PowerHouse Data Centers Data Centers
Data centers operated by PowerHouse Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 10 October 2026, DC Market Insights tracks 17 data centers operated by PowerHouse Data Centers in 1 country, of which 1 are operational. Stated operational capacity is 60 MW, with a further 385 MW under construction and 8,422 MW planned. The pipeline is 146.8 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 15 of 17 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
PowerHouse Data Centers data centers: key facts
About PowerHouse Data Centers
PowerHouse Data Centers is a real-estate solutions provider delivering build-to-suit shell and full turnkey data center deployments in the United States, with campuses in Virginia, Texas, Pennsylvania, North Carolina, Nevada, Indiana, Illinois and Kentucky.
- Headquarters
- McLean
- Founded
- 2021
- Ownership
- Wholly owned and operated by American Real Estate Partners (AREP)
- Parent company
- American Real Estate Partners (AREP)
- Tracked footprint
- 17 facilities in 1 country
- Website
- powerhousedata.com
Data center business
- PowerHouse ABX-1 in Ashburn, 60 MW, was delivered October 2023 and is shown as sold in Q4 2024.
- Website lists campuses in Northern Virginia, Richmond VA, Spotsylvania VA, Texas, Pennsylvania, North Carolina, Nevada, Indiana, Illinois and Kentucky; Carlisle PA is listed at 1.35 GW and Joliet IL at 1.8 GW.
- Designs are described as geared toward high performance computing, high density power and immersive cooling; offerings include build-to-suit shells and full turnkey deployments.
Recent updates
- Brookfield affiliates agreed to acquire a minority interest in AREP; closing expected Q4 2026, amount not disclosed.
- Executed a long-term hyperscale lease at PowerHouse Arcola, a 37-acre Loudoun County campus with up to 120 MW of utility capacity.
- Joint venture with Pennsylvania Data Center Partners for a 1.35 GW campus in the Carlisle area, Pennsylvania.
- Blue Owl, CTP and PowerHouse closed a $750 million second tranche of their joint venture, with capacity to deploy up to $5 billion.
- Announced the Grand Prairie, Texas campus with Provident, on 768 acres with a 1,800 MW planned switchyard.
- Partnered with Poe Companies on a Louisville, Kentucky hyperscale campus of 400 MW.
- Announced PowerHouse Charlotte, a 122-acre campus with four buildings in two phases, in permitting.
Company details checked against company and official sources, 9 Nov 2026.
- Capacity under construction or planned (8,807 MW) is 146.8 times the operational base of 60 MW.
- Its largest operational site is PowerHouse ABX-1 in Ashburn, United States at 60 MW.
- The largest project in the pipeline is Joliet Technology Center by PowerHouse Data Centers (1,800 MW, planned).
- By type, the tracker lists 16 hyperscale and 1 colocation facilities.
- 15 of 17 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
PowerHouse Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 385 MW under construction and 8,422 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Joliet Technology CenterPowerHouse Data Centers | Joliet, United States | Planned | Hyperscale | 1,800 MW |
| PowerHouse Grand PrairiePowerHouse Data Centers | Grand Prairie, United States | Planned | Hyperscale | 1,800 MW |
| PowerHouse PAX-1PowerHouse Data Centers | Carlisle, United States | Planned | Hyperscale | 1,350 MW |
| PowerHouse 95PowerHouse Data Centers | United States | Planned | Hyperscale | 900 MW |
| PowerHouse MerrillvillePowerHouse Data Centers | Merrillville, United States | Planned | Hyperscale | 750 MW |
| PowerHouse HobartPowerHouse Data Centers | Hobart, United States | Planned | Hyperscale | 450 MW |
| PowerHouse LouisvillePowerHouse Data Centers | Louisville, United States | Planned | Hyperscale | 402 MW |
| PowerHouse Circle TPowerHouse Data Centers | Irving, United States | Planned | Hyperscale | 300 MW |
| PowerHouse La PortePowerHouse Data Centers | La Porte, United States | Planned | Hyperscale | 300 MW |
| PowerHouse PacificPowerHouse Data Centers | Ashburn, United States | Under construction | Hyperscale | 265 MW |
| PowerHouse IrvingPowerHouse Data Centers | Irving, United States | Planned | Hyperscale | 200 MW |
| PowerHouse Red OakPowerHouse Data Centers | Red Oak, United States | Planned | Hyperscale | 150 MW |
Facilities
17 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Joliet Technology CenterHyperscale | Joliet, United States | Planned | 1,800 MW total | — | Operator / official |
| PowerHouse Grand PrairieHyperscale | Grand Prairie, United States | Planned | 1,800 MW total | — | Operator / official |
| PowerHouse PAX-1Hyperscale | Carlisle, United States | Planned | 1,350 MW total | — | Operator / official |
| PowerHouse 95Hyperscale | United States | Planned | 900 MW total | — | Operator / official |
| PowerHouse MerrillvilleHyperscale | Merrillville, United States | Planned | 750 MW total | — | Operator / official |
| PowerHouse HobartHyperscale | Hobart, United States | Planned | 450 MW total | — | Operator / official |
PowerHouse LouisvilleHyperscale
Joint venture: PowerHouse Data Centers (AREP) and Poe Companies
History
|
Louisville, United States | Planned | 402 MW total | — | Operator / official |
| PowerHouse Circle THyperscale | Irving, United States | Planned | 300 MW total | — | Operator / official |
| PowerHouse La PorteHyperscale | La Porte, United States | Planned | 300 MW total | — | Operator / official |
| PowerHouse PacificHyperscale | Ashburn, United States | Under construction | 265 MW total | — | Operator / official |
| PowerHouse IrvingHyperscale | Irving, United States | Planned | 200 MW total | — | Operator / official |
| PowerHouse Red OakHyperscale | Red Oak, United States | Planned | 150 MW total | — | Operator / official |
PowerHouse ArcolaHyperscale
1 deal
|
Arcola, United States | Under construction | 120 MW total | — | Operator / official |
| PowerHouse ABX-1Hyperscale | Ashburn, United States | Operational | 60 MW total | 2023 | Operator / official |
| Quantum ConnectColocation | Ashburn, United States | Planned | 20 MW IT | — | Operator / official |
| PowerHouse CharlotteHyperscale | Charlotte, United States | Planned | — | — | Trade press |
| PowerHouse RenoHyperscale | United States | Under construction | — | — | Trade press |
Market position
How PowerHouse Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, PowerHouse Data Centers ranks #2 of 171 tracked operators by capacity, with 11% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Ashburn also hosts 10 other tracked data center(s), run by Vantage Data Centers, Cologix, QTS and Sabey Data Centers.
- Our Deal Tracker lists 1 deal(s) naming PowerHouse Data Centers, the latest on 14 September 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
| QTS | 47 | 1,977 MW | 283 MW |
All data centers in United States Power and policy in United States
Other data centers in Ashburn
- Vantage Ashburn III (VA3) campus · Vantage Data Centers · Planned · 288 MW
- Cologix Ashburn Beaumeade land (38 acres) · Cologix · Planned · 85 MW
- QTS Ashburn 3 · QTS · Operational · 80 MW
- Sabey SDC Ashburn Building A · Sabey Data Centers · Under construction · 54 MW
- Cologix ASH2 Ashburn · Cologix · Under construction · 51 MW
- H5 Ashburn · H5 Data Centers · Under construction · 42 MW
- IAD3 Ashburn Campus Data Center · DataBank · Operational · 40 MW
- NTT DATA Ashburn VA7 · NTT DATA · Planned · 36 MW
- Centersquare Ashburn IAD4 · Centersquare · Operational · 35.8 MW
- NTT DATA Ashburn VA4 · NTT DATA · Operational · 32 MW
Deals naming PowerHouse Data Centers
- Brookfield (affiliates) → American Real Estate Partners (AREP) – data center development platform (PowerHouse Data Centers) M&A
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does PowerHouse Data Centers operate?
DC Market Insights tracks 17 PowerHouse Data Centers data center(s) in 1 country as of October 2026: 1 operational, 3 under construction and 13 planned.
Which other companies operate data centers in United States?
Besides PowerHouse Data Centers, the largest operators we track in United States by capacity are Tract, Meta, Vantage Data Centers, Beale Infrastructure and OpenAI. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Ashburn?
Other tracked data centers in Ashburn include Vantage Ashburn III (VA3) campus (Vantage Data Centers), Cologix Ashburn Beaumeade land (38 acres) (Cologix), QTS Ashburn 3 (QTS) and Sabey SDC Ashburn Building A (Sabey Data Centers).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.