Proprietary data
Cipher Digital Data Centers
Data centers operated by Cipher Digital that we have verified: location, status and capacity, each checked against its source.
In short
As of 29 November 2026, DC Market Insights tracks 11 data centers operated by Cipher Digital in 1 country, of which 2 are operational. Stated operational capacity is 423 MW, with a further 370 MW under construction and 3,240 MW planned. The pipeline is 8.5 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 11 of 11 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Cipher Digital data centers: key facts
- Capacity under construction or planned (3,610 MW) is 8.5 times the operational base of 423 MW.
- Its largest operational site is Cipher Black Pearl in Wink, United States at 216 MW.
- The largest project in the pipeline is Cipher Colchis (1,000 MW, planned).
- By type, the tracker lists 10 hyperscale and 1 other facilities.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Cipher Digital development pipeline
Under construction and planned facilities with a stated capacity, largest first. 370 MW under construction and 3,240 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Cipher ColchisCipher Digital | United States | Planned | Hyperscale | 1,000 MW |
| Cipher ApolloCipher Digital | United States | Planned | Hyperscale | 900 MW |
| Cipher McLennanCipher Digital | United States | Planned | Hyperscale | 500 MW |
| Cipher MikeskaCipher Digital | United States | Planned | Hyperscale | 500 MW |
| Cipher Barber LakeCipher Digital | Colorado City, United States | Under construction | Hyperscale | 300 MW |
| Cipher UlyssesCipher Digital | United States | Planned | Hyperscale | 200 MW |
| Cipher StingrayCipher Digital | Andrews, United States | Under construction | Hyperscale | 70 MW |
| Cipher HorizonCipher Digital | United States | Planned | Hyperscale | 70 MW |
| Cipher ReveilleCipher Digital | Cotulla, United States | Planned | Hyperscale | 70 MW |
Facilities
11 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Cipher ColchisHyperscale
History
|
United States | Planned | 1,000 MW total | — | Operator / official |
| Cipher ApolloHyperscale | United States | Planned | 900 MW total | — | Operator / official |
Cipher McLennanHyperscale
History
|
United States | Planned | 500 MW total | — | Operator / official |
Cipher MikeskaHyperscale
History
|
United States | Planned | 500 MW total | — | Operator / official |
Cipher Barber LakeHyperscale
History
|
Colorado City, United States | Under construction | 300 MW total | — | Operator / official |
Cipher Black PearlHyperscale
History
|
Wink, United States | Operational | 216 MW IT | — | Operator / official |
Cipher OdessaOther
History
|
Odessa, United States | Operational | 207 MW | 2022 | Operator / official |
Cipher UlyssesHyperscale
History
|
United States | Planned | 200 MW total | — | Operator / official |
| Cipher HorizonHyperscale | United States | Planned | 70 MW | — | Operator / official |
Cipher ReveilleHyperscale
History
|
Cotulla, United States | Planned | 70 MW total | — | Operator / official |
Cipher StingrayHyperscale
History
|
Andrews, United States | Under construction | 70 MW IT | — | Operator / official |
Market position
How Cipher Digital compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Cipher Digital ranks #5 of 176 tracked operators by capacity, with 4.2% of the country’s tracked MW.
- United States has 1,382 tracked data centers from 176 operators: 14,179 MW operational and 82,396 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Our Deal Tracker lists 2 deal(s) naming Cipher Digital, the latest on 14 October 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| IREN | 4 | 750 MW | 3,600 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Crusoe | 5 | 1,200 MW | 1,672 MW |
All data centers in United States Power and policy in United States
Deals naming Cipher Digital
- Qualified institutional buyers (initial purchasers) → Cipher Digital (funds additional equity in Barber Lake data center project) Financing $850.0M
- Fluidstack and a leading AI lab (tenants) → Cipher Digital Barber Lake data center, Colorado City, Texas Land / campus
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Cipher Digital operate?
DC Market Insights tracks 11 Cipher Digital data center(s) in 1 country as of November 2026: 2 operational, 2 under construction and 7 planned.
Which other companies operate data centers in United States?
Besides Cipher Digital, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, IREN and Vantage Data Centers. The United States page lists all 176 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.