Proprietary data
Tract Data Centers
Data centers operated by Tract that we have verified: location, status and capacity, each checked against its source.
In short
As of 19 October 2026, DC Market Insights tracks 19 data centers operated by Tract in 1 country, of which 0 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 13 of 19 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Tract data centers: key facts
About Tract
Tract is a Denver-based developer of master-planned data center parks: it buys and entitles large land sites, brings power and water, and sells or leases ready sites to hyperscalers and operators. In its 15 April 2026 release Tract said it has over 25 GW of planned capacity and over 25,000 acres of land under control, with campuses in Arizona, Iowa, Illinois, Minnesota, Nevada, Texas, Utah and Virginia. Its projects page (October 2026) lists 14 parks.
- Headquarters
- Denver, United States
- Ownership
- Private; a strategy of Tract Capital Management
- Parent company
- Tract Capital Management
- Tracked footprint
- 19 facilities in 1 country
- Website
- tract.com
Data center business
- Tract does not run data halls itself. It acquires large land parcels, secures zoning (often by-right data center use), utility studies, transmission and water, and builds horizontal infrastructure so that hyperscalers and operators can build campuses faster. Its boilerplate describes it as providing master-planned data center parks to give speed and certainty in developing new capacity.
- Caldwell Valley Technology Park in Caldwell County, Texas, is Tract's largest stated capacity: more than 4 GW across nearly 3,000 acres, an onsite substation planned with Bluebonnet and LCRA that scales to 1.6 GW, grid interconnection plus onsite natural gas, and the first 250 MW contracted for delivery in Q1 2028.
- Tract is part of Tract Capital Management, which in January 2025 introduced a separate platform, Fleet Data Centers, to develop customized 500 MW campuses; Fleet is tracked apart from Tract's land parks.
- Peru Shelf was Tract's first park to break ground (30 April 2024): horizontal development of roads, wet utilities and NV Energy switch stations on 686 acres, supporting up to 810 MW of utility capacity at full buildout, with initial power expected late 2026 or early 2027.
- The projects page lists 14 parks with stated capacity: Buckeye, AZ (2,019 acres, 1,800 MW); Morris, IL (344 acres, 1,000 MW); Altoona, IA (468 acres, 1,000 MW); Caldwell Valley, TX (2,973 acres, 4,000 MW); Applewhite, San Antonio (339 acres, 720 MW); Medina County, TX (265 acres, 500 MW); Pole Canyon, Eagle Mountain, UT (844 acres, 1,700 MW); and five Nevada parks.
- Nevada is Tract's largest land position: Peru Shelf (686 acres, 810 MW) and Peru Ridge (517 acres, 230 MW) in the Tahoe-Reno Industrial Center, South Valley (1,534 acres, 1,215 MW, on-site 525/345 kV substation) and Virginia Highlands (8,590 acres, 2,500 MW) in Storey County, and Sapphire near Silver Springs (1,063 acres, 700 MW under utility study).
- Medina Technology Park (265 acres, 500 MW) sits next to a Microsoft campus in Castroville, Texas, with power from Medina Electric Cooperative and energization planned for mid-2028; Applewhite (720 MW) is on the south side of San Antonio and zoned MI-1 industrial.
Recent updates
- FERC approved a Transmission Security Agreement between ComEd and Tract (through Grundy County Power NR I, LLC) for the 1 GW Morris Technology Park, with committed revenue contributions, minimum usage and shortfall payments; initial energization is targeted for June 2028 and full 1 GW load by 2032.
- Tract entered the Greater Chicago market by buying a 343-acre parcel in Morris, Illinois, fully zoned and entitled, to support 2.9 million sq ft and 1 GW at full build-out. Graham Williams is President of Tract.
- Tract closed two acquisitions adding 1,458 contiguous acres to Caldwell Valley Technology Park, taking the campus to nearly 3,000 acres and more than 4 GW of supportable capacity.
- Tract entered the Des Moines market with a 453-acre, fully entitled site in Altoona, Iowa, on existing 345kV lines, able to support over 1 GW over time.
Company details checked against company and official sources, 19 Oct 2026.
- The largest project in the pipeline is Tract Caldwell Valley Technology Park (4,000 MW, planned).
- By type, the tracker lists 18 hyperscale and 1 other facilities.
- 13 of 19 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Tract development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 17,275 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Tract Caldwell Valley Technology ParkTract | United States | Planned | Hyperscale | 4,000 MW |
| Tract Virginia Highlands Technology ParkTract | United States | Planned | Hyperscale | 2,500 MW |
| Tract Hanover Technology ParkTract | United States | Planned | Hyperscale | 2,400 MW |
| Tract Buckeye Technology ParkTract | Buckeye, United States | Planned | Hyperscale | 1,800 MW |
| Tract South Valley Technology ParkTract | United States | Planned | Hyperscale | 1,215 MW |
| Tract AltoonaTract | Altoona, United States | Planned | Hyperscale | 1,000 MW |
| Tract Morris Technology ParkTract | Morris, United States | Planned | Hyperscale | 1,000 MW |
| Tract Peru Shelf Technology ParkTract | United States | Planned | Hyperscale | 810 MW |
| Tract Applewhite Technology ParkTract | San Antonio, United States | Planned | Hyperscale | 720 MW |
| Tract Sapphire Technology Park (Silver Springs)Tract | Silver Springs, United States | Planned | Hyperscale | 700 MW |
| Tract Medina Technology ParkTract | United States | Planned | Hyperscale | 500 MW |
| Tract Eagle Mountain (Project Tripletail)Tract | Eagle Mountain, United States | Planned | Hyperscale | 400 MW |
Facilities
19 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Tract Caldwell Valley Technology ParkHyperscale
History
|
United States | Planned | 4,000 MW total | — | Operator / official |
| Tract Virginia Highlands Technology ParkHyperscale | United States | Planned | 2,500 MW total | — | Operator / official |
Tract Hanover Technology ParkHyperscale
History
|
United States | Planned | 2,400 MW total | — | Operator / official |
| Tract Buckeye Technology ParkHyperscale | Buckeye, United States | Planned | 1,800 MW total | — | Operator / official |
| Tract South Valley Technology ParkHyperscale | United States | Planned | 1,215 MW total | — | Operator / official |
Tract AltoonaHyperscale
History
|
Altoona, United States | Planned | 1,000 MW total | — | Operator / official |
Tract Morris Technology ParkHyperscale
History
|
Morris, United States | Planned | 1,000 MW total | — | Operator / official |
Tract Peru Shelf Technology ParkHyperscale
History
|
United States | Planned | 810 MW total | — | Operator / official |
| Tract Applewhite Technology ParkHyperscale | San Antonio, United States | Planned | 720 MW total | — | Operator / official |
| Tract Sapphire Technology Park (Silver Springs)Hyperscale | Silver Springs, United States | Planned | 700 MW total | — | Operator / official |
| Tract Medina Technology ParkHyperscale | United States | Planned | 500 MW total | — | Operator / official |
| Tract Eagle Mountain (Project Tripletail)Hyperscale | Eagle Mountain, United States | Planned | 400 MW total | — | Operator / official |
| Tract Peru Ridge Technology ParkHyperscale | United States | Planned | 230 MW total | — | Operator / official |
| Tract Cannon FallsHyperscale | Cannon Falls, United States | Planned | — | — | Trade press |
| Tract Chesterfield campusHyperscale | United States | Planned | — | — | Trade press |
| Tract Farmington Technology ParkHyperscale Cooling: Evaporative or adiabatic | Farmington, United States | Planned | — | — | Trade press |
| Tract NorwalkHyperscale | Norwalk, United States | Planned | — | — | Trade press |
| Tract RosemountHyperscale | Rosemount, United States | Planned | — | — | Trade press |
| Tract Storey County data center parkOther | United States | Planned | — | — | Trade press |
Market position
How Tract compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Tract ranks #1 of 171 tracked operators by capacity, with 22% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Silver Springs also hosts 1 other tracked data center(s), run by Microsoft.
- Our Deal Tracker lists 2 deal(s) naming Tract, the latest on 9 October 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
| QTS | 47 | 1,977 MW | 283 MW |
All data centers in United States Power and policy in United States
Other data centers in Silver Springs
- Microsoft Silver Springs · Microsoft · Planned
Deals naming Tract
- Power Champion Investment Limited (customer) → Initial 10MW contracted capacity (expansion rights to 50MW), Atlas One compute infrastructure campus Land / campus $90.0M
- TeraWulf → Muskie Data Campus, eastern Kentucky (contracted power raised from 500MW to 1GW) Power deal
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Tract operate?
DC Market Insights tracks 19 Tract data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 19 planned.
Where is Tract headquartered?
Tract is headquartered in Denver, United States. Ownership: Private; a strategy of Tract Capital Management.
Which other companies operate data centers in United States?
Besides Tract, the largest operators we track in United States by capacity are PowerHouse Data Centers, Meta, Vantage Data Centers, Beale Infrastructure and OpenAI. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Silver Springs?
Other tracked data centers in Silver Springs include Microsoft Silver Springs (Microsoft).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.