As of 1 November 2026, DC Market Insights tracks 6 data centers operated by Beale Infrastructure in 1 country, of which 0 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 5 of 6 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Beale Infrastructure data centers: key facts
About Beale Infrastructure
Beale Infrastructure is a US developer of large data center campuses backed by funds managed by Blue Owl Capital. Its own locations page lists five campuses in October 2026: Marana and Pima County near Tucson, Arizona; Claremore and Tulsa County near Tulsa, Oklahoma; and De Soto near Kansas City, Kansas, with stated capacities from 450 MW to 1.5 GW per site.
- Headquarters
- United States
- Ownership
- Portfolio company of funds managed by Blue Owl Capital
- Parent company
- Blue Owl Capital
- Tracked footprint
- 6 facilities in 1 country
- Website
- bealeinfra.com
Data center business
- Beale describes itself as a digital infrastructure development and construction platform that develops and operates data centers, working with utilities, communities and regional leaders. It says it is backed by Blue Owl, a long-term institutional investor in infrastructure and real assets.
- The company's locations page lists five campuses with stated capacity and land: Marana, AZ 1.5 GW expansion capacity on 600 acres; Pima County, AZ 600 MW expected on 300 acres; Claremore, OK 450 MW expected on 282 acres; Tulsa County, OK 500 MW on 505 acres; De Soto, KS 600 MW expected on 290 acres.
- Tulsa County campus (previously Project Clydesdale), at Whirlpool Drive and East 76th Street next to Cherokee Industrial Park west of Owasso, sits on about 506 acres with four planned phases. Construction started in fall 2025; Phase 1 completion is set for Q3 2027 and Phase 2 starts in Q1 2027, with at least $700 million of private capital per phase. Power comes from Public Service Company of Oklahoma.
- Pima County campus (Project Bobcat) is in the South Houghton Industrial Campus south-east of Tucson. Pima County approved the Specific Plan in June 2025, construction was to start in Q1 2026 and Phase 1 is due in 2028, with about $3.6 billion of capital investment and power from Tucson Electric Power. This is the site first proposed as Project Blue; the county land was conveyed to Bobcat B1 LLC in December 2025.
- Luckett Road Data Center in Marana, about 20 miles north of Tucson, is a planned multi-building campus. Marana's Planning Commission approved it in December 2025 and the Town Council in January 2026; construction is estimated to start in Q1/Q2 2027 with first occupancy in late 2028 to early 2029. Power: Tucson Electric Power and Trico Electric Cooperative.
- Claremore, Oklahoma campus, north-east of South 4150 Road and Lowry Road, is a planned multi-building campus powered by the Grand River Dam Authority with a closed-loop air-cooled design. Tax incentives were approved in May 2026; Phase 1 construction is due to start in fall 2026 and finish in fall 2028.
- De Soto, Kansas campus, south of K-10, is planned for at least four data center buildings, with power from Evergy and water from Rural Water District #7 and the City of De Soto. The timeline shows a planning commission hearing in April 2026, construction start in spring 2026 and Phase 1 completion in 2029.
Recent updates
- Google and Beale Infrastructure said they are building a new data center campus in unincorporated Tulsa County near Cherokee Industrial Park, west of Owasso, with Beale funding a new on-site substation.
- Beale signed the Ratepayer Protection Pledge, saying the power and delivery infrastructure a project needs is paid for as part of the build, not passed on to the community.
- Hanns Lee joined Beale Infrastructure to lead development; the leadership page lists him as Chief Development Officer.
- Beale said it will invest about $10 million to replace De Soto's ageing Kansas River water crossing, with a new 24-inch pipeline and an expanded North Well Field; the De Soto data center will use a closed-loop air-cooled system.
- Claremore City Council approved the Tax Incentive District ordinance and the development agreement for Beale's multi-phase campus by a 6-3 vote on 18 May 2026, with related utility agreements.
- Beale withdrew its Project Atlas rezoning application in Coweta, Oklahoma; the city was told on 30 March 2026. The company said: we have made the decision to withdraw our data center project in Coweta.
- Beale named Julian Kudritzki Chief Operating Officer and Courtney Jolicoeur Chief Financial Officer, and said the initial $1 billion phase in Tulsa County was underway with completion expected in early 2027.
Company details checked against company and official sources, 1 Nov 2026.
- The largest project in the pipeline is Luckett Road Data Center by Beale Infrastructure (1,500 MW, planned).
- 5 of 6 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Beale Infrastructure development pipeline
Under construction and planned facilities with a stated capacity, largest first. 1,700 MW under construction and 1,950 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Luckett Road Data CenterBeale Infrastructure | Marana, United States | Planned | Hyperscale | 1,500 MW |
| De Soto campusBeale Infrastructure | De Soto, United States | Under construction | Hyperscale | 600 MW |
| Pima County campus (Project Bobcat, ex-Project Blue)Beale Infrastructure | Tucson, United States | Under construction | Hyperscale | 600 MW |
| Tulsa County campus (Project Clydesdale)Beale Infrastructure | Owasso, United States | Under construction | Hyperscale | 500 MW |
| Claremore data center campusBeale Infrastructure | Claremore, United States | Planned | Hyperscale | 450 MW |
Facilities
6 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Luckett Road Data CenterHyperscale
History
|
Marana, United States | Planned | 1,500 MW | — | Operator / official |
De Soto campusHyperscale
Cooling: Chilled water, dry coolers
History
|
De Soto, United States | Under construction | 600 MW | — | Operator / official |
Pima County campus (Project Bobcat, ex-Project Blue)Hyperscale
History
|
Tucson, United States | Under construction | 600 MW | — | Operator / official |
Tulsa County campus (Project Clydesdale)Hyperscale
History
|
Owasso, United States | Under construction | 500 MW | — | Operator / official |
Claremore data center campusHyperscale
History
|
Claremore, United States | Planned | 450 MW | — | Operator / official |
| Beale Coweta data centerHyperscale | Coweta, United States | Planned | — | — | Trade press |
Market position
How Beale Infrastructure compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Beale Infrastructure ranks #5 of 171 tracked operators by capacity, with 4.7% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Tucson also hosts 1 other tracked data center(s), run by Ark Data Centers.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
| QTS | 47 | 1,977 MW | 283 MW |
All data centers in United States Power and policy in United States
Other data centers in Tucson
- Ark Tucson Data Center · Ark Data Centers · Operational · 2.1 MW
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Beale Infrastructure operate?
DC Market Insights tracks 6 Beale Infrastructure data center(s) in 1 country as of November 2026: 0 operational, 3 under construction and 3 planned.
Where is Beale Infrastructure headquartered?
Beale Infrastructure is headquartered in United States. Ownership: Portfolio company of funds managed by Blue Owl Capital.
Which other companies operate data centers in United States?
Besides Beale Infrastructure, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and OpenAI. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Tucson?
Other tracked data centers in Tucson include Ark Tucson Data Center (Ark Data Centers).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.