Colt DCS Data Centers
Data centers operated by Colt DCS that we have verified: location, status and capacity, each checked against its source.
In short
As of 22 October 2026, DC Market Insights tracks 33 data centers operated by Colt DCS in 7 countries, of which 14 are operational. Stated operational capacity is 232 MW, with a further 123 MW under construction and 618 MW planned. The pipeline is 3.2 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 28 of 33 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Colt DCS data centers: key facts
About Colt DCS
Colt DCS (Colt Data Centre Services) designs, builds and operates hyperscale and colocation data centres for cloud providers and large enterprises in Europe and Asia. Its website (October 2026) states 15 operational data centres and 12 in development across 9 cities in the UK, France, Germany, the Netherlands, India and Japan, and 10 owned sites to develop from 190MW to 1GW in 10 years.
- Headquarters
- London, United Kingdom
- Parent company
- Colt Group Holdings Limited
- Tracked footprint
- 33 facilities in 7 countries
- Website
- coltdatacentres.net
Data center business
- The CY2025 sustainability report states a global PUE of 1.41, 100% renewable electricity in Scope 2 through certificates and a 27% cut in Scope 1, 2 (market-based) and 3 emissions against 2019. New builds follow a reference design targeting annualised PUE below 1.2, and the company targets net zero operational emissions by 2045.
- Colt DCS says it built its first data centres in 1999 and started hyperscale operations in 2016. Its website lists 15 operational data centres and 12 in development across 9 cities, with 10 owned sites to develop from 190MW to 1GW over 10 years. In August 2026 it said it had nearly 800MW of capacity under development.
- United Kingdom: London North in Welwyn Garden City (35MW IT) and London West in Park Royal (9.4MW IT) are operational. On the Hayes campus in west London, London 4 (31MW IT, fully let) is being built, London 5 (31.5MW IT) has planning permission, and London 6, 7 and 8 (27MW, up to 48MW and up to 23MW) take the campus to 160MW of IT power, with first delivery expected in 2028.
- France: Paris South West in Les Ulis (24MW IT) is operational. Paris 2 at Villebon-sur-Yvette (40MW IT, fully let) is under construction, Paris 3 (32MW) and Paris 4 (9.6MW) are planned on the same site with 120MW of contracted power, and Paris 5 and 6 on the Les Ulis 2 parcel are to supply 55MW combined, with 85MW of power contracted.
- Germany and the Netherlands: Frankfurt City and Frankfurt West (25MW IT, fully let) are operational in Frankfurt; Frankfurt 3 in Sossenheim (32.4MW IT) is under construction; Frankfurt 4 and 5 in Wiesbaden are planned at 63MW IT combined; Berlin 1 and 2, 10 km east of Berlin, are planned at 54MW IT with an 80MVA power contract. The Rotterdam data centre in Roosendaal is designed for up to 15MW IT.
- Japan: Colt DCS runs Tokyo Shiohama (5.6MW IT), four Inzai buildings (8, 15 and 27MW operational; Inzai 4 at 20MW under construction and fully sold) and Osaka Keihanna (45MW IT at full build, second phase complete). Inzai 5 (32MW) and Tokyo Yoshikawa in Saitama (80MW) are in development.
- India: through a joint venture with RMZ, Colt DCS runs Mumbai 1 and 2 in Navi Mumbai (22MW IT combined) and is developing a 96MW IT data centre on a 10-acre plot in Ambattur, Chennai, planned to launch in 2027. The partners have committed to develop 250MW across Mumbai and Chennai.
Recent updates
- 15 Oct 2026: Colt DCS and RMZ began construction of Mumbai 3, an AI-ready data centre with 64MW of secured contracted power on the Navi Mumbai campus. It brings the campus to 86MW in operation, out of 148MW at full development, within the partners' USD 1.7 billion India plan.
- 12 Aug 2026: Quy Nguyen was appointed Chief Executive Officer. He had been Acting CEO since April 2026, after the retirement of Niclas Sanfridsson.
- 6 Jul 2026: David Burton was appointed Chief Information Officer.
- 25 Jun 2026: the CY2025 sustainability report showed a 27% reduction in greenhouse gas emissions against the 2019 base year and a global PUE of 1.41.
- 18 May 2026: Fumi Takei was appointed Vice President and Head of Japan.
- 4 Nov 2025: Hillingdon Council resolved to grant planning for three hyperscale data centres (London 6, 7 and 8) and an innovation hub at Hayes Digital Park, part of a GBP 2.5 billion investment taking the campus to 160MW of IT power. Work was expected to start around mid-2026 and London 6 to go live in early 2029.
- 16 Oct 2025: ESR and Colt DCS formed a joint venture to develop the first 65MW phase of a 130MW hyperscale site in Minoh City, Osaka, to be operated by Colt DCS. Construction is to start in 2027, with service readiness expected in late 2029.
Company details checked against company and official sources, 9 Nov 2026.
- Capacity under construction or planned (742 MW) is 3.2 times the operational base of 232 MW.
- Its largest operational site is Osaka Keihanna in Keihanna Science City, Japan at 45 MW.
- The largest project in the pipeline is Osaka Minoh (ESR-Colt DCS JV) by Colt DCS (130 MW, planned).
- Japan accounts for 37% of tracked capacity (9 facilities).
- By type, the tracker lists 26 hyperscale and 7 colocation facilities.
- 28 of 33 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Colt DCS development pipeline
Under construction and planned facilities with a stated capacity, largest first. 123 MW under construction and 618 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Osaka Minoh (ESR-Colt DCS JV)Colt DCS | Minoh, Japan | Planned | Hyperscale | 130 MW |
| Colt Chennai Data Centre (Ambattur)Colt DCS | Chennai, India | Planned | Hyperscale | 96 MW |
| Tokyo YoshikawaColt DCS | Yoshikawa, Japan | Planned | Hyperscale | 80 MW |
| Paris 5 and 6Colt DCS | Les Ulis, France | Planned | Hyperscale | 55 MW |
| Berlin 1 and 2Colt DCS | Berlin (10 km east), Germany | Planned | Hyperscale | 54 MW |
| London 7 (Hayes Digital Park)Colt DCS | Hayes, United Kingdom | Planned | Hyperscale | 48 MW |
| Paris 2Colt DCS | Villebon-sur-Yvette, France | Under construction | Hyperscale | 40 MW |
| Frankfurt 3Colt DCS | Frankfurt am Main, Germany | Under construction | Hyperscale | 32.4 MW |
| Paris 3Colt DCS | Villebon-sur-Yvette, France | Planned | Hyperscale | 32 MW |
| Tokyo Inzai 5Colt DCS | Inzai, Japan | Planned | Hyperscale | 32 MW |
| London 5 (Hayes)Colt DCS | Hayes, United Kingdom | Planned | Hyperscale | 31.5 MW |
| London 4 (Hayes)Colt DCS | Hayes, United Kingdom | Under construction | Hyperscale | 31 MW |
Facilities
33 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Osaka Minoh (ESR-Colt DCS JV)Hyperscale
History
|
Minoh, Japan | Planned | 130 MW total | — | Operator / official |
| Colt Chennai Data Centre (Ambattur)Hyperscale | Chennai, India | Planned | 96 MW IT | — | Operator / official |
| Tokyo YoshikawaHyperscale | Yoshikawa, Japan | Planned | 80 MW IT | — | Operator / official |
| Paris 5 and 6Hyperscale | Les Ulis, France | Planned | 55 MW IT | — | Operator / official |
| Berlin 1 and 2Hyperscale | Berlin (10 km east), Germany | Planned | 54 MW IT | — | Operator / official |
London 7 (Hayes Digital Park)Hyperscale
History
|
Hayes, United Kingdom | Planned | 48 MW IT | — | Operator / official |
| Osaka KeihannaHyperscale | Keihanna Science City, Japan | Operational | 45 MW IT | — | Operator / official |
| Paris 2Hyperscale | Villebon-sur-Yvette, France | Under construction | 40 MW IT | — | Operator / official |
| London NorthColocation | Welwyn Garden City, United Kingdom | Operational | 35 MW IT | — | Operator / official |
| Frankfurt 3Hyperscale | Frankfurt am Main, Germany | Under construction | 32.4 MW IT | — | Operator / official |
| Paris 3Hyperscale | Villebon-sur-Yvette, France | Planned | 32 MW IT | — | Operator / official |
| Tokyo Inzai 5Hyperscale | Inzai, Japan | Planned | 32 MW IT | — | Operator / official |
| London 5 (Hayes)Hyperscale | Hayes, United Kingdom | Planned | 31.5 MW IT | — | Operator / official |
| London 4 (Hayes)Hyperscale | Hayes, United Kingdom | Under construction | 31 MW IT | — | Operator / official |
London 6 (Hayes Digital Park)Hyperscale
History
|
Hayes, United Kingdom | Planned | 27 MW IT | — | Operator / official |
| Tokyo Inzai 3Hyperscale | Inzai, Japan | Operational | 27 MW IT | — | Operator / official |
Frankfurt WestHyperscale
History
|
Frankfurt am Main, Germany | Operational | 25 MW IT | — | Operator / official |
| Paris South WestHyperscale | Les Ulis, France | Operational | 24 MW IT | — | Operator / official |
London 8 (Hayes Digital Park)Hyperscale
History
|
Hayes, United Kingdom | Planned | 23 MW IT | — | Operator / official |
| Mumbai 1 and 2 (Navi Mumbai)Hyperscale | Navi Mumbai, India | Operational | 22 MW IT | 2023 | Operator / official |
| Tokyo Inzai 4Hyperscale | Inzai, Japan | Under construction | 20 MW IT | — | Operator / official |
| RotterdamColocation | Roosendaal, Netherlands | Operational | 15 MW IT | — | Operator / official |
| Tokyo Inzai 2Hyperscale | Inzai, Japan | Operational | 15 MW IT | — | Operator / official |
| Paris 4Hyperscale | Villebon-sur-Yvette, France | Planned | 9.6 MW IT | — | Operator / official |
| London WestColocation | Park Royal, London, United Kingdom | Operational | 9.4 MW IT | — | Operator / official |
| Tokyo Inzai 1Hyperscale | Inzai, Japan | Operational | 8 MW IT | — | Operator / official |
| Tokyo ShiohamaColocation | Koto-ku, Tokyo, Japan | Operational | 5.6 MW IT | — | Operator / official |
| Frankfurt CityColocation | Frankfurt am Main, Germany | Operational | 1.2 MW IT | — | Operator / official |
| Amsterdam South EastColocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| Colt Singapore Data CentreColocation | Singapore, Singapore | Operational | — | — | Operator / official |
| Frankfurt 4Hyperscale | Wiesbaden, Germany | Planned | — | — | Operator / official |
| Frankfurt 5Hyperscale | Wiesbaden, Germany | Planned | — | — | Operator / official |
Mumbai 3 (Navi Mumbai)Hyperscale
History
|
Navi Mumbai, India | Under construction | — | — | Operator / official |
Market position
How Colt DCS compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Japan, Colt DCS ranks #2 of 20 tracked operators by capacity, with 21% of the country’s tracked MW.
- Japan has 74 tracked data centers from 20 operators: 697 MW operational and 1,059 MW under construction or planned.
- In United Kingdom, Colt DCS ranks #13 of 54 tracked operators by capacity, with 2.3% of the country’s tracked MW.
- In Germany, Colt DCS ranks #13 of 56 tracked operators by capacity, with 2.1% of the country’s tracked MW.
- Inzai also hosts 10 other tracked data center(s), run by AirTrunk, ST Telemedia Global Data Centres, Equinix and STACK Infrastructure.
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AirTrunk | 4 | 410 MW | 120 MW |
| EdgeConneX | 1 | — | 200 MW |
| NTT DATA | 3 | 30 MW | 136 MW |
| CloudHQ | 1 | — | 96.4 MW |
| ST Telemedia Global Data Centres | 1 | — | 70.8 MW |
| Vantage Data Centers | 1 | — | 68 MW |
| Equinix | 18 | 54 MW | — |
| CyrusOne | 1 | — | 48 MW |
All data centers in Japan Power and policy in Japan
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Equinix | 15 | — | 250 MW |
All data centers in United Kingdom Power and policy in United Kingdom
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Other data centers in Inzai
- TOK1 · AirTrunk · Operational · 300 MW
- STTGDC Tokyo campus (TYO1 and TYO2) · ST Telemedia Global Data Centres · Under construction · 70.8 MW
- TY12x · Equinix · Operational · 54 MW
- STACK TKY01 Inzai · STACK Infrastructure · Operational · 36 MW
- Google Inzai · Google · Operational
- NRT10 · Digital Realty · Operational
- NRT12 · Digital Realty · Operational
- NRT14 · Digital Realty · Operational
- Tokyo Data Centre 4 · Keppel · Operational
- Tokyo Data Centre 5 · Keppel · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Colt DCS operate?
DC Market Insights tracks 33 Colt DCS data center(s) in 7 countries as of October 2026: 14 operational, 5 under construction and 14 planned.
Where is Colt DCS headquartered?
Colt DCS is headquartered in London, United Kingdom.
Which other companies operate data centers in Japan?
Besides Colt DCS, the largest operators we track in Japan by capacity are AirTrunk, EdgeConneX, NTT DATA, CloudHQ and ST Telemedia Global Data Centres. The Japan page lists all 20 operators.
What rules apply to data centers in Japan?
Our Power & Policy Tracker lists 9 government actions on data centers and power in Japan, including 0 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Inzai?
Other tracked data centers in Inzai include TOK1 (AirTrunk), STTGDC Tokyo campus (TYO1 and TYO2) (ST Telemedia Global Data Centres), TY12x (Equinix) and STACK TKY01 Inzai (STACK Infrastructure).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.