In short

As of 16 November 2026, DC Market Insights tracks 35 data centers in Belgium run by 12 operators: 28 operational, 2 under construction and 5 planned. Stated operational capacity is 54 MW, with a further — under construction and 24 MW planned. KevlinX holds the largest share of tracked operational capacity (30%).

35Facilities tracked
12Operators
54 MWOperational (28 sites)
—Under construction (2 sites)
24 MWPlanned (5 sites)

MW = IT capacity where the source states it, otherwise total capacity. 6 of 35 facilities have a stated capacity; the others are counted as sites only.

DC Antwerp 1 · Datacenter United · Antwerp (approximate location)DC Antwerp 3 · Datacenter United · Antwerp (approximate location)DC Burcht · Datacenter United · Burcht (approximate location)DC Mechelen · Datacenter United · Mechelen (approximate location)DC Evere 1 · Datacenter United · Evere (approximate location)DC Evere 2 · Datacenter United · Evere (approximate location)DC Brussels · Datacenter United · Zaventem (approximate location)DC Machelen · Datacenter United · Machelen (approximate location)DC Ghent · Datacenter United · Gent (approximate location)DC Ghent 2 · Datacenter United · Gent (approximate location)DC Hasselt 1 · Datacenter United · Hasselt (approximate location)DC Oostkamp · Datacenter United · Oostkamp (approximate location)DC Mouscron · Datacenter United · Mouscron (approximate location)LCL Brussels-North · LCL · Diegem (approximate location)LCL Brussels-West · LCL · Aalst (approximate location)LCL Brussels-South · LCL · Huizingen (approximate location)LCL Antwerp · LCL · Antwerp (approximate location)LCL Wallonia One · LCL · Gembloux (approximate location)Google Saint-Ghislain · Google · Saint-Ghislain (approximate location) · Cooling: Evaporative or adiabatic · Owned (self-build): Google-built and operated campus (first Google data centre outside the U.S.)Google Farciennes · Google · Farciennes (approximate location)Google Feluy-Écaussinnes · Google · Écaussinnes (approximate location)BRU1 · Digital Realty · Zaventem (approximate location)BRU3 · Digital Realty · Zaventem (approximate location)BRU4 · Digital Realty · Zaventem (approximate location) · Cooling: HybridBRU001 · AtlasEdge · Nossegem (approximate location)BRU01 · Penta Infra · Zellik (approximate location)Ghent · nLighten · Merelbeke (approximate location)BRU (Ternat) · EdgeConneX · Ternat (approximate location)Azure Belgium Central · Microsoft · Brussels (approximate location)DC Antwerp 2 · Datacenter United · Antwerp (approximate location)KevlinX Galilei site (Neder-Over-Heembeek) · KevlinX · Brussels (approximate location)DC Hasselt 2 · Datacenter United · Hasselt (approximate location)Ark Brussels campus · Ark Data Centres · Brussels (approximate location)BRU01 · KevlinX · Brussels (exact location) · Cooling: Evaporative or adiabatic
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Belgium data center market: key facts

  • Capacity under construction or planned (24 MW) is 0.4 times the operational base of 54 MW.
  • The three largest operators by operational capacity, KevlinX, EdgeConneX and Digital Realty, hold 84% of tracked operational MW.
  • Ark Data Centres has the largest development pipeline in Belgium: 24 MW under construction or planned.
  • The largest operational facility we track is BRU01 (KevlinX, Brussels) at 16 MW.
  • The largest project in the pipeline is Ark Brussels campus (24 MW, planned).
  • Brussels is the largest cluster: 17 of 35 facilities and 98% of tracked capacity.
  • By type, the tracker lists 28 colocation, 5 hyperscale and 1 edge facilities.
  • 6 of 35 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational54 MW
Planned24 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Belgium by tracked capacity, MW
KevlinX16 MW
nLighten1.2 MW

OperationalUnder construction or planned

Capacity by market in Belgium, MW
Brussels76.8 MW
Ghent1.2 MW

OperationalUnder construction or planned

Facilities by type
Colocation28
Hyperscale5
Edge1
Enterprise1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Belgium data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 12 October 2026. Government sources are linked; the full source list comes with the Excel data.

Grid access for Belgian data centres is governed by the federal regulator CREG and transmission operator Elia. CREG decision (B)3027 of 29 January 2026 tightened the transmission connection process with binding deadlines, maturity filters and use-it-or-lose-it rules; CREG told Parliament in March 2026 that data centre requests get no special treatment and called for a joint federal-regional view on how many data centres to host and where. Elia has proposed a separate, capped capacity category for data centres. Belgian Chamber of Representatives, DOC 56 1466/001 (7 Apr 2026), report on CREG decision (B)3027

Policy and incentives

CREG told the Chamber energy committee (hearing 17 March 2026) that data centre connection requests are currently treated the same way as other requests because no specific policy guidance exists, and called for joint reflection by the federal and regional governments on the number and location of data centres. Belgian Chamber of Representatives, DOC 56 1466/001 (7 Apr 2026), report on CREG decision (B)3027

Elia proposed in October 2025 a separate data centre category with grid capacity reserved up to a limit; the energy minister said data centre demand will be addressed in the 2028-2038 federal grid development plan. No cap has been set.

Power and grid

CREG decision (B)3027 of 29 January 2026 amends the 2022 code of conduct for transmission connections: binding 30-120 day deadlines per step, maturity filters, later and time-limited capacity reservations, use-it-or-lose-it, and allocation by user category. Belgian Chamber of Representatives, DOC 56 1466/001 (7 Apr 2026), report on CREG decision (B)3027

Elia's hosting-capacity map only estimates capacity for connections below 300 MW; larger loads at extra-high voltage need a location-specific orientation study.

In Wallonia, CWaPE approved on 25 June 2026 high-voltage connection contracts with firm and flexible capacity under the decree of 19 December 2025; only firm capacity is offered until 31 December 2027 at the latest. CWaPE press file 30 Jun 2026

Renewables reached 34.3% of gross electricity consumption in 2025 (31.3% in 2024), per Eurostat SHARES. Eurostat nrg_ind_ren

Sustainability, water and climate

Data centres with installed power demand of at least 500 kW must report energy performance under the EU Energy Efficiency Directive; in Wallonia the first report was due before 15 September 2024 and then yearly before 15 May. Wallonie.be

The Belgian grid emission factor (consumption basis) was 0.190 kg CO2eq/kWh in 2024 according to the Walloon Air and Climate Agency (AWAC). AWAC

Operators in Belgium

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Datacenter United15———
LCL5———
Digital Realty313.6 MW—25%
Google3———
KevlinX216 MW—30%
EdgeConneX116 MW—30%
Penta Infra17.2 MW—13%
nLighten11.2 MW—2.2%
Microsoft1———
AtlasEdge1———
Cegeka1———
Ark Data Centres1—24 MW—

Largest data center projects in Belgium

Under construction and planned facilities with a stated capacity, largest first. — under construction and 24 MW planned in total.

ProjectLocationStatusTypeCapacity
Ark Brussels campusArk Data Centres Brussels Planned Colocation 24 MW

How Belgium compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom219541,152 MW8,035 MW
Germany18856933 MW4,386 MW
France5510322 MW1,413 MW
Sweden4117172 MW1,510 MW
Finland3616230 MW1,430 MW
Ireland391553 MW1,278 MW
Russia11121516 MW425 MW
Denmark301454.6 MW844 MW
Italy107170 MW693 MW
Netherlands10833217 MW414 MW
Norway22—350 MW
Spain211279.4 MW175 MW

Data center deals in Belgium

Our Deal Tracker lists 1 deals in Belgium since October 2026, with $17.0M in disclosed value.

  • Digital Realty → Land near Brussels Land / campus $17.0M

All Belgium deals in the Deal Tracker

Facilities

35 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Ark Brussels campusArk Data Centres Brussels Planned 24 MW IT — Operator / official
BRU (Ternat)EdgeConneX Ternat Operational 16 MW total — Operator / official
BRU01KevlinX Cooling: Evaporative or adiabatic
History
  1. Operational
  2. Operational
Brussels Operational 16 MW IT — Operator / official
BRU4Digital Realty Cooling: Hybrid Zaventem Operational 13.6 MW total — Operator / official
BRU01Penta Infra Zellik Operational 7.2 MW IT — Trade press
GhentnLighten Merelbeke Operational 1.2 MW IT — Operator / official
Azure Belgium CentralMicrosoft Brussels Operational — — Operator / official
BRU001AtlasEdge Nossegem Operational — — Operator / official
BRU1Digital Realty Zaventem Operational — — Operator / official
BRU3Digital Realty Zaventem Operational — — Operator / official
Cegeka underground data center (Limburg)Cegeka Planned — — Trade press
DC Antwerp 1Datacenter United Antwerp Operational — — Operator / official
DC Antwerp 2Datacenter United Antwerp Operational — — Operator / official
DC Antwerp 3Datacenter United Antwerp Operational — — Operator / official
DC BrusselsDatacenter United Zaventem Operational — — Operator / official
DC BurchtDatacenter United Burcht Operational — — Operator / official
DC Evere 1Datacenter United Evere Operational — — Operator / official
DC Evere 2Datacenter United Evere Operational — — Operator / official
DC GhentDatacenter United Gent Operational — — Operator / official
DC Ghent 2Datacenter United
History
  1. Planned
  2. Planned
Gent Planned — — Operator / official
DC Hasselt 1Datacenter United Hasselt Operational — — Operator / official
DC Hasselt 2Datacenter United Hasselt Operational — — Operator / official
DC MachelenDatacenter United Machelen Operational — — Operator / official
DC MechelenDatacenter United Mechelen Operational — — Operator / official
DC MouscronDatacenter United Mouscron Planned — — Operator / official
DC OostkampDatacenter United Oostkamp Operational — — Operator / official
Google FarciennesGoogle
History
  1. Planned
  2. Under construction
Farciennes Under construction — — Operator / official
Google Feluy-ÉcaussinnesGoogle Écaussinnes Planned — — Trade press
Google Saint-GhislainGoogle Cooling: Evaporative or adiabatic · Owned (self-build): Google-built and operated campus (first Google data centre outside the U.S.)
History
  1. Under construction
  2. Operational
  3. Operational
  4. Operational
Saint-Ghislain Operational — 2010 Operator / official
KevlinX Galilei site (Neder-Over-Heembeek)KevlinX Brussels Under construction — — Operator / official
LCL AntwerpLCL Antwerp Operational — — Operator / official
LCL Brussels-NorthLCL
History
  1. Under construction
  2. Operational
  3. Operational
Diegem Operational — — Operator / official
LCL Brussels-SouthLCL Huizingen Operational — — Operator / official
LCL Brussels-WestLCL Aalst Operational — — Operator / official
LCL Wallonia OneLCL Gembloux Operational — — Operator / official

Get the data

Every data center in Belgium, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,623 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Belgium

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Belgium

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Belgium?

DC Market Insights tracks 35 data centers in Belgium as of November 2026: 28 operational, 2 under construction and 5 planned, run by 12 operators. The count grows as we verify more sites.

What is the data center capacity of Belgium?

Tracked operational capacity in Belgium is 54 MW, with — under construction and 24 MW planned. These totals use the capacity each source states (IT load where given) and cover 6 of 35 tracked facilities.

Which companies operate the most data center capacity in Belgium?

By tracked operational capacity, the largest operators in Belgium are KevlinX (16 MW), EdgeConneX (16 MW) and Digital Realty (13.6 MW).

Where are the data centers in Belgium located?

The largest clusters by tracked capacity are Brussels (17 facilities), Ghent (3 facilities) and Antwerp (5 facilities). The map above shows every site.

Which new data centers are being built in Belgium?

We track — under construction and 24 MW planned. The largest projects are Ark Brussels campus (24 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy