In short
As of 15 November 2026, DC Market Insights tracks 7 government actions on data centers and power in Belgium, 5 of them in force. We have found no moratorium or restriction on new data centers in force in Belgium.
Market snapshot
Belgium power and policy: key facts
- Industrial electricity price: 183 USD/MWh (2025). Rank 7 of 35 tracked countries, highest first.
- Renewable share of electricity generation: 34.3% (2025). Rank 28 of 50 tracked countries, highest first.
- Grid emission factor: 0.19 kgCO2/kWh (2024). Rank 25 of 41 tracked countries, highest first.
- Latest change: Amendment of the 2024-2027 Elia tariff methodology: tariff reduction for eligible stable and/or anticyclic profiles (CREG (Commission de Régulation de l'Électricité et du Gaz), 24 Sep 2026).
- By type: 4 grid access, 2 power tariff and 1 efficiency rule.
Power indicators for Belgium
Latest official figure for each indicator, with earlier years where we have them.
In force now in Belgium
Grid access (2)
Wallonia: flexible high-voltage connection contracts (decree of 19 December 2025, CWaPE approval 25 June 2026)
Walloon decree of 19 December 2025 ('Neven I') allows new withdrawal connections in saturated grid zones under contracts that split firm and flexible capacity. Regulator CWaPE approved the ORES and RESA high-voltage standard connection contracts with firm and flexible capacity on 25 June 2026. Until 31 December 2027 at the latest only firm capacity is offered; the flexible part can be activated once the grid operators' tools are ready.
CREG decision (B)3027: revised code of conduct for connection and access to the transmission grid
CREG decision (B)3027 of 29 January 2026 amends the 20 October 2022 code of conduct for connection to and access to Elia's transmission grid. It sets binding deadlines (30-120 days) for each connection step with possible sanctions, restructures the procedure into go/no-go steps with project-maturity filters (incl. sworn statements on land availability), moves capacity reservation to a later stage with time-limited validity, adds a use-it-or-lose-it principle and allocation by user category (first come, first served within a category). Elia had a tolerance period to 9 September 2026 to clear its backlog. CREG told Parliament data centre requests are currently handled like other requests.
Power tariff (2)
Amendment of the 2024-2027 Elia tariff methodology: tariff reduction for eligible stable and/or anticyclic profiles
CREG amended its 2024-2027 transmission tariff methodology to add an Annex 4. It gives a tariff reduction to stable or anticyclic consumption profiles whose corrected consumption exceeds 10 GWh per year. A stable profile means at least 7,000 hours of annual utilisation. An anticyclic profile means at least 55% of consumption in off-peak hours. The reduction uses a 'direct line' method based on the distance to the nearest suitable generation unit. It covers access tariffs except injection, overrun and reactive-energy tariffs, and does not cover connection tariffs. Storage and generation sites are not eligible. Elia's total allowed revenue is unchanged, so the cost shifts to other grid users. The procedure covers reductions for 2026 and 2027.
10 GWh per year Eligibility threshold on corrected electricity consumption per calendar year; reduction rates are validated by CREG in a later tariff decision
Law of 24 April 2026 allowing transmission tariffs to vary by consumption profile
A federal law of 24 April 2026, published in the Moniteur belge on 5 May 2026, added article 12, §5, 30° to the Electricity Law of 29 April 1999. It lets transmission tariffs vary by consumption profile, including stable or anticyclic profiles, to ensure optimal and balanced use of the transmission grid. It is the legal basis for CREG's tariff reduction for stable and anticyclic profiles.
Efficiency rule (1)
Wallonia: data centre energy-performance reporting under the EU Energy Efficiency Directive (500 kW+)
Data centres in Wallonia with installed power demand of at least 500 kW must report energy performance data under the EU Energy Efficiency Directive to the SPW Territoire, Logement, Patrimoine, Energie. First report was due before 15 September 2024; after that a report is due every year before 15 May.
500 kW reporting threshold (installed power demand)
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Flanders: Parliament adopts decree on flexible connection agreements (10 December 2025)
On 10 December 2025 the Flemish Parliament adopted, by a large majority, a draft decree amending the Energy Decree of 8 May 2009. It creates a legal framework for flexible (non-firm) connection agreements, so customers can be connected above the physical grid limit if they cut consumption at peak times. Fluvius told the hearing that the decree still has to be turned into a technical regulation, put to public consultation and approved by the regulator.
Elia proposal: separate data centre category with capped grid capacity
Transmission operator Elia proposed in October 2025 to put data centres in their own connection category with grid capacity reserved up to a set limit, so other industrial users are not crowded out; flexible (curtailable) connections would remain possible. Data centre connection requests rose ninefold since 2022 and capacity already reserved for 2034 is more than double the 8 TWh assumed in grid plans. Energy minister Mathieu Bihet said data centre demand will be handled in the 2028-2038 federal grid development plan. No cap figure set yet; CREG said in March 2026 DC requests are still treated like others.
Timeline of data center and power policy in Belgium
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 24 Sep 2026 | Amendment of the 2024-2027 Elia tariff methodology: tariff reduction for eligible stable and/or anticyclic profiles | Power tariff | In force | CREG (Commission de Régulation de l'Électricité et du Gaz) |
| 25 Jun 2026 | Wallonia: flexible high-voltage connection contracts (decree of 19 December 2025, CWaPE approval 25 June 2026) Wallonia | Grid access | In force | CWaPE (Walloon energy regulator); Walloon Government |
| 24 Apr 2026 | Law of 24 April 2026 allowing transmission tariffs to vary by consumption profile | Power tariff | In force | Belgian federal legislator |
| 29 Jan 2026 | CREG decision (B)3027: revised code of conduct for connection and access to the transmission grid | Grid access | In force | CREG (federal electricity and gas regulator) |
| 10 Dec 2025 | Flanders: Parliament adopts decree on flexible connection agreements (10 December 2025) | Grid access | Announced | Vlaams Parlement; Vlaamse Nutsregulator (implementation) |
| 22 Oct 2025 | Elia proposal: separate data centre category with capped grid capacity | Grid access | Proposed | Elia Transmission Belgium (TSO); Federal Minister of Energy |
| 15 Sep 2024 | Wallonia: data centre energy-performance reporting under the EU Energy Efficiency Directive (500 kW+) Wallonia | Efficiency rule | In force | Service public de Wallonie (SPW Territoire, Logement, Patrimoine, Énergie) |
How Belgium compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Costa Rica | — | 98.6% (2025) | 0.04 kgCO2/kWh (2025) | 1 | 1 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Israel | — | 14.6% (2024) | 0.41 kgCO2/kWh (2024) | 1 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| New Zealand | — | 88.5% (2025) | 0.08 kgCO2/kWh (2025) | 0 | 0 |
| Nigeria | 154 USD/MWh (2026) | 32.7% (2025) | — | 0 | 1 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Poland | 197 USD/MWh (2026) | 31.4% (2025) | — | 0 | 1 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
| Vietnam | 69.9 USD/MWh (2026) | — | — | 1 | 1 |
Questions
Is there a data center moratorium in Belgium?
We have found no moratorium or restriction on new data centers in force in Belgium as of 15 November 2026. Proposed or announced measures, if any, are listed in the timeline.
What does electricity cost for data centers in Belgium?
The industrial electricity price in Belgium was 183 USD/MWh in 2025 (Eurostat nrg_pc_205, non-household band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes: 2025-S1 0.1659 + 2025-S2 0.1571 EUR/kWh, mean 161.5 EUR/MWh x 1.1300 USD/EUR (Eurostat ert_bil_eur_a 2025 annual average) = 182.5 USD/MWh). Data center contracts can differ by voltage level, contract length and location.
How much of Belgium’s electricity is renewable?
Renewables supplied 34.3% of electricity generation in Belgium in 2025.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.