In short

As of 29 November 2026, DC Market Insights tracks 11 data centers operated by Cipher Digital in 1 country, of which 2 are operational. Stated operational capacity is 423 MW, with a further 370 MW under construction and 3,240 MW planned. The pipeline is 8.5 times the capacity already operating.

11Facilities tracked
1Countries
423 MWOperational (2 sites)
370 MWUnder construction (2 sites)
3,240 MWPlanned (7 sites)

MW = IT capacity where the source states it, otherwise total capacity. 11 of 11 facilities have a stated capacity; the others are counted as sites only.

Cipher Odessa · Cipher Digital · Odessa (approximate location)Cipher Black Pearl · Cipher Digital · Wink (approximate location)Cipher Barber Lake · Cipher Digital · Colorado City (approximate location)Cipher Stingray · Cipher Digital · Andrews (approximate location)Cipher Reveille · Cipher Digital · Cotulla (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Cipher Digital data centers: key facts

  • Capacity under construction or planned (3,610 MW) is 8.5 times the operational base of 423 MW.
  • Its largest operational site is Cipher Black Pearl in Wink, United States at 216 MW.
  • The largest project in the pipeline is Cipher Colchis (1,000 MW, planned).
  • By type, the tracker lists 10 hyperscale and 1 other facilities.
Capacity by status, MW
Operational423 MW
Under construction370 MW
Planned3,240 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities by type
Hyperscale10
Other1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Cipher Digital development pipeline

Under construction and planned facilities with a stated capacity, largest first. 370 MW under construction and 3,240 MW planned in total.

ProjectLocationStatusTypeCapacity
Cipher ColchisCipher Digital United States Planned Hyperscale 1,000 MW
Cipher ApolloCipher Digital United States Planned Hyperscale 900 MW
Cipher McLennanCipher Digital United States Planned Hyperscale 500 MW
Cipher MikeskaCipher Digital United States Planned Hyperscale 500 MW
Cipher Barber LakeCipher Digital Colorado City, United States Under construction Hyperscale 300 MW
Cipher UlyssesCipher Digital United States Planned Hyperscale 200 MW
Cipher StingrayCipher Digital Andrews, United States Under construction Hyperscale 70 MW
Cipher HorizonCipher Digital United States Planned Hyperscale 70 MW
Cipher ReveilleCipher Digital Cotulla, United States Planned Hyperscale 70 MW

Facilities

11 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Cipher ColchisHyperscale
History
  1. Planned
  2. Planned
United States Planned 1,000 MW total — Operator / official
Cipher ApolloHyperscale United States Planned 900 MW total — Operator / official
Cipher McLennanHyperscale
History
  1. Planned
  2. Planned
United States Planned 500 MW total — Operator / official
Cipher MikeskaHyperscale
History
  1. Planned
  2. Planned
United States Planned 500 MW total — Operator / official
Cipher Barber LakeHyperscale
History
  1. Under construction
  2. Under construction
  3. Under construction
  4. Under construction
Colorado City, United States Under construction 300 MW total — Operator / official
Cipher Black PearlHyperscale
History
  1. Operational
  2. Under construction
  3. Operational
  4. Operational
Wink, United States Operational 216 MW IT — Operator / official
Cipher OdessaOther
History
  1. Operational
  2. Operational
Odessa, United States Operational 207 MW 2022 Operator / official
Cipher UlyssesHyperscale
History
  1. Planned
  2. Planned
United States Planned 200 MW total — Operator / official
Cipher HorizonHyperscale United States Planned 70 MW — Operator / official
Cipher ReveilleHyperscale
History
  1. Planned
  2. Planned
Cotulla, United States Planned 70 MW total — Operator / official
Cipher StingrayHyperscale
History
  1. Under construction
  2. Under construction
  3. Under construction
Andrews, United States Under construction 70 MW IT — Operator / official

Market position

How Cipher Digital compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Cipher Digital ranks #5 of 176 tracked operators by capacity, with 4.2% of the country’s tracked MW.
  • United States has 1,382 tracked data centers from 176 operators: 14,179 MW operational and 82,396 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Our Deal Tracker lists 2 deal(s) naming Cipher Digital, the latest on 14 October 2026.

Data center operators in United States

Tracked facilities1,382176 operators
Operational capacity14,179 MW82,396 MW in the pipeline
Cipher Digital rank by capacity#5of 176 operators · 4.2%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
IREN4750 MW3,600 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Crusoe51,200 MW1,672 MW

All data centers in United States Power and policy in United States

Deals naming Cipher Digital

  • Qualified institutional buyers (initial purchasers) → Cipher Digital (funds additional equity in Barber Lake data center project) Financing $850.0M
  • Fluidstack and a leading AI lab (tenants) → Cipher Digital Barber Lake data center, Colorado City, Texas Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Cipher Digital operate?

DC Market Insights tracks 11 Cipher Digital data center(s) in 1 country as of November 2026: 2 operational, 2 under construction and 7 planned.

Which other companies operate data centers in United States?

Besides Cipher Digital, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, IREN and Vantage Data Centers. The United States page lists all 176 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst