Proprietary data
Goodman Data Centers
Data centers operated by Goodman that we have verified: location, status and capacity, each checked against its source.
In short
As of 25 November 2026, DC Market Insights tracks 2 data centers operated by Goodman in 2 countries, of which 0 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 1 of 2 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Goodman data centers: key facts
- The largest project in the pipeline is Tsukuba Tech Central phase 1 by Goodman (50 MW, under construction).
- Japan accounts for 100% of tracked capacity (1 facilities).
- 1 of 2 facilities have a capacity stated by their source; the totals above count only those.
Goodman development pipeline
Under construction and planned facilities with a stated capacity, largest first. 50 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Tsukuba Tech Central phase 1Goodman | Tsukuba, Japan | Under construction | Hyperscale | 50 MW |
Facilities
2 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Tsukuba Tech Central phase 1Hyperscale | Tsukuba, Japan | Under construction | 50 MW | — | Operator / official |
| Goodman Data-Center FRA II (buildings A and B)Hyperscale | Neu-Isenburg, Germany | Planned | — | — | Operator / official |
Market position
How Goodman compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Germany, Goodman is one of 63 operators we track.
- Germany has 200 tracked data centers from 63 operators: 933 MW operational and 4,386 MW under construction or planned.
- Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
- In Japan, Goodman ranks #14 of 26 tracked operators by capacity, with 2% of the country’s tracked MW.
- Our Deal Tracker lists 3 deal(s) naming Goodman, the latest on 4 November 2026.
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AirTrunk | 4 | 410 MW | 120 MW |
| NTT DATA | 5 | 30 MW | 360 MW |
| Colt DCS | 9 | 101 MW | 262 MW |
| SoftBank | 10 | 100 MW | 150 MW |
| EdgeConneX | 1 | — | 200 MW |
| ESR | 3 | 25 MW | 90 MW |
| CloudHQ | 1 | — | 96.4 MW |
| CyrusOne | 2 | — | 96 MW |
All data centers in Japan Power and policy in Japan
Deals naming Goodman
- Goodman Group; Digital Realty (jointly owned entity) → Up to 9.9% of NEXTDC Ltd (ASX: NXT) M&A $501.1M
- Standard Chartered (lead coordinator), Mizuho Bank, OCBC, Societe Generale, UOB → STTGDC Tokyo campus (TYO1 and TYO2), Goodman Business Park, Inzai Financing $588.7M
- Investors in Goodman Hong Kong Data Centre Partnership → Goodman Hong Kong Data Centre Partnership (GHKDC) Financing $455.0M
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Goodman operate?
DC Market Insights tracks 2 Goodman data center(s) in 2 countries as of November 2026: 0 operational, 1 under construction and 1 planned.
Which other companies operate data centers in Germany?
Besides Goodman, the largest operators we track in Germany by capacity are NTT DATA, CloudHQ, AM:PM Grund, Telis Energie Deutschland and Schwarz Digits (STACKIT). The Germany page lists all 63 operators.
What rules apply to data centers in Germany?
Our Power & Policy Tracker lists 28 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
