In short

As of 25 November 2026, DC Market Insights tracks 15 data centers operated by CDC Data Centres in 2 countries, of which 8 are operational. Stated operational capacity is 765 MW, with a further 943 MW under construction and — planned. The pipeline is 1.2 times the capacity already operating.

15Facilities tracked
2Countries
765 MWOperational (8 sites)
943 MWUnder construction (4 sites)
—Planned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 11 of 15 facilities have a stated capacity; the others are counted as sites only.

CDC Hume Campus One · CDC Data Centres · Canberra (approximate location)CDC Hume Campus Two · CDC Data Centres · Canberra (approximate location)CDC Fyshwick Campus · CDC Data Centres · Canberra (approximate location)CDC Beard Campus (BE1) · CDC Data Centres · Canberra (approximate location)CDC Eastern Creek Campus · CDC Data Centres · Sydney (approximate location)CDC Marsden Park Campus · CDC Data Centres · Sydney (approximate location)CDC Kemps Creek · CDC Data Centres · Sydney (approximate location)CDC Gregadoo · CDC Data Centres · Wagga Wagga (approximate location)CDC Brooklyn Campus · CDC Data Centres · Melbourne (approximate location)CDC Laverton Campus · CDC Data Centres · Melbourne (approximate location)CDC Maddington · CDC Data Centres · Perth (approximate location)CDC Hazelmere · CDC Data Centres · Perth (approximate location)Silverdale Campus One · CDC Data Centres · Auckland (approximate location)Hobsonville Campus One · CDC Data Centres · Auckland (approximate location)Hobsonville Campus Two · CDC Data Centres · Auckland (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

CDC Data Centres data centers: key facts

  • Capacity under construction or planned (943 MW) is 1.2 times the operational base of 765 MW.
  • Its largest operational site is CDC Brooklyn Campus in Melbourne, Australia at 350 MW.
  • The largest project in the pipeline is CDC Marsden Park Campus (504 MW, under construction).
  • Australia accounts for 94% of tracked capacity (12 facilities).
  • By type, the tracker lists 11 hyperscale and 4 colocation facilities.
  • 11 of 15 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational765 MW
Under construction943 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Australia1,610 MW

OperationalUnder construction or planned

Facilities by type
Hyperscale11
Colocation4

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

CDC Data Centres development pipeline

Under construction and planned facilities with a stated capacity, largest first. 943 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
CDC Marsden Park CampusCDC Data Centres Sydney, Australia Under construction Hyperscale 504 MW
CDC Laverton CampusCDC Data Centres Melbourne, Australia Under construction Hyperscale 400 MW
CDC Beard Campus (BE1)CDC Data Centres Canberra, Australia Under construction Colocation 39 MW

Facilities

15 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CDC Marsden Park CampusHyperscale Sydney, Australia Under construction 504 MW — Operator / official
CDC Laverton CampusHyperscale Melbourne, Australia Under construction 400 MW — Operator / official
CDC Brooklyn CampusHyperscale Melbourne, Australia Operational 350 MW 2024 Operator / official
CDC Eastern Creek CampusHyperscale Sydney, Australia Operational 200 MW — Operator / official
Hobsonville Campus TwoHyperscale Auckland, New Zealand Operational 54 MW — Operator / official
CDC Hume Campus TwoColocation Canberra, Australia Operational 51 MW — Operator / official
CDC Fyshwick CampusColocation Canberra, Australia Operational 45 MW — Operator / official
CDC Beard Campus (BE1)Colocation Canberra, Australia Under construction 39 MW — Operator / official
Hobsonville Campus OneHyperscale Auckland, New Zealand Operational 22 MW — Operator / official
Silverdale Campus OneHyperscale Auckland, New Zealand Operational 22 MW — Operator / official
CDC Hume Campus OneColocation Canberra, Australia Operational 21 MW 2008 Operator / official
CDC GregadooHyperscale Wagga Wagga, Australia Planned — — Operator / official
CDC HazelmereHyperscale Perth, Australia Planned — — Operator / official
CDC Kemps CreekHyperscale Sydney, Australia Planned — — Operator / official
CDC MaddingtonHyperscale Perth, Australia Under construction — — Operator / official

Market position

How CDC Data Centres compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Australia, CDC Data Centres ranks #2 of 11 tracked operators by capacity, with 29% of the country’s tracked MW.
  • Australia has 81 tracked data centers from 11 operators: 2,206 MW operational and 3,311 MW under construction or planned.
  • In New Zealand, CDC Data Centres ranks #2 of 7 tracked operators by capacity, with 20% of the country’s tracked MW.
  • Canberra also hosts 4 other tracked data center(s), run by NEXTDC, Macquarie Data Centres, Equinix and DCI Data Centers.
  • Our Deal Tracker lists 1 deal(s) naming CDC Data Centres, the latest on 22 September 2026.

Data center operators in Australia

Tracked facilities8111 operators
Operational capacity2,206 MW3,311 MW in the pipeline
CDC Data Centres rank by capacity#2of 11 operators · 29%
Renewable share of generation39%2025
OperatorFacilitiesOperational MWPipeline MW
NEXTDC25557 MW1,167 MW
AirTrunk6700 MW354 MW
Keppel2—720 MW
STACK Infrastructure4180 MW—
DCI Data Centers65.4 MW63 MW
Macquarie Data Centres368 MW—
Vantage Data Centers1—64 MW
Equinix1828 MW—

All data centers in Australia Power and policy in Australia

Data center operators in New Zealand

Tracked facilities177 operators
Operational capacity113 MW365 MW in the pipeline
CDC Data Centres rank by capacity#2of 7 operators · 20%
OperatorFacilitiesOperational MWPipeline MW
Datagrid1—280 MW
TenPeaks Data Centres815.2 MW70 MW
NEXTDC1—15 MW
DCI Data Centers2——
Microsoft1——
Amazon Web Services1——

All data centers in New Zealand

Other data centers in Canberra

Deals naming CDC Data Centres

  • CDC Data Centres → Four-building campus at 216 Ashfords Road, Gregadoo, near Wagga Wagga Land / campus $10.67B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does CDC Data Centres operate?

DC Market Insights tracks 15 CDC Data Centres data center(s) in 2 countries as of November 2026: 8 operational, 4 under construction and 3 planned.

Which other companies operate data centers in Australia?

Besides CDC Data Centres, the largest operators we track in Australia by capacity are NEXTDC, AirTrunk, Keppel, STACK Infrastructure and DCI Data Centers. The Australia page lists all 11 operators.

What rules apply to data centers in Australia?

Our Power & Policy Tracker lists 17 government actions on data centers and power in Australia, including 0 restriction(s) and 2 incentive scheme(s) in force.

Which other data centers are in Canberra?

Other tracked data centers in Canberra include C1 Canberra (NEXTDC), Canberra Campus (IC4, IC5) (Macquarie Data Centres), CA1 (Equinix) and CBR01 (DCI Data Centers).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst