoint Sofia EastTelepoint Sofia Operational — — Operator / official

Get the data

Every data center in Bulgaria, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,394 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Bulgaria

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Bulgaria

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Bulgaria?

DC Market Insights tracks 8 data centers in Bulgaria as of November 2026: 8 operational, 0 under construction and 0 planned, run by 4 operators. The count grows as we verify more sites.

What is the data center capacity of Bulgaria?

Tracked operational capacity in Bulgaria is 5 MW, with — under construction and — planned. These totals use the capacity each source states (IT load where given) and cover 2 of 8 tracked facilities.

Which companies operate the most data center capacity in Bulgaria?

By tracked operational capacity, the largest operators in Bulgaria are Neterra (5 MW).

Where are the data centers in Bulgaria located?

The largest clusters by tracked capacity are Sofia (6 facilities), Ruse (1 facilities) and Montana (1 facilities). The map above shows every site.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy