Proprietary data

IREN Data Centers

Data centers operated by IREN that we have verified: location, status and capacity, each checked against its source.

In short

As of 29 November 2026, DC Market Insights tracks 5 data centers operated by IREN in 2 countries, of which 1 are operational. Stated operational capacity is 750 MW, with a further 2,000 MW under construction and 1,900 MW planned. The pipeline is 5.2 times the capacity already operating.

5Facilities tracked
2Countries
750 MWOperational (1 site)
2,000 MWUnder construction (2 sites)
1,900 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 5 facilities have a stated capacity; the others are counted as sites only.

IREN Childress (Horizon 1-4) · IREN · Childress (approximate location)IREN Sweetwater 1 · IREN · Sweetwater (approximate location)IREN Sweetwater 2 · IREN · Sweetwater (approximate location)IREN Badajoz · IREN · Badajoz (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

IREN data centers: key facts

  • Capacity under construction or planned (3,900 MW) is 5.2 times the operational base of 750 MW.
  • Its largest operational site is IREN Childress (Horizon 1-4) in Childress, United States at 750 MW.
  • The largest project in the pipeline is IREN Oklahoma campus (Kiowa) (1,600 MW, planned).
  • United States accounts for 94% of tracked capacity (4 facilities).
Capacity by status, MW
Operational750 MW
Under construction2,000 MW
Planned1,900 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Spain300 MW

OperationalUnder construction or planned

IREN development pipeline

Under construction and planned facilities with a stated capacity, largest first. 2,000 MW under construction and 1,900 MW planned in total.

ProjectLocationStatusTypeCapacity
IREN Oklahoma campus (Kiowa)IREN United States Planned Hyperscale 1,600 MW
IREN Sweetwater 1IREN Sweetwater, United States Under construction Hyperscale 1,400 MW
IREN Sweetwater 2IREN Sweetwater, United States Under construction Hyperscale 600 MW
IREN BadajozIREN Badajoz, Spain Planned Hyperscale 300 MW

Facilities

5 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
IREN Oklahoma campus (Kiowa)Hyperscale
History
  1. Announced
  2. Planned
United States Planned 1,600 MW — Operator / official
IREN Sweetwater 1Hyperscale
History
  1. Under construction
  2. Under construction
Sweetwater, United States Under construction 1,400 MW — Operator / official
IREN Childress (Horizon 1-4)Hyperscale
History
  1. Operational
  2. Under construction
  3. Operational
Childress, United States Operational 750 MW — Operator / official
IREN Sweetwater 2Hyperscale
History
  1. Under construction
  2. Under construction
Sweetwater, United States Under construction 600 MW — Operator / official
IREN BadajozHyperscale
History
  1. Planned
  2. Planned
  3. Planned
Badajoz, Spain Planned 300 MW — Operator / official

Market position

How IREN compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, IREN ranks #4 of 175 tracked operators by capacity, with 4.7% of the country’s tracked MW.
  • United States has 1,371 tracked data centers from 175 operators: 13,756 MW operational and 78,786 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In Spain, IREN ranks #2 of 20 tracked operators by capacity, with 25% of the country’s tracked MW.

Data center operators in United States

Tracked facilities1,371175 operators
Operational capacity13,756 MW78,786 MW in the pipeline
IREN rank by capacity#4of 175 operators · 4.7%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Crusoe51,200 MW1,672 MW
Aligned Data Centers29154 MW2,648 MW

All data centers in United States Power and policy in United States

Data center operators in Spain

Tracked facilities4220 operators
Operational capacity79.4 MW1,115 MW in the pipeline
IREN rank by capacity#2of 20 operators · 25%
Industrial power price113 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tillion1—300 MW
Grupo SAMCA1—216 MW
Data4250 MW50 MW
ACS1—100 MW
Ark Data Centres1—65 MW
Prime Data Centers1—40 MW
AtlasEdge1—24 MW
Iron Mountain33 MW20 MW

All data centers in Spain Power and policy in Spain

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does IREN operate?

DC Market Insights tracks 5 IREN data center(s) in 2 countries as of November 2026: 1 operational, 2 under construction and 2 planned.

Which other companies operate data centers in United States?

Besides IREN, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 175 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst